Laserfiche WebLink
IPMC 106.1 Unlawful acts. It shall be unlawful for a person,firm or corporation to be in conflict with or <br /> in violation of any of the provisions of this code. <br /> • The conversion of the garage into an additional dwelling unit without permits is an unlawful <br /> structure as defined by International Property Maintenance Code(IPMC)108.1.4 and is a <br /> violation of International Residential Code(IRC)R105.1 and IPMC 106.1,which reads: <br /> IRC R105.1,Required.Any owner or owner's authorized agent who intends to construct,enlarge,alter, <br /> repair, move,demolish or change the occupancy of a building or structure,or to erect, install, enlarge, <br /> alter, repair, remove,convert or replace any electrical,gas,mechanical or plumbing system,the <br /> installation of which is regulated by this code,or to cause any such work to be performed,shall first <br /> make application to the building official and obtain the required permit. <br /> IPMC 108.1.4 Unlawful structure.An unlawful structure is one found in whole or in part to be occupied <br /> by more persons than permitted under this code,or was erected,altered or occupied contrary to law. <br /> IPMC 106.1 Unlawful acts. It shall be unlawful for a person,firm or corporation to be in conflict with or <br /> in violation of any of the provisions of this code. <br /> CORRECTIVE ACTIONS REQUIRED: By 6/4/2024,the Responsible Person(s)shall take the following actions to <br /> correct the Code Violations at the Property: <br /> • Contact the City of Everett Permit Services Division located at 3200 Cedar Street to submit <br /> complete permit applications for all the necessary and required permits to bring the property <br /> into compliance. Information on the City of Everett permit application process and required <br /> documents can be found at www.everettwa.gov/permits. <br /> • When permits are issued,then,correct and complete all of the deficiencies that are present <br /> within the structure and have the work inspected and approved, by the Everett City Building <br /> Division. <br /> Note that all required permits(if applicable)to perform the corrective action must be obtained from the <br /> proper issuing agency. <br /> CIVIL PENALTIES: If the corrective action is not completed by the date set for compliance, a monetary <br /> penalty in the amount of$250 shall accrue for each day or portion thereof that each violation continues <br /> beyond the date for compliance set in this Notice and Order, until compliance with the Notice and Order <br /> is achieved. (EMC 1.20.190) <br /> IMPORTANT NOTE: PAYMENT OF THE MONETARY PENALTY DOES NOT RELIEVE THE VIOLATOR OF THE <br /> DUTY TO CORRECT, ABATE OR STOP THE CODE VIOLATIONS AND/OR PAY ANY AND ALL OTHER COST <br /> ASSESSED. <br /> CosT OF ENFORCEMENT: Per EMC 1.20.180, the City is authorized to recovery any and all costs of <br /> enforcement related to ensuring the Property is brought into compliance. <br /> RECORDING: This Notice and Order may be recorded with the Snohomish County Assessor's Office, <br /> subsequent to service of the Notice on the responsible person(s).(EMC 1.20.140) <br /> Notice and Order Page 2 of 4 <br />