My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2900 GRAND AVE WATERLINE GYM 2025-01-10
>
Address Records
>
GRAND AVE
>
2900
>
WATERLINE GYM
>
2900 GRAND AVE WATERLINE GYM 2025-01-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 11:18:32 AM
Creation date
1/10/2025 10:33:41 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2900
Tenant Name
WATERLINE GYM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUANTUM I CONSULTING ENGINEERS <br /> April 2, 2024 <br /> Benjamin Monk <br /> City of Everett Public Works Department <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Subject: B2402-031—Job Address 900 Grand Ave, Everett, WA 98201 <br /> Quantum Project#22105.02 <br /> Dear Benjamin Monk: <br /> We have received the correction notice on the above-referenced project dated 3/18/2024. Below are our <br /> responses to the structural comments and referenced supplemental structural calculations. <br /> STRUCTURAL <br /> 1. Please provide verification that the new gravity loading will not trigger a Tier II alteration to the <br /> existing structural elements carrying gravity loads and lateral loads per Section 503.3 and Section <br /> 503.4 of the 2018 IEBC. <br /> The existing retail area is designed for 100 psf Live Load. The attached calculation page 1 shows <br /> our total climbing wall Dead+Live Loads does not exceed 100 psf. The attached calculation page <br /> 1 shows that added dead load for the climbing wall is less than a 0.5%increase to the total dead <br /> load for the entire slab of the building therefore no Tier II analysis is required. <br /> 2. It appears that in Detail 6/CW3.1 a horizontal concentrated force will be applied to an existing <br /> W12x I-Beam normal to its web. Please consider the following matters of steel construction from <br /> the AISC Steel Construction Manual and any others applicable, but not mentioned below: <br /> a. Application of concentrated forces to webs of wide-flange sections per Section J10 and <br /> Section 010. <br /> AISC Section J10 only applies to concentrated forces applied perpendicular to the beam flange. <br /> For the horizontal load applied to the beam web,see attached calculation page 2 checking a flat <br /> plate bent in weak axis per section F11. <br /> b. Fillet weld limitations for web to flange connections as discussed in Section J2.2 and Table <br /> J2.4 and Figure 8-11. <br /> See attached calculation page 2 for weld check. <br /> QUANTUM CONSULTING ENGINEERS-1511 THIRD AVENUE SUITE 323-SEATTLE WASHINGTON 981011 T 206.957.3900 <br /> www.quantumce.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.