My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2900 GRAND AVE WATERLINE GYM 2025-01-10
>
Address Records
>
GRAND AVE
>
2900
>
WATERLINE GYM
>
2900 GRAND AVE WATERLINE GYM 2025-01-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 11:18:32 AM
Creation date
1/10/2025 10:33:41 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2900
Tenant Name
WATERLINE GYM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Paul Douglas <br /> Plan Check Number: 132306-070, First Building Review Letter <br /> September 27, 2023 <br /> Architectural <br /> General: <br /> 1. It appears that the floor plan on sheet Al does not include the occupancy groups or occupant <br /> loads for the tenant improvement spaces in the area of work. IBC 302.1. <br /> Fire Protection: <br /> 2. The tenant improvement will cause the primary occupancy group in the area of work to be an <br /> assembly occupancy (A-3). The existing walls between the area of work and the adjoining <br /> building is not identified as a fire rated wall assembly. What are the occupancy groups of the <br /> adjoining spaces and does this trigger required separation of occupancies per IBC Table 508.4? <br /> Egress: <br /> 3. Egress routes are not clearly identified. Providing an egress plan with the occupant loads, exit <br /> access, exit, and exit discharge components with consideration for the adjoining spaces would <br /> provide clarification on the planned egress of the space. IBC 107.2.3 <br /> Accessibility: <br /> 4. It appears that the new tenant access door into the commercial tenant space below the <br /> mezzanine does not accommodate a landing at the top of the existing ramp as required per IBC <br /> 1012.6.3. <br /> 5. It appears that the 3'-6"step between the fitness area and the bouldering area has no guard. <br /> Considering it is more than 30 inches between the levels a guard is required per IBC 1015.2. <br /> Miscellaneous: <br /> 6. It appears that the mezzanine is to be walled off from the story below but per IBC 505.2.3 it <br /> must be open and unobstructed except for a wall not more than 42 inches in height. The <br /> exception that it does not have to be opened when the occupant load is not greater than 10 <br /> may apply. Occupant loads should be shown per the first comment. <br /> 7. On sheet A2 the section at the mezzanine in detail 2 should show the clear height above and <br /> below the mezzanine floor. IBC 505.2. <br /> Structural <br /> Lateral System: <br /> 1. It appears that the lateral load path at the new mezzanine framing may be the two columns <br /> that the framing attaches to and not the relatively flexible new shear walls. Please verify that <br /> the existing columns have the ability to carry lateral loading from the mezzanine. IBC 1604.4. <br /> 3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.