Laserfiche WebLink
O <br /> w <br /> to <br /> u,m <br /> W 3-Z <br /> 0 =O <br /> o U <br /> K� GZ <br /> —= i j Q <br /> a Ww <br /> =S <br /> n~ <br /> SLAB-ON-GRADE m m <br /> STOOP <br /> —STUB OUTy <br /> ----- a <br /> (3 PLACES) W <br /> I I <br /> TYP <br /> I la` I <br /> t <br /> T OHM <br /> x <br /> EMS' <br /> C� --_I <br /> I <br /> L J <br /> I I <br /> I- <br /> r- <br /> co U- <br /> i 11 W <br /> I L®J L J <br /> < <br /> D_' <br /> HD 1g'_1Yz" — O Z <br /> I <br /> Z W <br /> W W <br /> � LPN PLAN NOTE 1 L- J I <br /> (ELEV VARIES) __ 1y" 2.0' <br /> I I ALL FRAMING OR HARDWARE <br /> _ NOT SHOWN OR SPECIFIED <br /> I 1'-0Ya I TO REMAIN UNCHANGED <br /> I I I I I I <br /> I I - 1 W <br /> )BOUT I srEP ` STUB OUT I w <br /> . 3AR 18" I r + _——— REBAR ta" I L ; <br /> LACES) I (3 PLACES) i I O W <br /> FISTEIP <br /> IFOUNDATION PLAN NOTES STEP o ., STEP 1 Slab on-Grade shams-Slb sh II b p etl F D ng Granu�II per Geotechnical Repoli See Architectural Q <br /> ATTACH 2x PORCH WALLS LIDrawings for Slab Elevet on Depresson tl SI p qu msZ <br /> DIRECTLYT PORCHSLAB PER 72/S07 I SIEP_ I - —_—' L ___ — - 2 Con struction/Contml Jont n Slabs are optional but recommended to control crackng When used slab areas behveen teats shah—I be aPMox matelY square antl 400sf or kss r——_ ----- 'S' M3. Contractor shall dy graded actual foot ng elevat ost epth.on final gratles and sle conditions.Bottom of Foot ngs shall ba set Z <br /> TheS yon competent properly gratlad bear ng so 1 below Frasl Depth. O <br /> °� 4 Anchor Bolls for Etenor Stud Walls shall ben accordance with Pt-6ofthe ShearWall SchaduleW VS06,u.o.n.5. See 101S06 for Simpson to USP hardware converson table.SLAB-ON-GRADE <br /> PORCH Hp ATTACH 2x PORCH WALLS LL Ln <br /> REFER TO ARCH'L SECTION S07� q�-4Yg" DIRECTLY TO PORCH SLAB L -- ----- LEGEND a+ <br /> 038/4 FOR FRONT PORCH _ _ ,-�,Z„ PER 12/S07 1 1�-i0Y'• <br /> 6 8' <br /> FOUNDATION CONSTRUCTION l <br /> REFER TO ARCH'L SECTION DETAIL CALL-OUT <br /> D3814 FOR FRONT PORCH SX. <br /> FOUNDATION CONSTRUCTION g-5" 2'-10Ys <br /> FP-1--X-1 ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF VS03 <br /> EXTENDED FRONT PORCH OPTION-ELEV.'A' S--N-GRADE PER PLAN NOTE I k <br /> m <br /> L FOUNDATION WALL N <br /> I -1 RAISED FOUNDATION WALL <br /> w <br /> a <br /> BEARING OR SHEAR WALL ABOVE NN <br /> A <br /> CRAWL SPACE POST BELOW � <br /> FOOTING CALL-OUT SEE 5/807 <br /> lY <br /> STEP STEP TOP OF STEM WALL <br /> 0 1 2 4 8 16 <br /> S02A(M) <br />