3003 W CASINO RD BLDG 40-23 Geotech Report 2025-01-22
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-23
>
Geotech Report
>
3003 W CASINO RD BLDG 40-23 Geotech Report 2025-01-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2025 3:06:53 PM
Creation date
1/22/2025 3:03:56 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-23
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on various support equipment. We understand that the allowable differential slab deflection within a 4-foot <br />distance is less than 4/10,000 of an inch. We understand the design team has elected to support the HBL <br />positions on a minimum 4-foot-thick structural mat foundation. <br />5.3.1. Mat Foundation <br />PLAXIS 3D Finite Element Analysis was used to evaluate the modulus of subgrade reaction beneath the <br />proposed 4-foot-thick mat foundation for varying thicknesses of weathered glacial till based on the <br />observed subsurface conditions in the current borings. The results of the PLAXIS 3D modeling indicate that <br />a uniform modulus of subgrade reaction of 475 pci is appropriate for design of the mat foundation for HBL <br />Positions 5 through 7. Additional details of the PLAXIS analyses are provided in Appendix D. <br />5.4. Earthwork <br />5.4.1. Site Preparation <br />Site development will require demolition of the existing slab, new foundation construction, and installation <br />of subsurface utilities. The existing soils underlying the concrete slab possess high fines (silt) content such <br />that they are moisture sensitive. Based on the results of laboratory moisture content tests, the soils are <br />near the optimum content required for adequate compaction and should be suitable for re -use at other <br />sites provided they are protected from wet weather. <br />Following excavation, we recommend the exposed subgrade be evaluated by a representative from our firm <br />to assess the adequacy of the subgrade conditions and to confirm subsurface soils are as anticipated. <br />Any disturbed or otherwise unsuitable areas identified should be excavated and replaced with crushed rock <br />or controlled density fill (CDF) as recommended. <br />5.4.2.Structural Fill <br />We anticipate that minor quantities of structural fill may be required to backfill against foundation elements. <br />Crushed rock or CDF should be utilized for structural backfill. We recommend that GeoEngineers be present <br />to evaluate the exposed subgrade soils in the foundation areas, and during placement of structural fill. We <br />will evaluate the adequacy of the subgrade soils and identify areas needing further work, perform in -place <br />moisture -density tests and advise on any modifications to the procedures that may be appropriate for the <br />prevailing conditions. Each lift of structural fill (if crushed rock is used) should be uniformly compacted to <br />at least 95 percent of the maximum dry density (MDD) as determined in accordance with the ASTM <br />International (ASTM) D 1557 test method. <br />5.4.2.1. Re -use of On -site Soils <br />The on -site soils are moisture -sensitive and generally have natural moisture contents that are near the <br />anticipated optimum moisture content for compaction. As a result, the on -site soils will likely be suitable <br />for re -use as structural fill at other sites, provided the soils meet project criteria for gradation and are <br />protected from wet weather. <br />5.4.2.2. Fill Placement and Compaction Criteria <br />Structural fill should be mechanically compacted to a firm, non -yielding condition. Structural fill should be <br />placed in loose lifts approximately 6 to 8 inches thick (small vibratory equipment) or 10 to 12 inches thick <br />(large vibratory equipment). Each lift should be conditioned to the proper moisture content and compacted <br />to the specified density before placing subsequent lifts. Structural fill placed against foundation elements <br />GEOENGINEERS June 15, 2022 Page <br />file NoO 0-29G-02 <br />