Laserfiche WebLink
Invoice No. Description <br />Units Date <br />r <br />C0NCOD0613M CONCRETE MIX 60 I.B. BAG <br />18.00 061l <br />$118.59 <br />CEMENT. SAND AND ROCK <br />MIX <br />PIPE44304247 PIPE 6 PVC SEWER SDR-35 <br />28.00 061l <br />$175.00 <br />ASTM-D3034 <br />REDU44WG847 REDUCER 6 SPIGOT X 4 <br />1.00 061l <br />$31.87 <br />BELL PVC W/GASKET <br />ECCENTRIC <br />C0UP44300]4] COUPLING 6 Cl/PLASTIC X 4 <br />1.00 06N]2024 <br />$7.22 <br />CIIPLASTIC FERNCO 6.61 X <br />4.46 <br />Total Material Cost <br />$332.68 <br />Comments: <br />Ben'anin Jones -OMOBM24 <br />(Copied had Service Request ]196326):'CALLED <br />@CGrenzne@evs mH,wa.gov CELL VOICEMAIL NOT <br />SET UP. CALLED @glurm@eve dftsw v." <br />Grewiv Lunz - 04/08I2024 <br />(Copied from Service Request 7196326):'CASS <br />WORKS SRN0220573 <br />Called customer, will dig up clean out and check our <br />sida' <br />Grewiv Lunz - 04/08I2024 <br />(Copied from Service Request ]196326): <br />'@ogrenzner@evemfta.gov <br />Badcetl up at dean out. SIS aggregated and pints <br />have separation and misalignment. TV to verify and <br />contact customer with ifN at we plan to do. - <br />(Copied from Service Request ]196326):'New varier, <br />shows backwards 6-4 reducer bolding debris. Then <br />heavily aggregated concrete pipe to clay wah PVC <br />standpipe. Turned over to repair crew." <br />John McKinney -U610]/2024 <br />Replaced side sewer from cleanwut to standpipe in <br />sheet with 6- PVC. Depth at standpipe is <br />approximately 3.5' and depth at cleanout <br />appmximately2'. <br />Joann Stillian - 0W02QD24 <br />Reviewed by Finance <br />Page 3 of 4 11/2D2024 <br />