Laserfiche WebLink
June 24, 2024 <br /> PI Floor Exterior Walls: <br /> ❑ Front P2-2 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices:Note:(5)instances of insufficient nailing were observed at <br /> time of inspection.Builder has been notified and has provided pictures.Builder confirms <br /> construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans:Construction Conforms to plan set. <br /> o Panel Seam Construction.Note:All instances of the garage door straps per 4/S06 were observed <br /> to be missing at time of inspection.Builder has been notified and has provided pictures of <br /> the resolution.Construction conforms to plan set. <br /> o Anchor bolt spacing:Construction conforms to plan set. <br /> ❑ Rear P1-2 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices:Construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans.Construction conforms to plan set. <br /> o Panel Seam Construction.Construction conforms to plan set. <br /> o Anchor bolt spacing.Note:All anchor bolts were observed to be located too far away from the <br /> exterior sheathing per 1/S06.Builder has been notified and has provided pictures of the <br /> resolution;Builder confirms Construction conforms to plan set. <br /> Give me a call if you have any questions or comments. <br /> Sincerely, <br /> Aiden Bernhardt,P.E. <br /> T.BTL Engineering Q,� 9 <br /> �d966 �� <br /> SIGNAL� <br /> • Page 2 <br />