My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
525 112TH ST SE WOODBROOK APARTMENTS 2025-08-22
>
Address Records
>
112TH ST SE
>
525
>
WOODBROOK APARTMENTS
>
525 112TH ST SE WOODBROOK APARTMENTS 2025-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2025 8:09:46 AM
Creation date
1/14/2025 10:00:15 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
525
Tenant Name
WOODBROOK APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2202-029 Description: lavatory sink <br /> Applied:2/23/2022 Approved: 2/25/2022 Site Address: 525 112TH ST SE BLDG OFC <br /> Issued:3/1/2022 Finaled: City,State Zip Code: EVERETT,WA 98208-4063 <br /> Status: EXPIRATION NOTICE SENT Applicant:Omid Mohammadhossieni <br /> Parent Permit: Owner:WOODBROOK INVESTMENT PARTNERS <br /> Parent Project: Contractor: GREEN HOUSE PLUMBING LLC <br /> Details: <br /> lavatory sink <br /> lavatory sink <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PLUMB 02- CORRECTION <br /> 3/2/2022 3/2/2022 GROUND BILLY APPLETON REQUIRED eTRAKiT Inspection Request <br /> WORK/SLAB <br /> Notes: <br /> 3/1/2022 11:15 AM GREEN HOUSE PLUMBING LLC <br /> Contact Name:Omid Mohammadhossieni <br /> Site Address:13330,30th ST <br /> Phone:4256989610 <br /> e-Mail:greenhouseplumbing@gmail.com <br /> (3/2/2022 3:11 PM BGA) <br /> 1. Pro press copper fittings are not allowed under ground if they are installed inside the building.Joints in copper tubing to be installed under ground <br /> must be brazed,installed with no joints.Code ref. UPC 609.3 <br /> 2. Must have an upper terminal cleanout on the 2"line serving floor sink. 1/4"per foot grade is required for the entire length of the run.All waste and <br /> vent piping that penetrate the concrete slab must be wrapped at the penetration with an approved material. <br /> 3.Fixture supply piping stubbed out for sinks must be oriented with the hot on the left and the cold on the right.Code Ref.UPC 417.5 <br /> PLUMB 02- <br /> 3/7/2022 3/7/2022 GROUND BILLY APPLETON APPROVAL eTRAKiT Inspection Request <br /> WORK/SLAB <br /> Notes: <br /> 3/3/2022 9:00 AM GREEN HOUSE PLUMBING LLC <br /> Contact Name:Zimri <br /> Site Address:525 112TH ST SE BLDG OFC <br /> Phone:7026808043 <br /> e-Mail:greenhouseplumbing@gmail.com <br /> I <br /> Printed:Wednesday,05 February, 2025 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.