My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9914 18TH AVE W C 2025-03-03
>
Address Records
>
18TH AVE W
>
9914
>
9914 18TH AVE W C 2025-03-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 7:31:33 AM
Creation date
1/23/2025 11:49:19 AM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9914
Unit
C
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
113TIL 19011 Wood-Sno Road NE,Suite 100 <br /> Woodinville,WA 98072-4436 <br /> Phone:(425)814-8448 <br /> ENGINEERING Fax:(425)821-2120 <br /> SPECIAL INSPECTION <br /> Date: June 12,2024 <br /> To: Pacific Ridge Homes <br /> Attn: Ezra Schrader <br /> From: Aiden Bernhardt,P.E. <br /> Project: Benton Square TH—Building A Pages: 2 <br /> BTL Engineering has performed Special Inspection as required by the City of Everett for shear walls with edge <br /> nailing at 4"on center or less for the abovementioned project. The following Special Inspection Report includes a <br /> summary of our site visit. <br /> Construction Documents: <br /> ❑ Construction Set dated 06/08/2023 <br /> Progress of construction: <br /> ❑ Date of inspection:05/22/2024 <br /> ❑ Foundation completed <br /> ❑ Framing completed <br /> Items observed: <br /> 31d Floor Exterior Walls: <br /> ❑ Front PI-3 Exterior Shear Wall(C-Units) <br /> o Edge Nailing and Sheathing Splices:Construction conforms to plan set. <br /> Note: (1)instances of the party wall end nailing not tying into the exterior wall per detail 8/S06 <br /> were observed at time of inspection.Builder has been notified and has provided pictures of <br /> the resolution.Construction conforms to plan set. <br /> o Panel Seam Construction. (4)instances of P1-3 wall missing double studs at the adjoining panel <br /> edges per Detail 1/S06 were observed at time of inspection.Builder has been notified and has <br /> provided pictures of the resolution.Construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans.Construction conforms to plan set. <br /> 2nd Floor Exterior Walls: <br /> ❑ Front/Rear P1-2 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices: <br /> Note: (2)instances of the party wall end nailing not tying into the exterior wall per detail 8/S06 <br /> were observed at time of inspection.Additionally,(2)instances of insufficient nailing were <br /> observed at time of inspection.Builder has been notified and has provided pictures of the <br /> resolution.Construction conforms to plan set. <br /> o Panel Seam Construction: <br /> Note: (2)instances of P1-2 wall missing double studs at the adjoining panel edges per Detail 1/S06 <br /> were observed at time of inspection.Builder has been notified and has provided pictures of <br /> the resolution.Construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans: <br /> o Note:The truss and bottom plate nailing of the wall above per detail 7/S08 and 6/S08 was <br /> observed to be missing along the entire building length.Builder has been notified and has <br /> provided pictures of the resolution.Construction conforms to plan set. <br />
The URL can be used to link to this page
Your browser does not support the video tag.