My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4065-25
>
Ordinances
>
Ordinance 4065-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 9:08:39 AM
Creation date
1/9/2025 9:08:13 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4065-25
Date
1/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />b. The consumption charges for master meters shall be as follows: <br /> <br />i. Master meters connected East of the Snohomish River: <br /> <br />Master Meters East of Snohomish River 2025 2026 2027 <br />2028 and thereafter <br />until superseded by a <br />new rate ordinance <br />Meter Charge (per meter/month) $539.84 $566.83 $589.50 $613.08 <br />Water Charge (per CCF) $0.780 $0.820 $0.850 $0.880 <br />Added Filtration Charge (per CCF) $1.012 $1.093 $1.126 $1.160 <br /> <br />A twenty-five percent rate multiplier shall be applied to the water charge in the table above. Also, a filtration <br />charge as stated in the table above shall be added, to arrive at the total monthly charge. No multiplier shall be <br />applied to the filtration charge. <br /> <br />ii. Master meters connected West of the Snohomish River: <br /> <br />For master meters connected west of the Snohomish River, the water rates and charges shall be the same as the <br />Commercial/Industrial/Governmental water rates and charges. A twenty-five percent rate multiplier shall be <br />applied to water charges. Also, a filtration charge as stated in the table below shall be added, to arrive at the <br />total monthly charge. No multiplier shall be applied to the filtration charge. <br /> <br />Filtration Charge for Master Meters West <br />of Snohomish River 2025 2026 2027 <br />2028 and thereafter <br />until superseded by a <br />new rate ordinance <br />Added Filtration Charge (per CCF) $1.012 $1.093 $1.126 $1.160 <br /> <br /> <br />3. Service Connection Charges <br /> <br />Service connection installations outside the City limits of all sizes shall be charged at the actual cost of the <br />complete installation, but in no event shall the charge for a three-quarter inch, a one-inch or a two-inch service <br />be less than the amount charged for service connections within the City limits. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.