Laserfiche WebLink
• <br /> KAER <br /> PER ANENTE <br /> (E)AC-1 <br /> Project <br /> ROOF Kaiser Permanente Everett <br /> — — — — — — — — — — — — — — — — MOB Backfill <br /> 75KVA 2929 PINE STREET <br /> EVERETT,WA 98201 <br /> Prepared for <br /> — — —T,_ — — — — — — T6— — — D — KAISER FOUNDATION <br /> 75KVA 45KVA SCOPE OF WORK HEALTH PLAN, INC. <br /> •iln NATIONAL FACILITIES SERVICES <br /> D D I POST OFFICE BOX 12916 <br /> PNL PNL PNL PNL PNL PNL PNL PNL OAKLAND,CA 94604 <br /> SEC SEC. S C.1 SEC. 225 150 SECA SEC.2 <br /> 40 22 225 2 225 <br /> GROI INnING <br /> TERMINAL <br /> L2 <br /> S <br /> GROUNDING 150KVA , <br /> TERMINAL __T <br /> l <br /> D <br /> T3 T6 <br /> 150KVA SCOPE OF WORK 45KVA <br /> Hellmuth,Obata&Kassabaum,Inc. <br /> 1218 Third Avenue,Suite 1315 <br /> Seattle,WA 98101 USA <br /> PNL D PNL PNL PNL D PNL PNL PNL t+1 206 493 1771 f+1 206 493 1778 <br /> 1HA 1LA 1LA 1EH 1EL 1LB 1LB <br /> 800 SECA I SEC. 225 MCB SEC.1 SEC.2 All reptpaupt h&imellectual p P.,ty rights 1.— <br /> L 400 2 225 400 2020 <br /> In Assoclatlon with <br /> Mortensen <br /> _ L, General Contractor <br /> 10230 NE Points Drive,Suite 300 <br /> Kirkland,WA 98033 <br /> Mazzetti <br /> GENERATOR <br /> MEP+FP Englneeiing <br /> 250KW 2013 4[h Avenue,Suite 200 <br /> 480/277V,30,4W Seattle,WA 98121 <br /> P4 <br /> P3 <br /> 1"C. (6)4"C.4#500KCM IL&1#250KCMIL G <br /> TRANSFORMER (6)4"C. NEW <br /> VAULT 4#50OKCMI ELEC <br /> ROOM <br /> Key Plan <br /> 1/2"C.2#12 <br /> (6) <br /> 4#SOOKCMI <br /> 1/2"C.3#12& 2000A <br /> 1#12G 3P <br /> M LSIG <br /> O <br /> PNL <br /> UTILITY UT KENWTLITY GROUND <br /> METER 20A ORMER BUS TVSSNBASE TYPE) <br /> CONCRETE G <br /> ENCASEMENT _ <br /> MAIN SERVICE <br /> 4#4/OG SWITCHBOARD 1#4/UG 1"C Professional Seals <br /> (4) <br /> 480Y/277V,30,4W,35KAIC 3/4"X10'-O" 1#4/(G. <br /> GROUND ��COPPER <br /> (2)4"C.TO RODS = CLAD STEEL �G C. Shy <br /> 4 DF WAS <br /> UTILITY GROROD Pi <br /> P1 0 <br /> POLE <br /> 2 <br /> .pt� 40g49 �V� <br /> POC{tgeQ)STER�'G4Z4v <br /> 20/2 J'VONAL <br /> ELEV. <br /> T1 2012 CAB No. Description Date <br /> 75KVA T2 ELEV. LIGHTS <br /> 45KVA CAB MOB BACK FILL ISSUED FOR PERMIT 2022/10/14 <br /> LIGHTS <br /> 2000P l 603P Q\ P' <br /> 603P Q\ 800P Q\ 4O3P Q\ 600SIP,\ 4O3P Q\ PPNL HA PL1A IFPEH D PEL PHB <br /> �/ I/ I/ I/ / / I/ 225 MCB MCB MCB MCB <br /> • • • • • 225 600 150 400 100/3CF <br /> 13 100. <br /> (E) _J #1 EV2EV #3 EV <br /> ATS <br /> MAIN SWITCHBOARD,'MSB-1 PNL 600A <br /> 2000A,480/277V,30,4W,65K AIC GROUND PLB SCOPE OF WORK <br /> BUS MCB <br /> TO UFER� BAR 100 <br /> GROUND/GROUND = �TO COLD <br /> RODS WATER <br /> PIPE <br /> TO <br /> BUILDING STEEL BASEMENT <br /> EXISTING ONE LINE DIAGRAM <br /> Bi E601 12'-1'0" <br /> KIP Project N. CAP022248 <br /> HOK Project No: 20.05003.00 <br /> Sheet Title: <br /> PARTIAL ONE-LINE <br /> DIAGRAM <br /> a <br /> on9ioai ie r2 <br /> Sheet Number <br /> a <br /> B 1 E601 <br />