My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
US Dept of Housing and Urban Development (HUD) 1/7/2025
>
Contracts
>
6 Years Then Destroy
>
2025
>
US Dept of Housing and Urban Development (HUD) 1/7/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 9:13:49 AM
Creation date
1/8/2025 9:13:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
US Dept of Housing and Urban Development (HUD)
Approval Date
1/7/2025
Council Approval Date
2/14/2024
End Date
6/30/2025
Department
Community Development
Department Project Manager
Kembra Landry
Subject / Project Title
2024 HUD CDBG Agreement
Tracking Number
0004648
Total Compensation
$781,738.00
Contract Type
Agreement
Contract Subtype
CDBG Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
8. Additional Conditions. <br />(a)The period of performance and single budget period for the funding assistance <br />date specified in item 4 and shall each end on September 1, 2031. The Grantee <br />shall not incur any obligations to be paid with such assistance after September 1, <br />2031. <br />(b)The Grantee must complete Addendum #1 Grantee Indirect Cost <br />from the Grantee will be incorporated into and made part of this Agreement, <br />provided that the rate information is consistent with the applicable requirements <br />under 2 CFR part 200. The Grantee must immediately notify HUD upon any <br />change in the Grantee so that HUD can amend the Agreement <br />to reflect the change if necessary. <br />(c)In addition to the conditions contained on form HUD 7082, the grantee shall <br />comply with requirements established by the Office of Management and Budget <br />(OMB) concerning the Dun and Bradstreet Data Universal Numbering System <br />(DUNS); the System for Award Management (SAM.gov.); the Federal Funding <br />Accountability and Transparency Act as provided in 2 CFR part 25, Universal <br />Identifier and General Contractor Registration; and 2 CFR part 170, Reporting <br />Subaward and Executive Compensation Information. <br />(d)The grantee shall ensure that no CDBG funds are used to support any Federal, <br />State, or local projects that seek to use the power of eminent domain, unless <br />eminent domain is employed only for a public use. For the purposes of this <br />requirement, public use shall not be construed to include economic development <br />that primarily benefits private entities. Any use of funds for mass transit, <br />railroad, airport, seaport or highway projects as well as utility projects which <br />benefit or serve the general public (including energy-related, communication- <br />related, water- related and wastewater-related infrastructure), other structures <br />designated for use by the general public or which have other common-carrier or <br />public-utility functions that serve the general public and are subject to regulation <br />and oversight by the government, and projects for the removal of an immediate <br />threat to public health and safety or brownfield as defined in the Small Business <br />Liability Relief and Brownfields Revitalization Act (Public Law 107 118) shall <br />be considered a public use for purposes of eminent domain. <br />(e)The Grantee or unit of general local government that directly or indirectly <br />receives CDBG funds may not sell, trade, or otherwise transfer all or any such <br />portion of such funds to another such entity in exchange for any other funds, <br />credits or non-Federal considerations, but must use such funds for activities <br />eligible under title I of the Act. <br />(f)E.O. 12372-Special Contract Condition - Notwithstanding any other provision of <br />this agreement, no funds provided under this agreement may be obligated or <br />expended for the planning or construction of water or sewer facilities until receipt
The URL can be used to link to this page
Your browser does not support the video tag.