My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 1/6/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 1/6/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 8:40:12 AM
Creation date
1/8/2025 8:39:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
1/6/2025
Council Approval Date
11/6/2024
End Date
6/30/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility Construction Project
Tracking Number
0004639
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />3rd Ave Water Quality Project Division C - CONTRACT Work Order # UP3775 <br /> 1 <br /> CITY OF EVERETT, WASHINGTON CONTRACT <br />THIS CONTRACT is made and entered into by and between the City of Everett, Washington, a municipal <br />corporation existing under the laws of the State of Washington (the “City”) and Blue Mountain <br />Construction Group, LLC (“Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to furnish <br />all labor, tools, materials, equipment, and supplies required to complete in a workmanlike manner the <br />work, improvements, and appurtenances in accordance with the Specifications and Plans and all other <br />Contract Documents entitled: “3RD AVE WATER QUALITY FACILITY” (the “Project”). <br />1. Contract Documents. This Contract is the written agreement signed between the City and Contractor <br />and includes Division C – CONTRACT, Division P - PROPOSAL, Division B – BID ITEM DESCRIPTIONS, Special <br />Provisions, Contract Plans, Standard Specifications, Standard Plans in effect as of the date Bids are opened, <br />Addenda, supplemental agreements, change orders, certifications and affidavits required by this Contract <br />and by law, and Federal requirements that apply to this Contract and Project, all of which are referred to <br />as the “Contract Documents” and all of which are hereby incorporated by reference. A copy of the <br />Contract Documents that were posted for the Project on Builder’s Exchange of Washington <br />(www.bxwa.com) as of Bid Opening Date is maintained by the City Clerk’s Office as a single pdf and is <br />available as follows: <br />Link to PDF https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=1786376&searchid=c709f603- <br />8cc7-4bc7-bff7-cc5456889cf3&dbid=0 <br /> <br />This is a 422-page pdf digitally signed by City of Everett 2024.11.18 15:15:49-08’00’ <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to signing this <br />Contract. City and Contractor agree that this pdf contains all posted Contract Documents as of the Bid <br />Opening Date. City and Contractor further agree that this pdf may contain some other documents (such <br />as Reference Information) that are not Contract Documents. <br />2. Contract Time. Substantial completion shall be achieved within sixty ( 60 ) working days after the <br />effective date of the Notice to Proceed. Physical completion shall be within twenty ( 20 ) working days <br />after the actual date of issuance of substantial completion. <br />3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional expense <br />in the event that the Contractor does not complete the work in all respects and have it ready for use by <br />the substantial completion date stated. Because it is difficult to accurately compute the amount of such <br />costs and damages, the Contractor hereby covenants and agrees to pay to the City liquidated damages as <br />computed in Section 1-08.9 of the Standard Specifications, as may be amended by the Special Provisions, <br />for each and every working day required to accomplish substantial completion of the work in excess of <br />the period established above for substantial completion. For overruns in contract time occurring after the <br />physical completion date, liquidated damages shall be assessed at the rate computed in Section 1-08.9 of <br />the Standard Specifications, as may be amended by the Special Provisions, until the work is physically <br />complete.
The URL can be used to link to this page
Your browser does not support the video tag.