My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
906 SE EVERETT MALL WAY BASE FILE 2025-06-26
>
Address Records
>
SE EVERETT MALL WAY
>
906
>
BASE FILE
>
906 SE EVERETT MALL WAY BASE FILE 2025-06-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 8:25:13 AM
Creation date
1/24/2025 7:24:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
906
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: B2311-021 <br />Applied: 11/8/2023 <br />Issued: 1/16/2024 <br />Status: PERMIT ISSUED -PAPER <br />Parent Permit: <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:1/11/2024 <br />Finaled: <br />Description: TI INTERIOR COMMON AREA 1ST AND 2ND FLOORS OF <br />OFFICE B <br />Site Address: 906 SE EVERETT MALL WAY <br />City, State Zip Code: EVERETT, WA 98208-3744 <br />Applicant: WARE MALCOMB <br />Owner: PJP S LLC <br />Contractor: UNIMARK CONSTRUCTION LLC <br />Details: <br />NO CHANGE OF USE IS ANTICIPATED. INTERIOR CONSTRUCTION INCLUDES DEMO OF MINOR WALLS, GWB SOFFIT, ACT TILES AND <br />LIGHT FIXTURES AND INSTALLATION OF NEW WALL, CEILING, LIGHTS, WALL AND FLOOR FINISHES. <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />2/13/2024 <br />2/13/2024 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />NOT READY <br />eTRAKiT Inspection Request <br />Notes: <br />2/12/2024 7:02 AM Shea Tonkin <br />Contact Name: Shea Tonkin <br />Site Address: 330 120th Ave NE Suite 100 <br />Phone:2065108722 <br />e-Mail: sheat@skylineconstruction.build <br />Obtain all required Sub -permits for plumbing, electrical, mechanical, etc... <br />Must have rough -in / cover approval prior to scheduling for framing inspection. <br />Reschedule framing inspection when ready. <br />2/15/2024 <br />2/15/2024 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />NOT READY <br />eTRAKiT Inspection Request <br />Notes: <br />2/14/2024 11:14 AM Shea Tonkin <br />Contact Name: Shea Tonkin <br />Site Address: 906 SE EVERETT MALL WAY <br />Phone:2064233195 <br />e-Mail: sheat@skylineconstruction.build <br />Obtain all required Sub -permits for plumbing, electrical, mechanical, etc... Must have rough -in / cover approval prior to scheduling for building framing <br />inspection. <br />2/23/2024 <br />2/23/2024 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />PARTIAL <br />eTRAKiT Inspection Request <br />APPROVAL <br />Notes: <br />2/21/2024 8:27 AM Shea Tonkin <br />Contact Name: Shea Tonkin <br />Site Address: 906 SE EVERETT MALL WAY <br />Phone:2065108722 <br />e-Mail: sheat@skylineconstruction.build <br />I <br />Printed: Monday, 15 July, 2024 1 of 3 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.