My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2025 2:27:40 PM
Creation date
1/22/2025 2:25:05 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: CSO Storage at 36th Street; PSA Amendment 2 with Jacobs Engineering Group Inc. <br />Council Bill # interoffice use <br /> <br />Project: CSO Storage at 36th Street (UP 3765) <br />Partner/Supplier: Jacobs Engineering Group Inc. <br /> Location: 36th Street, east of Smith Ave. (Transit site) <br /> Preceding action: Original PSA authorized 2/3/21 Amendment No. 1 authorized 11/2/22 <br />Fund: 336 – Water and Sewer System Improvements <br />Agenda dates requested: <br />January 22, 2025 <br /> <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />PSA Amendment form <br /> <br />Department(s) involved: <br />Public Works <br /> <br />Contact person: <br />Tom Hood <br /> <br />Phone number: <br />425-257-8809 <br /> <br />Email: <br />thood@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />This project is included in the current Public Works Capital Improvements Program for Sewer <br />Infrastructure. The funding source for this project will be Fund 401 Water & Sewer Utility Fund. <br />The programmed available funding for the preliminary and final design of this project is <br />$3,500,000. <br />Project summary statement: <br />Periodic sewer flooding and uncontrolled combined sewer overflows into the Snohomish River <br />occur in the sewer catchment areas served by outfalls SRO7 and SRO8 and are influenced by <br />heavy precipitation events. These events violate the City’s National Pollutant Discharge <br />Elimination System (NPDES) permit issued by the Washington State Department of Ecology. <br />The current PSA Amendment 1 scoped and budgeted Jacobs Engineering Group Inc. to proceed <br />from preliminary into detailed design of a combined sewer overflow storage tank, and a diversion <br />pipe on a separate site. This Amendment No. 2 would authorize Jacobs Engineering Group Inc. to <br />complete design, continue design coordination with other City capital projects, and provide <br />additional support for permitting with WSDOT and BNSF. <br />This project will help bring the City into compliance with its NPDES permit for the SRO7 and SRO8 <br />basins. Subsequent projects may be needed to fully control CSO discharges at SRO7 and SRO8. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign Amendment No. 2 with Jacobs Engineering Group, Inc. in the <br />amount of $309,641 (for total contract amount of $3,124,637). <br /> <br />City Council Agenda Item Cover Sheet
The URL can be used to link to this page
Your browser does not support the video tag.