<br />Fulton Street Pedestrian Bicycle Corridor PAGE 43 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />trucks owned and leased by the DBE must be exclusively employed by 1 <br />the DBE and reflected on the DBE’s payroll. 2 <br /> 3 <br />• Lease agreements for trucks shall indicate that the DBE has exclusive 4 <br />use of and control over the truck(s). This does not preclude the leased 5 <br />truck from working for others provided it is with the consent of the DBE 6 <br />and the lease provides the DBE absolute priority for use of the leased 7 <br />truck. 8 <br /> 9 <br />• Leased trucks shall display the name and identification number of the 10 <br />DBE. 11 <br /> 12 <br />UDBE/DBE/FSBE Truck Unit Listing Log 13 <br />In addition to the subcontracting requirements of Section 1 -08.1, each DBE 14 <br />trucking firm shall submit supplemental information consisting of a completed 15 <br />Primary UDBE/DBE/FSBE Truck Unit Listing Log (WSDOT Form 350 -077), copy 16 <br />of vehicle registrations, and all Rental/Lease agreements (if applicable). The 17 <br />supplemental information shall be submitted to the Engineer prior to any trucking 18 <br />services being performed for DBE credit. Incomplete or incorrect supplemental 19 <br />information will be returned for correction. The corrected Primary 20 <br />UDBE/DBE/FSBE Truck Unit Listing Log and any Updated Primary 21 <br />UDBE/DBE/FSBE Truck Unit Listing Logs shall be submitted and accepted by 22 <br />the Engineer no later than ten calendar days of utilizing applicable trucks. 23 <br />Failure to submit or update the DBE Truck Unit Listing Log may result in trucks 24 <br />not being credited as DBE participation. 25 <br /> 26 <br />Each DBE trucking firm shall complete a Daily UDBE/DBE/FSBE Trucking Unit 27 <br />Listing Log for each day that the DBE performs trucking services for DBE credit. 28 <br />The Daily UDBE/DBE/FSBE Trucking Unit Listing Log forms shall be submitted 29 <br />to the Engineer by Friday of the week after the work was performed. 30 <br /> 31 <br />Joint Checking 32 <br />A joint check is a check between a Subcontractor and the Contractor to the 33 <br />supplier of materials/supplies. The check is issued by the Contractor as payer 34 <br />to the Subcontractor and the material supplier jointly for items to be incorporated 35 <br />into the project. The DBE must release the check to the supplier, while the 36 <br />Contractor acts solely as the guarantor. 37 <br /> 38 <br />A joint check agreement must be approved by the Engineer and requested by 39 <br />the DBE involved using the DBE Joint Check Request Form (form # 272 -053) 40 <br />prior to its use. The form must accompany the DBE Joint Check Agreement 41 <br />between the parties involved, including the conditions of the arrangement and 42 <br />expected use of the joint checks. 43 <br /> 44 <br />The approval to use joint checks and the use will be closely monitored by the 45 <br />Engineer. To receive DBE credit for performing a CUF with respect to obtaining 46 <br />materials and supplies, a DBE must “be responsible for negotiating price, 47 <br />determining quality and quantity, ordering the material, installing and paying for 48 <br />the material itself.” The Contractor shall submit DBE Joint Check Request Form 49 <br />to the Engineer and be in receipt of written approval prior to using a joint check. 50 <br /> 51