My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Terracon Consultants, Inc 1/9/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Terracon Consultants, Inc 1/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 2:33:40 PM
Creation date
1/15/2025 2:33:10 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Terracon Consultants, Inc
Approval Date
1/9/2025
End Date
12/31/2025
Department
Human Resources
Department Project Manager
Megan Munro
Subject / Project Title
Asbestos Monitoring 1211 Hemlock SWAT Training
Tracking Number
0004660
Total Compensation
$7,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Proposal for TEM Air Sampling <br />City of Everett |Everett, Washington <br />November 26, 2024 | Terracon Proposal No. P81247702 <br />Facilities | Environmental | Geotechnical | Materials 3 <br />Conditions that incorporate the scope of work and fees herein. The final report will be <br />submitted within 15 business days after receipt of final laboratory analytical results <br />To facilitate our compliance with the proposed schedule, please provide the following items <br />at the time of notification to proceed or contract execution. <br />On-site point of contact to provide access to the project area. <br />Building floor plans in AutoCAD or another electronic format showing current <br />configuration of the project area(s). On-site creation of floor plans for identifying <br />sample locations may lead to additional fees. <br />Notification to building occupants, if applicable. <br />Advance notification (prior to site mobilization) of restrictions or special access <br />requirements or any operational changes or unique circumstance that might affect <br />the scheduled investigation or inspections. <br />Advance notification (prior to site mobilization) of any known environmental <br />conditions at the site (i.e., hazardous materials or processes, specialized protective <br />equipment requirements, unsound structural members, etc.). <br />4.0 SCOPE AND REPORT LIMITATIONS <br />The findings and conclusions presented in the final report will be based on the site <br />conditions on the date(s) of the inspection. The scope of work is based on information <br />provided by the Client. If actual site conditions lead to additional fees, Terracon will contact <br />the Client for authorization prior to incurring those additional costs. <br />Terracon’s services will be performed in a manner consistent with generally accepted <br />practices of the profession undertaken in similar studies. Terracon makes no warranties, <br />express or implied, regarding its services, conclusions, or recommendations. These services <br />will be performed in accordance with the scope of work agreed upon with you, our client, as <br />set forth in this proposal. <br />The analysis, comments, and recommendations presented in the final report will be based <br />on the information collected as described in this proposal. When requested by the Client, <br />Terracon may provide verbal or electronic (interim) information prior to completing the final <br />report. Terracon does not recommend sole reliance on interim information regarding the <br />results of the investigation. Due to time constraints, such information may be based upon <br />limited or incomplete information and data evaluation. Consequently, the content of the <br />final report takes precedence over any previously conveyed information.
The URL can be used to link to this page
Your browser does not support the video tag.