DIVISION 22 • <br /> GENERAL REQUIREMENTS: 2. Foreign matter shall be blown,vacuumed or flushed out of piping,pumps,fans,motors,devices,switches,panels, 1. Route piping in orderly manner,plumb and parallel to building structure,and maintain gradient. ` KAISER <br /> A. Design Intent:Drawings are in part diagrammatic,intended to convey the scope of work and indicate general duct work and equipment. 2. Install piping to allow for expansion and contraction without stressing pipe,joints,or connected equipment. \ / <br /> arrangement of equipment,ducts,piping and approximate sizes and locations of equipment connections.The intended 3. Identification plates on equipment shall be clean,undamaged,and easily readable. PERMANENTE <br /> result of the Contract Documents,which include drawings,specifications,and related documents,is to provide a 3. Provide clearance for installation of insulation and access to valves and fittings. <br /> complete workin Q. Guarantee: <br /> g installation of all systems and equipment,in proper operating condition,finished,tested,and ready 4. Do not run piping through transformer vaults or other electrical or electronic equipment spaces and enclosures. Project <br /> for its intended use(the"Design Intent').Provide all items not specifically shown on the drawings or called for in the 1. The entire installation shall be guaranteed free from defects in material and workmanship for a period of one year S. Maintain 42 inch clearance from switchboards,panel boards and motor control centers. Kaiser Pe rm a n e rite Everett <br /> specifications or related Contract Documents but required to conform to the Design Intent.The scope of work includes from date of final acceptance.The contractor shall provide all labor and material to repair defects that appear. <br /> all labor,material,and equipment to achieve the Design Intent and all necessary and required temporary and 6. Install unions or flanges downstream of valves and at equipment or apparatus connections. MOB Backfill <br /> incidental equipment,connections,services,supports,hoisting and scaffolding,access provisions,tools,appliances, R. Identification: <br /> consumables,fees,permits and licenses,debris removal/disposal,supervision,and labor,including required start-up, 1. Piping System: PLUMBING FIXTURES AND DRAINS: <br /> check-out,and training to provide complete and fully operable systems in compliance with the Contract Documents. a. All piping systems shall be identified by the name of contents and the direction of flow in accordance with ANSI A. Subject to compliance with requirements,provide plumbing fixtures and drains scheduled or approved equal. 2929 PINE STREET <br /> B. Permits,Insurance,Bond:Obtain all permits required for the installation of the work and pay all fees in connection A13.1.Identify all new piping systems. B. Install each fixture with trap,easily removable for servicing and cleaning. EVERETT,WA 98201 <br /> therewith.Provide insurance and bonding as required by the building owner. b. Name of contents and directional arrows near each valve,on both sides of pipes passing through walls,at least C. Provide chrome plated rigid or flexible supplies to fixtures with screwdriver stops,reducers,and escutcheons. <br /> C. Examine the Drawings,Specifications,and other Contract Documents relating to the Work and the work of all trades once within each space and at 30 foot intervals. Prepared for <br /> and become full Informed as to the extent and character of work required.Coordinate all work with that of other S. Penetration Firesto D. Install components level and plumb. KAISER FOUNDATION <br /> Y� q Aping Systems: <br /> trades to ensure proper and complete installation of all materials,equipment,and supports. E. Install and secure fixture in place with chair carriers and bolts as required. <br /> 1. Penetration firestopping systems resist the spread of fire,passage of smoke and other gases,and maintain original D. The drawings,specifications,and related Contract Documents are complementary and interrelated;what is required by fire-resistance rating of construction penetrated.Penetration firestopping systems shall be compatible with one F. Seal fixtures to wall and floor surfaces with sealant. HEALTH PLAN, INC. <br /> one is as if required by another.Information and requirements may be included in one and not another.Before another,with the substrates forming openings,and with penetrating items.All firestop materials for the project are G. Clean all fixtures,adjust water flows as scheduled,and adjust automatic sensors. NATIONAL FACILITIES SERVICES <br /> proceeding with any work,conduct a full and thorough review of all Contract Documents,including but not limited to provided by a single manufacturer. <br /> all drawings and specifications,to ascertain requirements of the Work.Where there is a conflict in or between the POST OFFICE BOX 12916 <br /> drawings,specifications,or other related Contract Documents as to performance,the more stringent requirement shall 2. Penetration firestopping systems are UL listed assemblies,rated per ASTM E814 or UL 1479,based on testing at a END OF DIVISION 22 SHEET SPECIFICATION <br /> g P 9 <br /> apply,or as to quality,the highest quality provision shall apply and be included,each without Cost or schedule impact. positive pressure differential of 0.01 inch w.g. OAKLAND,CA 94604 <br /> E. Before submitting a bid and prior to the start of work,examine all conditions relating to the Work,including that a. F-Rating:At least one hour,but not less than the fire-resistance rating of construction penetrated. DMSION 21 <br /> associated with the work of other trades upon which this work may rely or otherwise depend,to achieve the Design b. T-Rating:At least one hour,but not less than the fire-resistance rating of construction penetrated. <br /> Intent,in accordance with the best trade practices,workmanship,and highest quality product installation,taking into 3. Penetrations in Smoke Barriers:Penetration firestopping systems are UL listed assemblies,rated per ILL 1479, FIRE PROTECTION SCOPE OF WORK: <br /> account the sequence of the work,delivery,storage,and hoisting requirements,requirements for access,testing, based on testing at a positive pressure differential of 0.3 inch w.g. <br /> temporary services,and all other site limitations and project complexities.Report to the Architect/Engineer any A. All areas of the building within the scope of work shall be provided throughout with a complete automatic fire <br /> conditions which might prevent installation of materials and/or equipment in the manner intended by the Contract a. L-Rating:Not exceeding 5.0 cfm/sq ft of penetration opening and no more than 50 cfm cumulative total for any suppression system.The system shall be suppled from the existing service if possible.All tamper and flow switches <br /> Documents or contrary to applicable codes,standards,or regulations. 100 sq it at both ambient and elevated temperatures. shall be furnished and installed by the fire protection contractor shall conform to all NFPA and local codes. <br /> F. Notify the Architect/Engineer before submitting a proposal of any aspect of the Contract Documents which may be 4. Install in accordance with manufacturer's instructions to comply with the conditions of the UL listing. SPRINKLER DESIGN CRITERIA: <br /> incomplete,incorrect,or indefinite,or which appears to conflict with existing conditions or the Design Intent.No 5. Identify each penetration firestopping system with legible metal or plastic label.Attach label permanently to <br /> consideration or allowance will be granted for any misunderstanding of materials,equipment,components to be surfaces adjacent to and within 6 inches of the firestopping system edge so that labels are visible to anyone A. All areas of the building in the scope of work shall be sprinklered. , <br /> furnished,or work to be done to accomplish the Design Intent. seeking to modify the penetrating item or firestopping system.Use mechanical fasteners or permanent adhesive. B. All fire protection work shall meet the requirements of the local Fire Marshal and the Owners insurance underwriter. <br /> G. As-Built Drawings:Maintain a set of contract documents on-site at all times for marking as-built conditions.Mark all Include the following information: <br /> 9 9 C. Hydraulically calculated system:Automatic sprinklers throughout the entire building shall be installed as hydraulically <br /> deviations from the design drawings on this set.Note the location and elevation of both new and existing ducts,piping, a. The words"Warning-Penetration Firestopping-Do Not Disturb.Notify facility management of any damage." calculated to comply with NFPA. <br /> and equipment.At conclusion of the project,transfer sketches and notes to a clean set of drawings,accurately <br /> indicating as-built conditions.Use color markings to distinguish from the original.Prior to submitting final pay request, b. Contractor's name,address,and phone number. D. Coordinate all fire protection work with existing reflected ceiling plans,HVAC ductwork,diffuser locations,and lighting <br /> submit full-color scan,minimum 400 dpi,in pdf format,to engineer for approval. c. UL listing designation. locations. <br /> H. Tender of a proposal is an explicit agreement to the terms and conditions of the Contract Documents. d. Date of installation. E. The sprinkler trade shall coordinate sprinkler head and piping layout with existing lighting,diffuser,and duct locations. <br /> Contractor to adjust sprinkler locations per existing lighting,diffuser,and duct locations. Hellmuth,Obata&Kassabaum,Inc. <br /> I. Definitions:Terms used on the drawings or in the specifications have the following meanings: T. Support for Piping and Equipment: <br /> F. All fire department valves,fire department inlet connections,etc.shall be provided with local Fire Marshal. 1218 Third Avenue,Suite 1315 <br /> 1. Furnish:Supply and deliver,ready for installation,assembly or intended use,all materials,labor,equipment,tests, 1. General: Seattle,WA 98101 USA <br /> testingapparatus,controls,accessories,and all other items required for theproper and com complete application. G. All sprinkler piping shall be maintained a minimum 16 inches above finished ceilings where possible. t 1 206 493 1771 f 1 206 493 1778 <br /> PP q P PP + + <br /> a. Provide a system of supporting devices and hangers for support and bracing of piping,conduit,and equipment H. Sprinkler heads shall have a 1/2 inch nominal orifice and a temperature ratio of 165 de F.Sprinkler heads located <br /> 2. Install:Includes unloading,unpacking,assembling,hoisting,erecting,installation,applying,finishing,protecting, as required by code and as required to install a complete,operating system. p p B 9' p <br /> cleaning,and similar operations at the project site as necessary to complete all items of work as required for the near heat producing equipment or in areas subject to high temperatures shall have a temperature rating of 212 deg.F. An reprpd-i-&intellc.-I prpperor right.reserved <br /> intended use/operation including all testing,certification,commissioning,and other requirements for final turnover b. Anchor floor-mounted equipment. 2020 <br /> I. All sprinkler heads shall be quick response type. <br /> to the Owner. c. Do not support ductwork,piping,conduits,conductors,orequipment from other piping,conduits,ceiling rids, in Association cairn <br /> PP p t g 9 9 J. Sprinkler heads located in no ceiling areas shall be rough brass,standard upright or pendent heads as required by <br /> 3. Provide:"Furnish"and"Install:' equipment,ductwork,or ceiling supports.In all cases,provide independent supports for such components and construction. <br /> equipment Mortensen <br /> 4. Owner Furnished,Contractor Installed:The Owner will furnish at his cost and the Contractor shall receive,protect, K. Sprinkler heads located in acoustical tile ceilings areas shall be chrome plated,recessed pendent heads. General contractor <br /> store and install in the performance of the Work. 2. Metal Supports and Anchorages:Refer to local codes,practices and standards for installation and material 10230 NE Points Drive,Suite 300 <br /> requirements and limitations relating to the use of metal supports and anchorages,including applicable seismic L. Sprinkler heads located in drywall or plaster ceiling areas shall be concealed ceiling sprinklers including cover plate. Kirkland,WA 98033 <br /> 5. Finished Spaces:Spaces other than mechanical or electrical equipment rooms,furred spaces,pipe and duct shafts, requirements.Use structural steel shapes,metal framing systems,and pipe and equipment support systems.Field <br /> unheated spaces immediately below roof,spaces above ceilings,unexcavated spaces,crawlspaces,and tunnels. M. The contractor shall test the entire system in accordance with NFPA regulations,AW WA regulations,state regulations, <br /> Welding:Comply with AWS D1.1. and local code regulations. Mazzetti <br /> 6. Exposed,Exterior Installations:Exposed to view outdoors or subject to outdoor ambient temperatures and weather 3. Grouting:Mix and place grout for equipment base bearing surfaces,pump and other equipment base plates,and MEP+FP Englneedng <br /> conditions.Examples include rooftop,yard,or building exterior locations. N. The contractor shall make all arrangements for a final inspection and approval by the underwriter and Fire Marshal. <br /> anchors.Comply with grout manufacturer's recommendations for mixing,placement,and curing. Appointments must be made in advance.Test reports shall be furnished to the Owner. 2013 4th Avenue,Suite 200 <br /> 7. Concealed,Interior Installations:Concealed from view and protected from physical contact by building occupants. 4, Suspension Support for Ducts,Pipes,Equipment: Seattle,WA 98121 <br /> Examples include installations above ceilings,in shafts,trenches,partitions,or other enclosures. END OF DIVISION 21 SHEET SPECIFICATION <br /> 8. Concealed,Exterior Installations:Concealed from view and protected from weather Conditions and physical contact a. Connect suspension supports directly to building steel.Do not support from other pipes,ducts,or equipment. <br /> Where hangers are required between building steel points,add supplementary steel members as required to <br /> by building occupants but subject to outdoor ambient temperatures.Examples include installations embedded in or adequately support the load. <br /> below masonry or concrete construction,earthwork/trenches,within unheated shelters,crawl spaces,or <br /> enclosures. b. Furnish and install all necessary hangers,inserts,supports,supplementary steel,etc.,to properly support all <br /> equipment,ductwork and piping in an approved manner and in full accordance with the manufacturer's <br /> 9. Wiring:All wires,raceways,fittings,conductors,connectors,tape,junction and outlet boxes,connectors,splices, recommendations. <br /> and all other items necessary and/or required in connection with such work. C. <br /> For support of pipes with operating weight of 50 pounds per foot,consult with structural engineer for delegated <br /> 10.Raceway:All raceways,conduit,fittings,hangers,supports,sleeves,etc. engineering design. <br /> 11.Piping:Pipe,tube,fittings,valves,hangers,and other accessories which Comprise a system. U. Cutting,Patching,and Demolition: <br /> J. Codes and Standards: 1. Remove piping and ductwork indicated on the plans to be removed.Terminate at mains.Cap water-or air-tight. <br /> 1. Comply with the requirements of all codes and standards adopted by authorities having jurisdiction. 2. Present to owner a list of equipment to be removed.At owner's direction,remove to a designated location any Key Plan <br /> equipment that the owner chooses to retain.Remove all other equipment from the site and dispose of according to <br /> 2. The codes and standards referred to are minimum standards.Where the requirements of Contract Documents local regulations. <br /> exceed those of the codes and standards,comply with the Contract Documents. 3. Remove unused power and control wiring and pneumatic tubing. <br /> K. Indoor Environmental Quality: 4. Repair damaged insulation.Match existing materials and installation methods or match specifications for new work. <br /> 1. Use materials that qualify as inherently non-emitting. Do not use any asbestos-containing material. <br /> 2. Submittals for all materials that are not inherently non-emitting shall state compliance with the above,equivalent 5. Patch ductwork and piping using specifications for new work. <br /> to compliance with LEED v4 credit for Low-Emitting Materials,whether or not this project is applying for LEED certification. 6. Temporary disconnection:Remove,store,clean,reinstall,reconnect,and make operational any equipment <br /> indicated for relocation. <br /> L. Dimensions: 7. Protect existing building components,materials,and finishes that are indicated to remain.Where building materials <br /> 1. Except where dimensions are shown,the drawings are diagrammatic and shall not be scaled.Exact location of must be cut,removed,or damaged,restore to existing condition or comply with specifications for new work. <br /> fixtures,apparatus,duct work and piping shall be determined by dimensions on the site and from architectural Coordinate with other trades. <br /> drawings. 8. Where masonry must be penetrated,cut with saws or core drill. <br /> 2. The Architect/Engineer specifically reserves the right,up to the time of roughing-in,to exactly define the position <br /> of the equipment to be installed and connected to arrangement of these connections. PIPE INSULATION: <br /> 3. The drawings indicate the general locations of apparatus,fixtures,and piping.Where job conditions require A. General: Professional seals <br /> reasonable changes to indicated locations and arrangement,make such changes where approved by the Engineer and without additional cost to the owner. 1. Insulation shall be installed by a qualified insulation contractor,in accordance with best trade practices and guided W. <br /> Y. Sp <br /> by manufacturer's printed installation directions. OF wAs <br /> M. Clearance and Access: 2. All insulation,jackets or facings,and adhesives used to adhere jacket or facing to the insulation,including fittings <br /> 1. Equipment requiring operation,service or maintenance during the life of the system shall be made easily and butt strips,shall be rated and labeled in accordance with ASTM E-84 for Flame Spread not exceeding 25 and Fe o <br /> accessible.Comply with manufacturer's published service access requirements. Smoke Developed not exceeding 50. to z <br /> 2. Ductwork or piping shall not be run within 42 inches of electrical switchboards,panel boards,motor control B. Pipe Insulation: 24672 fk <br /> centers,or the electrical panels integral to equipment. <br /> 1. Preformed Mineral-Fiber: <br /> 3. Provide access panels in ceilings and walls for required service access to life safety dampers,actuators,equipment, !O0 <br /> balancing devices,shutoff valves,and other items that require service and/or inspection.Location and type of a. Preformed mineral-fiber molded pipe and elbow insulation manufactured to meet ASTM C 585. NAL <br /> access panels must be coordinated with and approved by the Architect. b. Factory applied paper-free all service vapor retarding outer jacket and adhesive closure system. <br /> N. Protection of Work During Construction: c. Cover fittings and elbows with standard PVC fitting covers. No. Desoriptlon Data <br /> 1. Protective covers,skids,plugs,caps,and coatings shall be provided to protect equipment and materials from C. Piping: MOB BACK FILL ISSUED FOR PERMIT 2022/10/14 <br /> damage during construction. 1. Cold Water Piping:Preformed Mineral-Fiber. <br /> 2. All equipment and material shall be stored under watertight cover and off the ground. a. Pipe,1/2 inch to 1-1/4 inch: 1/2 inch. <br /> 3. Seal open ends of pipes and ducts while in fabrication,transport,and storage.Maintain sealed ends during b. Pipe,1-1/2 inch and above: I inch. <br /> installation until final connections are made. <br /> 4. Failure to maintain ductwork in a clean condition during fabrication,transport,storage,and installation will require 2. Hot Water and Hot Water Return Piping:Preformed Mineral-Fiber. <br /> duct cleaning after installation,at no additional cost to the owner. a. Pipe,1/2 inch to 1-1/4 inch: 1 inch. <br /> 5. Damage and Touchup:Repair marred and damaged factory-painted finishes with materials and procedures to b. Pipe,1-1/2 inch and above: 1-1/2 inch. <br /> match original factory finish. PIPING AND SPECIALTIES: <br /> 0. Action Submittals: <br /> A. General: <br /> 1. Submit all required documents in Portable Document Format(pdf).Include cover sheet with project name,date, <br /> name of submitting contractor,specific product being submitted,specification reference and identification tag used 1. All welding in accordance with the national certified pipe welding bureau or other approved procedure conforming <br /> on the plans,where applicable.Clearly state that the product complies with the contract documents and note any to the requirements of ASME Boiler and Pressure Vessel Cade&ANSI 31.1.All welders shall be certified. <br /> deviations from the contract documents. 2. Provide brass dielectric fitting at dissimilar metals. <br /> 2. Where product sheets with multiple options are submitted,clearly indicate the specific item being submitted. 3. Provide 20 gauge galvanized pipe sleeve at all interior wall penetrations.Maintain fire resistance rating of wall. <br /> 3. Product Data:For each type of product indicated.Include rated capacities,operating characteristics,and furnished 4. Support and anchor all piping.Size hangers on Cold pipe to clear insulation and provide 12 inch long galvanized <br /> specialties and accessories.Include factory selections. steel shield between hanger&insulation jacket.Support piping at floor penetrations with riser clamp.Allow for <br /> 4. Shop Drawings:Include plans,elevations,sections,details,and attachments to other work.Detail equipment thermal expansion. <br /> assemblies and indicate dimensions,weights,loads,required clearances,method of field assembly,components, 5. Provide isolation valves,circuit isolation valves,balancing valves,unions,reducers,strainers,etc as required for <br /> and location and size of each field connection.Include wiring diagrams for power,signal,and control wiring. functioning system. <br /> 5. Delegated-Design Submittal:For equipment hangers and supports indicated to comply with performance 6. Install chrome plated escutcheons for pipe penetrations of walls,ceilings,and finished floors. <br /> requirements and design criteria,including analysis data signed and sealed by the qualified professional engineer <br /> responsible for their preparation. B. Cold Water,Hot Water,and Hot Water Return Piping: <br /> a.Design Calculations: Calculate requirements for selecting vibration isolators and seismic restraints and for 1. Type L,ASTM B-88,hard drawn copper tube with ASTM B-75 wrought copper sweat fittings conforming to ANSI <br /> designing vibration isolation bases. B16.22. <br /> b.Detail mounting,securing,and flashing of roof curb to roof structure.Indicate coordinating requirements with 2. Solder shall be"lead-free"containing less than 0.2 percent lead content. <br /> roof membrane system. 3. Clean and disinfect domestic water pipe as follows: <br /> c. Wind-and Seismic-Restraint Details:Detail fabrication and attachment of wind and seismic restraints and a. Purge new piping and parts of existing piping that have been altered,extended,or repaired before using. <br /> snubbers.Show anchorage details and indicate quantity,diameter,and depth of penetration of anchors. <br /> b. Use purging and disinfecting procedures prescribed by authorities having jurisdiction;if procedures are not <br /> 6. Closeout Submittals: prescribed,use procedures described in either AW WA C651 or AW WA C652. <br /> a. As-built drawings:Maintain accurate records on a set of contract drawings of all deviations made during the C. Soil,Waste,Vent,and Storm Piping: <br /> progress of the work.The completed set of drawings,with the nature and extent of all deviations clearly <br /> shown,shall be submitted to the engineer upon completion and acceptance of the work.As-built drawings shall 1. Cast iron soil pipe and fittings,ASTM A74 and/or CISPI 301,service weight,shall be used for piping withing the KIP Pmiect No: 20.0 003. <br /> building. She Project No: 20.05003.00 <br /> be forwarded to the engineer for approval in pdf format. 9� <br /> 2. Piping shall be lain end no-hub with lain end fittings. sneer Tine: <br /> b. Operation and Maintenance Data:For all equipment,to include in emergency,operation,and maintenance P 9 P ( ) P <br /> manuals. 3. Joints for no-hub cast iron soil pipe and fittings shall consist of a neoprene gasket conforming to ASTM C-564 and PLUMBING <br /> c. Operating instructions:Conduct formal instruction sessions for the owner's operating personnel to cover the stainless-steel clamps. <br /> following.Submit written statement from the owner's representative acknowledging satisfactory Completion of SPECIFICATIONS <br /> instruction: 4. Where no-hub is used,anchors shall be provided at the water closets to prevent pipe from twisting. <br /> a 1) General familiarization and operating procedures for the entire mechanical installation. 5. Pipe and fittings below floor shall be modified hub cast iron. <br /> 2) Routine maintenance procedures for all mechanical equipment. 6. Maintain code approved air gaps at condensate discharge into the sanitary waste system.Insulate sanitary P-traps <br /> 3 Operating and routine maintenance procedures for the Building Automation System. when used for condensate discharge. <br /> fit 9 P 9 Y origi-I 1e 30 x 42 D os&was ding. <br /> D. Valves:ry P. Cleaning: Sheet Number <br /> a 1. Water valves for use in copper lines shall be rated 175 PSIG WOG,brass body,ball type. B 1 P 8 0 1 <br /> 1. Remove all stickers,rust,stains,temporary labels,and temporary covers. <br /> 2. Provide isolation valves on all branch lines. <br /> E. Installation: <br />