Laserfiche WebLink
City of EverettInductive Charging Field Installation for Seaway Transit Center, College Station, and Everett Station - RFQ No. 2021-134 Ron Leimkuhler Zach GrayTaylor Ann MasudaAlex Rempe Michael Vu Samantha PierAmendment 1 - April 24, 2023 Principal/QAQC Project Manager Design Engineer Design Engineer CAD Tech Project Coordinator Billing Rate (2022)223.59$ 215.49$ 119.94$ 103.59$ 97.98$ 86.97$ Task #Scope of Services1 Civil Engineering and Design1.1 Civil design for additional transformers, switchboards, & equipment.1 4 32 12 2 51Task 1 Total Hours1 4 32 0 12 2 51Task 1 Cost by Staff223.59$ 861.96$ 3,838.08$ -$ 1,175.76$ 173.94$ 6,273.33$ Total Budget (Not to Exceed) 6,273.33$ TotalHours