Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 8/30/2024 8/30/2024 BLDG 10-DRYWALL RAKEEB KHAN APPROVAL <br /> NAILING <br /> Notes: <br /> Was able to verify 5/8"type x at corridor. <br /> 8/30/2024 8/30/2024 BLDG 16-FINAL RAKEEB KHAN PARTIAL <br /> APPROVAL <br /> Notes: <br /> Contact Name:A FIVE CONSTRUCTION LLC <br /> Site Address:2900 GRAND AVE UNITS 4,5 <br /> Phone:9712353614 <br /> e-Mail:aaron@afiveconstruction.net <br /> Waiting on final special inspection report. <br /> 8/30/2024 8/30/2024 TEMP CERTIFICATE RAKEEB KHAN APPROVAL 30 day tco <br /> OF OCCUPANCY <br /> Notes: <br /> 30 day tco.Ok to open to public. <br /> 9/4/2024 9/4/2024 BLDG 16-FINAL RAKEEB KHAN APPRVD-PERMIT <br /> FINAL <br /> Notes: <br /> 9/4/2024 9/4/2024 SPECIAL RAKEEB KHAN ACCEPTED <br /> INSPECTION <br /> Notes: <br /> 9/5/2024 9/6/2024 CERTIFICATE OF CINDY BERGSMA APPROVAL <br /> OCCUPANCY <br /> Notes: <br /> I <br /> Printed: Friday,06 September, 2024 2 of 2 rk <br /> SUPERION <br />