Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />5/31/2024 <br />5/31/2024 <br />TEMP CERTIFICATE <br />Matt Schreifels <br />PARTIAL <br />60 Day T.C.O. <br />OF OCCUPANCY <br />APPROVAL <br />Notes: <br />5/24/2024 1:04 PM Shea Tonkin <br />RR Final <br />Contact Name: Josh Starkenburg <br />Site Address: 906 SE EVERETT MALL WAY <br />Phone:2064233195 <br />e-Mail: sheat@skylineconstruction.build <br />Pulled forward per contractors request from 6/3/24 to 5/31/24 & changed inspection type from Final to T.C.O. <br />60 Day T.C.O. <br />T.C.O. is for the 1st and 2nd floor restrooms only. <br />7/12/2024 <br />F7/12/2024 <br />BLDG 16-FINAL <br />RAKEEB KHAN <br />APPRVD-PERMIT <br />as noted <br />FINAL <br />Notes: <br />7/11/2024 2:19 AM Shea Tonkin <br />Contact Name: Shea Tonkin <br />Site Address: 906 SE EVERETT MALL WAY <br />Phone:2065108722 <br />e-Mail: sheat@skylineconstruction.build <br />Rescheduled from 7/15 to 7/12 <br />Common areas Ivl 1 and 2. Verified with office set of drawings. <br />7/15/2024 <br />CERTIFICATE OF <br />Permit Technician <br />OCCUPANCY <br />Notes: <br />I <br />Printed: Monday, 15 July, 2024 3 of 3 rk <br />SUPERION <br />