My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sam’s Tree Care 1/23/2025
>
Contracts
>
Agreement
>
Other Agreements
>
Sam’s Tree Care 1/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 12:36:36 PM
Creation date
1/24/2025 10:13:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sam’s Tree Care
Approval Date
1/23/2025
Council Approval Date
1/15/2025
End Date
6/30/2025
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
Chaplain Gap 2024 Snag Creation Project
Tracking Number
0004671
Total Compensation
$66,240.00
Contract Type
Agreement
Contract Subtype
Other Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Sam’s Tree Care 4/15/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Other Agreements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />TIMBER SNAG CREATION CONTRACT <br />THIS CONTRACT is dated and effective as of the date of last signature below and is by and <br />between the City of Everett, a Washington municipal corporation (the “City”), and the <br />Contractor shown below in the Basic Provisions. This Contract includes and incorporates the <br />Basic Provisions, the attached General Provisions, the attached Specifications, and the attached <br />Maps and Figures. <br />BASIC PROVISIONS <br />Project Name/ <br />WO Number Chaplain Gap 2024 Snag Creation / WO # 401-5-200124923410 <br />Contractor <br />Sampsa Wright DBA Sam's Tree Care <br />8204 21st Ave NE <br />Seattle, WA 98115 <br />sampsawright@gmail.com <br />City Contract <br />Administrator <br />Anna Thelen <br />City of Everett -- Public Works <br />3200 Cedar St. <br />Everett, WA 98201 <br />athelen@everettwa.gov <br />Project <br />The Contractor will furnish all labor, tools, materials, equipment, and <br />supplies required to complete all work as set forth in this Contract. The <br />entire work set forth in the Contract is referred to herein as either the <br />“Work” or the “Project.” <br />Contract Time <br />The Project shall be physically complete in all respects within 120 <br />calendar days from the date of issuance of a Notice to Proceed. The <br />Contractor shall not start the Work until receipt of Notice to Proceed <br />from the City. If a purchase order is issued for the Work, it is only a <br />Notice to Proceed. The purchase order’s pre-printed terms and <br />conditions are not part of the Contract <br />Contract Price <br />The amount of this Contract is the Contract Price, which is $66,240.00. <br />The basis for final payment will be the actual amount of Work <br />performed in accordance with the Contract. In no event shall the total <br />amount paid to Contractor exceed the Contract Price unless the <br />Contract amount has been increased by one or more change orders <br />signed by the City.
The URL can be used to link to this page
Your browser does not support the video tag.