My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/15/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 1:51:12 PM
Creation date
1/15/2025 1:36:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/15/2025
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Tracking Number
0004652
Total Compensation
$663,840.07
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PAGE <br /> <br /> <br />FULTON STREET PEDESTRIAN BICYCLE CORRIDOR <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 A AUGUST 30, 2024 <br />Category 2: Sensitive information <br />CONTENTS 1 <br /> PAGE 2 <br /> 3 <br /> 4 <br />INTRODUCTION ------------------------------------------------------------------------------------------ 1 5 <br />AMENDMENTS TO THE STANDARD SPECIFICATIONS 6 <br />SPECIAL PROVISIONS 7 <br />DIVISION 1 8 <br />GENERAL REQUIREMENTS 9 <br />DESCRIPTION OF WORK ----------------------------------------------------------------------------- 1 10 <br /> Definitions ------------------------------------------------------------------------------------------------ 2 11 <br />BID PROCEDURES AND CONDITIONS ---------------------------------------------------------- 4 12 <br />1-02.2 Plans and Specifications --------------------------------------------------------------------- 4 13 <br /> General ---------------------------------------------------------------------------------------------------- 4 14 <br /> Proposal Forms ----------------------------------------------------------------------------------------- 5 15 <br /> Preparation of Proposal ------------------------------------------------------------------------------ 5 16 <br /> Recycled Materials Proposal ------------------------------------------------------------------------ 6 17 <br /> Bid Deposit ----------------------------------------------------------------------------------------------- 7 18 <br /> Delivery of Proposal ----------------------------------------------------------------------------------- 7 19 <br /> Irregular Proposals ------------------------------------------------------------------------------------- 9 20 <br /> Disqualification of Bidders ------------------------------------------------------------------------- 10 21 <br /> Pre Award Information ------------------------------------------------------------------------------ 10 22 <br /> Identical Bid Totals ----------------------------------------------------------------------------------- 10 23 <br /> Execution of Contract ------------------------------------------------------------------------------- 11 24 <br /> Contract Bond ----------------------------------------------------------------------------------------- 11 25 <br /> Judicial Review --------------------------------------------------------------------------------------- 12 26 <br /> Coordination of Contract Documents, Plans, Special Provisions, ---------------------- 12 27 <br /> Changes ------------------------------------------------------------------------------------------------ 12 28 <br /> Minor Changes ---------------------------------------------------------------------------------------- 12 29 <br /> Conformity with and Deviations from Plans and Stakes ----------------------------------- 13 30 <br /> Contractor Surveying – ADA Features ---------------------------------------------------------- 13 31 <br /> Removal of Defective and Unauthorized Work ----------------------------------------------- 14 32 <br /> Final Inspection --------------------------------------------------------------------------------------- 14 33
The URL can be used to link to this page
Your browser does not support the video tag.