Laserfiche WebLink
June 12, 2024 <br /> PI Floor Exterior Walls: <br /> ❑ Front P2-2 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices:Construction Conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans:Construction Conforms to plan set. <br /> o Panel Seam Construction.Note: (7)instances of the garage door horizontal straps per 4/SO6 were <br /> observed to be missing at time of inspection.Builder was notified and provided pictures of a <br /> resolution.Construction conforms to plan set. <br /> o Anchor bolt spacing:Construction conforms to plan set. <br /> ❑ Rear P1-2 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices:Construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans.Construction conforms to plan set. <br /> o Panel Seam Construction.Construction conforms to plan set. <br /> o Anchor bolt spacing: Construction conforms to plan set. <br /> Give me a call if you have any questions or comments. <br /> Sincerely, <br /> Aiden Bernhardt,P.E. T. <br /> BTL Engineering <br /> IM <br /> ssronuc ` <br /> • Page 2 <br />