My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2900 GRAND AVE WATERLINE GYM 2025-01-10
>
Address Records
>
GRAND AVE
>
2900
>
WATERLINE GYM
>
2900 GRAND AVE WATERLINE GYM 2025-01-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 11:18:32 AM
Creation date
1/10/2025 10:33:41 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2900
Tenant Name
WATERLINE GYM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTTO ROSENAU & ASSOCIATES, INC. <br /> Geotechnical Engineering, Construction Inspection & Materials Testing <br /> CONSTRUCTION INSPECTION REPORT <br /> Report Number: SW468348 <br /> Project Name: Waterline Gym Job Number: 24-0053 <br /> Project Address: 2900 Grand Avenue, Units 4, 5, Everett Permit: B2306-070 <br /> Client Name: CH Grand LLC <br /> E_ Inspections Performed <br /> Steel Decking ❑ Other(specify): <br /> Structural Steel Fabrication ❑ <br /> Structural Steel Erection ❑� <br /> Inspector: John Fraser(WABO#: SI 02055) Inspection Date: May 8, 2024 <br /> Remarks <br /> On site for ORA at contractor's request for structural steel deck welding inspection. Inspection covers the requirements <br /> for material identification and condition of structural members, and requirements set forth in engineer's specifications. <br /> Reference: Quantum Consulting Engineers job#23208.01, with RFI response from Engineer of Record (EOR) <br /> -Inspected 3/4" puddle welds of composite decking to structural steel framing at West Mezzanine per plan <br /> -inspected '/4" fillet welds weldable nelson studs to structural steel framing at West Mezzanine per plan <br /> The above welds pass per AWS D1.1 visual welding acceptance criteria <br /> WABO welder information verified and available in contractor record <br /> Welding procedures were not available on site <br /> Conforms <br /> / G� ��// Date: 2024.05.15 <br /> Copies to: �ccrc o <br /> ❑ Client ❑d Engineer ❑ Others 05:1 5:07 -07 00 <br /> Technical Responsibility: <br /> ❑ Owner ❑./ Contractor <br /> Isaac Ruoff, Project Manager <br /> ❑d Architect ❑d Building Dept <br /> This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau&Associates, Inc. Reproduction of this <br /> report except in full,without written permission from our firm is strictly prohibited. <br /> 6747 M.L. King Way S., Seattle,Washington 98118-Phone(206)725-4600-Fax(206)723-2221 <br /> Form No.:ADMIN-63-07(Rev 01124) Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.