GENERAL NOTES ABBREVIATIONS U)
<br /> 1. INFORMATION CONTAINED IN THESE DRAWINGS ARE BASED ON LIMITED FIELD MEASUREMENTS.THE INFORMATION CONTAINED HEREIN MAY REQUIRE ADJUSTMENTS OR MODIFICATIONS TO CONFORM WITH EXISTING CONDITIONS. IN CASES WHERE ABV-ABOVE FLR-FLOOR PL-PLATE ' '
<br /> CHANGES ARE NECESSARY,THESE DRAWINGS SHALL BE USED TO SHOW THE DESIGN INTENT ONLY. ACOUS-ACOUSTICAL FND-FOUNDATION PLAM-PLASTIC LAMINATE LJJ
<br /> ���
<br /> ACT-ACCOUSTICAL CEILING FR-FIRE RESISTIVE,FIRE PLT-PLATFORM
<br /> 2. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS PRIOR TO COMMENCEMENT OF WORK,AND WILL NOTIFY THE OWNER AND ARCHITECT IMMEDIATELY IF EXISTING CONDITIONS PROHIBIT THE EXECUTION OF THE DESIGN INTENT. o
<br /> TILE RATED PNT-PAINT "2 o
<br /> LL
<br /> 3. IF ANY DISCREPANCY EXISTS BETWEEN ARCHITECTURAL AND ENGINEERING DRAWINGS,THE CONFLICT SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND THE ARCHITECT FOR RESOLUTION. IN THE EVENT OF A CONFLICT ADJ-ADJACENT,ADJUSTABLE FT-FOOT,FEET PP-POWER POLE I�L t c m
<br /> BETWEEN APPLICABLE CODES®ULATIONS&REFERENCE STANDARDS OF THESE PLANS&SPECIFICATIONS,THE MORE STRINGENT PROVISIONS SHALL GOVERN. AFF-ABOVE FINISH FLOOR FTG-FOOTING PSF-POUNDS PER SQUARE t�
<br /> ALT-ALTERNATE FURR-FURRING FOOT Q 3
<br /> 4. CONTRACTOR SHALL COORDINATE THE WORK OF ALL TRADES AND SUBCONTRACTORS.CONTRACTOR SHALL FURNISH ALL COMPONENTS REQUIRED FOR COMPLETE INSTALLATION. ALUM-ALUMINUM GA-GAGE PSI-POUNDS PER SQUARE < 6 m
<br /> 5. CONTRACTOR MAY SUBSTITUTE MATERIALS AND/OR CONSTRUCTION ITEMS AND METHODS UPON SUBMITTAL OF A SUBSTITUTION IN WRITING OR BY SAMPLE TO THE OWNER AND ARCHITECT. ANY COST CHANGES MUST ALSO BE SUBMITTED. THE ANOD-ANODIZED GALV-GALVANIZED NCH -J M N
<br /> OWNER WILL COMMUNICATE ITS DECISION TO THE CONTRACTOR. SUBSTITUTIONS FOR LONG LEAD ITEMS MUST BE PROPOSED EARLY ENOUGH THAT NO DELAY IS CREATED IN COMPLETION OF THE PROJECT,OTHERWISE THE CONTRACTOR SHALL ARCH-ARCHITECTURAL GC-GENERAL CONTRACTOR PT-PRESSURE TREATED w n
<br /> ASSUME RESPONSIBILITY FOR ANY COST TO THE TENANT ARISING OUT OF SUCH WORK. ASPH-ASPHALT GLS-GLASS PTD-PAINTED
<br /> 6. EXCEPT AS SPECIFICALLY NOTED,CONTRACTOR SHALL PROVIDE AND PAY FOR LABOR,MATERIALS,EQUIPMENT,TOOLS,CONSTRUCTION EQUIPMENT AND MACHINERY,THEIR FACILITIES,TEMPORARY UTILITIES,AND SERVICES NECESSARY FOR B.O.-BOTTOM OF GRD-GRADE,GROUND PV-PLUMBING VENT
<br /> BLDG-BUILDING GV-GAS VALVE PWD/PLYWD
<br /> PROPER EXECUTION AND COMPLETION OF WORK. RAD-RADIUS
<br /> BLKG-BLOCKING GWB- GYPSUM WALLBOARD
<br /> 7. CONTRACTOR SHALL PAY LEGALLY REQUIRED SALES,CONSUMER AND USE TAXES.CONTRACTOR WILL NOT BE REQUIRED TO PAY FOR PERMITS PREVIOUSLY OBTAINED. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS. BLW-BELOW GYP-GYPSUM RB-RUBBER BASE ®cuRKi snRNes
<br /> CONTRACTOR SHALL INSURE FULL COMPLIANCE WITH FLAME SPREAD REQUIREMENTS. BM-BEAM H.D.-HOT DIPPED RCP-REFLECTED CEILING
<br /> BOT-BOTTOM HB-HOSE BIB PLAN
<br /> 8. IF REVISIONS TO THE DRAWINGS ARE REQUESTED BY THE OWNER,THE CONTRACTOR IS TO SUBMIT THE COSTS IN WRITING TO THE OWNER AND RECEIVE WRITTEN APPROVAL PRIOR TO PROCEEDING WITH ANY WORK. BRG-BEARING HC-HANDICAP RD-ROOF DRAIN
<br /> 9. CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING ALL APPLICABLE EXISTING UTILITIES,EQUIPMENT,AND POWER SOURCES. ALL ELECTRICAL WORK TO BE COORDINATED WITH UTILITY COMPANY AS APPLICABLE. FIELD VERIFY LOCATIONS AND CAB-CABINET HDWR-HARDWARE REC-RECOMMENDED
<br /> QUANTITY OF EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT TO BE REMOVED RELOCATED OR REVISED AS A RESULT OF THIS WORK. PROVIDE ALL LABOR AND MATERIAL REQUIRED TO DISCONNECT,RE-CONNECT,INSTALL OR RELOCATE CB-CATCH BASIN HGT-HEIGHT
<br /> REF-REFERENCE,REFER
<br /> MECHANICAL AND ELECTRICAL EQUIPMENT.
<br /> CIP-CAST-IN-PLACE HM-HOLLOW METAL REF-REFRIGERATOR
<br /> 10.SUBCONTRACTORS AND MATERIAL SUPPLIERS ARE SUBJECT TO REVIEW AND APPROVAL BY OWNER. CJ-CONTROL JOINT HORIZ-HORIZONTAL REINF-REINFORCED Z J
<br /> CL-CENTERLINE HPC-HIGH PERFORMANCE REQ,REQ'D-REQUIRED W W
<br /> 11.THE EFFECTIVE DATE OF WARRANTIES,GUARANTEES AND MANUFACTURER'S INSTRUCTIONS ON EQUIPMENT FURNISHED AND INSTALLED AS PART OF THIS WORK,SHALL BE THE DATE OF SUBSTANTIAL COMPLETION. CLG-CEILING COATING RM-ROOM � w
<br /> CLR-CLEAR HR-HOUR RO-ROUGH OPENING
<br /> 12.CONTRACTOR SHALL REPAIR ALL DAMAGES CAUSED BY HIM OR HIS SUBCONTRACTORS DURING CONSTRUCTION. CMU-CONCRETE MASONRY ID-INSIDE DIAMETER S.S-STAINLESS STEEL 0 I j Q
<br /> 13.CONTRACTOR TO DISPOSE OF ALL REFUSE OFFSITE AT A LEGAL DUMP SITE. UNIT INST-INSTALL,INSTALLER SBC-SEATTLE BUILDING CODE Q w LLI
<br /> COL-COLUMN INSUL-INSULATION SC-SOLID CORE
<br /> 14.ALL WORKMANSHIP AND MATERIALS SHALL BE GUARANTEED FOR ONE YEAR AFTER WRITTEN ACCEPTANCE. CONC-CONCRETE INT-INTERIOR SCHED-SCHEDULE, Q w W
<br /> CONST-CONSTRUCTION JAN-JANITOR SCHEDULED m U) LLI
<br /> 15.THE BUILDING PERMIT SHALL BE SECURED BY THE OWNER. ALL OTHER PERMITS NECESSARY TO COMPLETE THE CONTRACTOR'S WORK SHALL BE RESPONSIBILITY OF THE CONTRACTOR AS WELL AS THE ASSOCIATED COSTS. CONT-CONTINUOUS JT-JOINT SDMH-STORM DRAIN W
<br /> 16.DIMENSIONS ARE TO FACE OF DRYWALL,UNLESS NOTED OTHERWISE. CPT-CARPET LAM-LAMINATED MANHOLE J O N
<br /> CT-CERAMIC TILE LAV-LAVATORTY SECT-SECTION C� _
<br /> W
<br /> 17.DO NOT SCALE DRAWINGS. CTR-CENTER LB-POUND SF-SQUARE FEET coo
<br /> 18.ABBREVIATIONS USED ARE THOSE IN COMMON USE. ARCHITECT WILL DEFINE INTENT OF ANY IN QUESTION. DET,DTL-DETAIL LG-LARGE SHT-SHEET w -) r.-
<br /> DF-DRINKING FOUNTAIN LOC-LOCATION SIM-SIMILAR J
<br /> SL-STREET LIGHT Qf (�
<br /> 19.CONTRACTOR SHALL PROVIDE AND COORDINATE ALL PLUMBING,MECHANICAL,&ELECTRICAL SYSTEMS AND THEIR ASSOCIATED SUBCONTRACTORS TO ENSURE COMPLETE OPERATING SYSTEMS, DIA-DIAMETER LP-LIGHT POLE SM-SMALL =
<br /> DIM-DIMENSION M.O.-MASONRY OPENING SPEC-SPECIFICATION
<br /> 20.ALL MANUFACTURED MATERIALS,COMPONENTS,FASTENERS,ASSEMBLIES,ETC.,SHALL BE HANDLED&INSTALLED IN CONFORMANCE W/MFR'S SPECIFICATIONS&INSTRUCTIONS. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR ARCHITECT'S DN-DOWN MACH-MACHINE (�
<br /> REVIEW&APPROVAL AS APPLICABLE. DS-DOWNSPOUT MATL-MATERIAL SQ-SQUARE
<br /> SS-SANITARY SEWER
<br /> DISHWASHER MAX-MAXIMUM 21.THE CONTRACTOR SHALL PROVIDE ALL CEILING AND/OR WALL ACCESS PANELS/DOORS AS REQUIRED BY THE AIR CONDITIONING,PLUMBING&ELECTRICAL SYSTEMS. PROVIDE APPROVED ASSEMBLIES W/SELF-CLOSING DEVICES IN RATED DW- STD-STANDARD
<br /> CONSTRUCTION. (PAINT ADJACENT WALL COLOR). DWG-DRAWING MDF-MEDIUM DENSITY STD-STEEL
<br /> E,(E)-EXISTING FIBERBOARD 22.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CORRECTING CLEARANCE CONFLICTS RELATED TO ITS MECHANICAL,ELECTRICAL&LIFE SAFETY SYSTEM WORK. THIS INCLUDES CONFLICTS BETWEEN NEW&EXISTING BUILDING SYSTEMS. EA-EACH MDO-MEDIUM DENSITY STRUSTRUC-STRUCTURAL
<br /> 23.NO FLAMMABLE LIQUIDS,WELDING/CUTTING EQUIPMENT,OR COMPRESSED GASES SHALL BE USED BY CONSTRUCTION CONTRACTOR,EXCEPT UNDER SPECIFIC FIRE DEPARTMENT PERMIT. THIS INCLUDES DEMOLITION WORK. EF-EXHAUST FAN OVERLAY SYM-SYMMETRICAL
<br /> EJ,EXP JT-EXPANSION JOINT MECH-MECHANICAL T.B.D.-TO BE DETERMINED
<br /> 24.ALL PENETRATIONS OF FIRE RESISTIVE CONSTRUCTION SHALL BE PROTECTED WITH APPROVED FIRE ASSEMBLIES. ELEC-ELECTRIC(AL) MED-MEDIUM T.O.-TOP OF
<br /> 25.ALL WORK SHALL CONFORM TO CURRENT APPLICABLE CODES. ELEV-ELEVATION OR MFR-MANUFACTURER TEL-TELEPHONEELEVATOR MIN-MINIMUM TG-TEMPERED GLASS
<br /> 26.PROVIDE BACKING FOR ALL ACCESSORIES&CABINETS,TYPICAL. EQ-EQUAL MIR-MIRROR TS-TUBE STEEL
<br /> EXP-EXPANSION,EXPOSED MISC-MISCELLANEOUS TSP-TELEPHONE SERVICE
<br /> 27.CONTRACTOR TO CLEAN ALL SURFACES OF DIRT AND DEBRIS PRIOR UPON SUBSTANTIAL COMPLETION OF PROJECT. EXT-EXTERIOR MTD-MOUNTED POLE
<br /> sail
<br /> 28.CONTRACTOR TO PROVIDE A CLOSEOUT BINDER WITH ALL REQUIRED DOCUMENTS INCLUDING APPLICABLE CALCULATIONS,COMPLIANCE FORMS AND REPORTS,AND RATING CERTIFICATES TO OWNER WITHIN 90 DAYS OF OCCUPANCY. F.O-FACE OF MTL-METAL TYP-TYPICAL
<br /> F.O.S.-FACE OF STUD N.A.-NOT APPLICABLE
<br /> UL-UNDERWRITER'S ARCHirecr
<br /> F.O.W.-FACE OF WALL NIC-NOT IN CONTRACT LABORATORY sc�. �_
<br /> F.T.-FIRE TREATED NO.-NUMBER NON-UNLESS OTHERWISE
<br /> CONSTRUCTION SAFEGUARDS FA-FIRE ALARM NOWNOMINAL NOTED
<br /> V.I.F.-VERIFY IN FIELD srnr�-
<br /> FD-FLOOR DRAIN NTS-NOT TO SCALE VB-VINYL BASE
<br /> IEBC 1501.1-SCOPE: THE PROVISIONS OF THIS CHAPTER SHALL GOVERN SAFETY DURING CONSTRUCTION AND THE PROTECTION OF ADJACENT PUBLIC AND PRIVATE PROPERTIES FDC-FIRE DEPARTMENT O.C.-ON CENTER VCR-VINYL COMPOSITION TILE
<br /> CONNECTION O.D.-OUTSIDE DIAMETER
<br /> VER-VERIFY DATE' 12/14/23
<br /> IEBC 1501.2-STORAGE AND CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE STORED AND PLACED SO AS NOT TO ENDANGER THE PUBLIC,THE WORKERS OR ADJOINING PROPERTY FOR THE DURATION OF THE CONSTRUCTION PROJECT FE-FIRE EXTINGUISHER O.H.-OPPOSITE HAND VERT-VERTICAL JOB NO. 23-011
<br /> PLACEMENT: FEC-FIRE EXTINGUISHER O/-OVER W.R.-WEATHER RESISTANT PERMIT NO. B2404-010
<br /> IEBC 1501.3-ALTERATIONS, REQUIRED EXITS,EXISTING STRUCTURAL ELEMENTS,FIRE PROTECTION DEVICES AND SANITARY SAFEGUARDS SHALL BE MAINTAINED AT ALL TIMES DURING ALTERATIONS,REPAIRS OR ADDITIONS TO ANY BUILDING OR CABINET OD_OVERFLOW DRAIN W/-WITH
<br /> REPAIRS AND ADDITIONS: STRUCTURE ELE-FINISH FLOOR OPN-G-OPENING y/D-WOOD REVISIONS:
<br /> ELEVATION OPP-OPPOSITE
<br /> FH-FIRE HYDRANT WIN,WDW-WINDOW
<br /> IEBC 1501.4-MANNER OF WASTE MATERIALS SHALL BE REMOVED IN A MANNER THAT PREVENTS INJURY OR DAMAGE TO PERSONS,ADJOINING PROPERTIES AND PUBLIC RIGHTS-OF-WAY P.T.-POST TENSIONED WP_WATERPROOF DATE DESCRIPTION
<br /> REMOVAL: FIN-FINISH
<br /> PERP-PERPENDICULAR WT-WEIGHT
<br /> FLASH-FLASHING
<br /> IEBC 1501.5-FIRE SAFETY FIRE SAFETY DURING CONSTRUCTION SHALL COMPLY WITH THE APPLICABLE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE AND THE APPLICABLE PROVISIONS OF CHAPTER 33 OF THE INTERNATIONAL FIRE
<br /> DURING CONSTRUCTION: CODE
<br /> IEBC 1501.6-PROTECTION OF PEDESTRIANS SHALL BE PROTECTED DURING CONSTRUCTION AND DEMOLITION ACTIVITIES AS REQUIRED BY SECTIONS 1501.6.1 THROUGH 1501.6.7 AND TABLE 1501.6.SIGNS SHALL BE PROVIDED TO DIRECT PEDESTRIAN
<br /> PEDESTRIANS: TRAFFIC
<br /> IEBC 1501.7-FACILITIES SANITARY FACILITIES SHALL BE PROVIDED DURING CONSTRUCTION OR DEMOLITION ACTIVITIES IN ACCORDANCE WITH THE UNIFORM PLUMBING CODE ISSUE:
<br /> REQUIRED: 04/01/24 BP PLAN SET
<br /> IEBC 1504.1-FIRE STRUCTURES UNDER CONSTRUCTION,ALTERATION OR DEMOLITION SHALL BE PROVIDED WITH NOT FEWER THAN ONE APPROVED PORTABLE FIRE EXTINGUISHER IN ACCORDANCE WITH IFC SECTION 906 OF THE
<br /> EXTINGUISHERS: INTERNATIONAL FIRE CODE
<br /> IEBC 1505.2-MAINTENANCE OF MEANS OF EGRESS AND REQUIRED ACCESSIBLE MEANS OF EGRESS SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION,DEMOLITION,REMODELING OR ALTERATIONS AND ADDITIONS TO ANY BUILDING
<br /> MEANS OF EGRESS:
<br /> IEBC 1508.1-CONSTRUCTION STRUCTURES,SITES,AND EQUIPMENT DIRECTLY ASSOCIATED WITH THE ACTUAL PROCESS OF CONSTRUCTION,INCLUDING BUT NOT LIMITED TO SCAFFOLDING,BRIDGING,MATERIAL HOISTS,MATERIAL STORAGE,OR
<br /> SITE ACCESSIBILITY: CONSTRUCTION TRAILERS ARE NOT REQUIRED TO BE ACCESSIBLE
<br /> GENERAL
<br /> IEBC 1509-WATER SUPPLY AN APPROVED WATER SUPPLY FOR FIRE PROTECTION,EITHER TEMPORARY OR PERMANENT,SHALL BE MADE AVAILABLE AS SOON AS COMBUSTIBLE MATERIAL ARRIVES ON THE SITE NOTES
<br /> FOR FIRE PROTECTION:
<br /> SHEET NO:
<br /> CS2