Laserfiche WebLink
<br />2. Commercial/Industrial/Government Water Rates and Charges <br /> <br />Commercial/Industrial/Government <br />Monthly Water Rates and Charges 2025 2026 2027 <br />2028 and thereafter <br />until superseded by a <br />new rate ordinance <br />1/2-3/4" Meter Size <br />Base Water Charge $32.57 $34.20 $35.57 $36.99 <br />Charge Added to Base Water Charge <br />per CCF of Metered Water Consumption in <br />Excess of 6 CCF <br />In accordance with the rate table below <br />Base Filtration Charge $6.07 $6.56 $6.76 $6.96 <br />Charge Added to Base Filtration <br />Charge per CCF of Metered Water <br />Consumption in Excess of 6 CCF <br />$1.012 $1.093 $1.126 $1.160 <br />1" Meter Size <br />Base Water Charge $54.29 $57.00 $59.28 $61.65 <br />Charge Added to Base Water Charge <br />per CCF of Metered Water Consumption in <br />Excess of 10 CCF <br />In accordance with rate table below <br />Base Filtration Charge $10.12 $10.93 $11.26 $11.60 <br />Charge Added to Base Filtration <br />Charge per CCF of Metered Water <br />Consumption in Excess of 10 CCF <br />$1.012 $1.093 $1.126 $1.160 <br />2" Meter Size <br />Base Water Charge $65.15 $68.40 $71.14 $73.98 <br />Charge Added to Base Water Charge <br />per CCF of Metered Water Consumption in <br />Excess of 12 CCF <br />In accordance with rate table below <br />Base Filtration Charge $12.14 $13.12 $13.51 $13.92 <br />Charge Added to Base Filtration <br />Charge per CCF of Metered Water <br />Consumption in Excess of 12 CCF <br />$1.012 $1.093 $1.126 $1.160 <br />Over 2" Meter Size <br />Base Water Charge $86.86 $91.20 $94.85 $98.64 <br />Charge Added to Base Water Charge <br />per CCF of Metered Water Consumption in <br />Excess of 16 CCF <br />In accordance with rate table below <br />Base Filtration Charge $16.19 $17.49 $18.02 $18.56 <br />Charge Added to Base Filtration <br />Charge per CCF of Metered Water <br />Consumption in Excess of 16 CCF <br />$1.012 $1.093 $1.126 $1.160 <br />