My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HWA Geosciences, Inc. 1/24/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HWA Geosciences, Inc. 1/24/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2025 10:11:48 AM
Creation date
1/24/2025 10:10:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HWA Geosciences, Inc.
Approval Date
1/24/2025
Council Approval Date
12/18/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Geotechnical Services for Riverpoint Outfall Replacements
Tracking Number
0004670
Total Compensation
$43,638.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
21312 30th Dr. SE, STE. 110, Bothell, WA 98021 | 425.774.0106 | hwageo.com <br />November 7, 2024 <br />HWA Project No. 2024-P272-21 <br />City of Everett Public Works Department <br />3200 Cedar St <br />Everett, Washington 98201 <br />Attention: Emily Coba, EIT <br />Subject: Geotechnical Engineering Scope of Work <br /> Riverpoint Outfall Replacement <br /> Everett, Washington <br /> <br />Dear Ms. Coba: <br />As requested, HWA GeoSciences Inc. (HWA) is pleased to present this proposed scope and <br />budget for geotechnical services associated with the Riverpoint Outfall Replacement Project in <br />Everett, Washington. This scope of work is based on our understanding of the project and our <br />conversations with the City. <br />GEOTECHNICAL SERVICES SCOPE <br />The proposed work will include the following tasks: <br />PROJECT MANAGEMENT: <br />• Project Setup: HWA will initiate the project and set up billing information in support of <br />invoicing throughout the project. <br />• Project Management: HWA will provide project management including <br />communications and coordination with the design team. HWA will provide task <br />management to all geotechnical related aspects of the project. HWA will correspond <br />with the design team in the form of meetings, emails, and telephone calls, as necessary. <br />• Invoice Generation and Processing: HWA will prepare monthly invoices, and progress <br />reports for the duration of the design phase of the project. <br />• Design Team Coordination Meetings: HWA will attend up to two (2) meetings, each 1 <br />hour in duration. Up to two geotechnical Consultant staff will attend each coordination <br />meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.