Laserfiche WebLink
• <br /> Project name: WATERLINE GYM <br /> Permit#: B2306-070 <br /> 112 Date: 10th October 2023 <br /> Egress: <br /> Everett(Cal Bearman): <br /> 3. Egress routes are ..... <br /> [2812 response] The egress routes and occupancy calculations have been addressed. <br /> See drawing A1.1. <br /> Accessibility: <br /> Everett(Cal Bearman): <br /> 4. It appears that the ..... <br /> [2812 response] The new access tenant door ,101 B, to the tenant space has been moved <br /> to accommodate the requirements for the ramp 5'x5' landing. It has also been adjusted to <br /> Open into the corridor as the occupant load is greater than 50. <br /> Everett (Cal Bearman): <br /> 5. It appears that the 3'-6" <br /> [2812 response] floor plan drawing with the 3'-6" step between the fitness and bouldering <br /> areas has been modified with a future 42" high guard rail all around. <br /> Miscellaneous: <br /> Everett(Cal Bearman): <br /> 6. It appears that the mezzanine ..... <br /> [2812 response] The mezzanine meets the standards to be walled as per 505.2.3-1 under <br /> exceptions, and the occupant load is less than 10. See occupant drawing A1.1. <br /> Everett(Cal Bearman): <br /> 7. On sheet A2 the section <br /> [2812 response] See drawing A2 detail 2. The clear head heights for the mezzanine have <br /> been addressed. <br /> 2812 Colby Avenue Everett WA 98201 <br /> P(425)252-2153 www.2812architecture.com <br /> '2-S3 <br />