My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erika Frost 1/15/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Erika Frost 1/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 2:18:39 PM
Creation date
1/15/2025 2:18:19 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Erika Frost
Approval Date
1/15/2025
End Date
12/31/2025
Department
Communications & Engagement
Department Project Manager
Pipa Escalante
Subject / Project Title
Graphic Design
Tracking Number
0004653
Total Compensation
$25,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />PROFESSIONAL SERVICES AGREEMENT <br />This Professional Services Agreement (“Agreement”) is effective as of the date of last <br />signature below and is between the City of Everett, a Washington municipal corporation (the <br />“City”), and the Service Provider identified in the Basic Provisions below (“Service Provider”). This <br />Agreement is for the purpose of the Service Provider providing services as set forth in this <br />Agreement. This Agreement includes the Basic Provisions, the attached General Provisions, and <br />the scope of work attachment, if any, referenced in the Basic Provisions. <br />BASIC PROVISIONS <br />Service Provider <br />Erika Frost <br />12600 54th Drive SE <br />Snohomish, WA 98296 <br />erikagfrost@gmail.com <br />City Project <br />Manager <br />Pipa Escalante <br />City of Everett -- Communications and Engagement <br />2930 Wetmore Ave. <br />Everett, WA 98201 <br />pescalante@everettwa.gov <br />Scope of Work <br />(must select one) <br />☐Scope of Work is attached. One sentence summary of scope of work is as <br />follows Enter text <br />☒Scope of Work is not attached. Instead, the Scope of Work is as follows: <br />graphic design for various City of Everett departments
The URL can be used to link to this page
Your browser does not support the video tag.