Laserfiche WebLink
ABBREVIATIONS: ARCHITECTURAL DRAWING INDEX <br /> f <br /> - Isr. Al COVER SWEET g o o v <br /> ADJ. ADJUSTABLE RR. HOUR PCN PLAN CHANCE NOTICE WRITE-U <br /> we AIR CONDITION HYD. HYDRANT A2A FONT/SIDE - 'A' ELEVATION LL o <br /> ALT. ALTERNATE IN. INCH A3A REAR/SIDE - 'Al ELEVATION <br /> A,B. ANCHOR BOLT INCL. INCLUDE(ED)(ING) o ' A28 FRONT SIDE - 'B' ELE ATON ABV, ABOVE INSUL. INSULATEfffo <br /> A.F.F. ABOVE FINISHED FLOOR INr. INTERIOR A3 REAR/SIDE - ELEVATION �. - - <br /> ARCH. ARCHITECTURAL KIT, KITCHENFM7 HO A A4 MAIN FLOR PLAN ^' g <br /> 0— <br /> AUTO. AUTOMATIC An. LAMINATE A5 UPPER FLOOR PLAN z <br /> A5PH. ASPHALT IAV. LAVATORY - <br /> ., A6A FRAMINGPLANS: ARCHITECTURALINFO.: 'A' ELEV. 4 <br /> BM. BEAM IAUN. LAUNDRY <br /> BRA. BEARING LVR. LOWER He., A6B FRAMINGPLANS: ARCHITECTURAL INFO.: 'B' ELEV. <br /> BET, BETWEFUI LTG. LIGHTING ---- / A7 ELECTRICAL PLANS €v`= a E$s "s <br /> /w' S ABA GARAGE OPTIONS - A ELEVATION <br /> °� <br /> B.L. BUILDING LINE LT. LIGHT QO IV <br /> — �BLK. BLOCK MB. MACHINE BOLT A8B ARA EOPTIONS - 'B' ELE ATION <br /> BD. BLOCKING MFR. MASOFACTURE(R) �� ` Aq ARCHITECTURAL DETAILS <br /> El <br /> BD. BOARD MAS. MASONRY �Q <br /> Bar. BOTTOM MO. MASONRY OPENING _:.: AIO WATER INT U51ON DETAILS <br /> BLDG. BUILDING MATL. MATERIAL [=1:'� y� All WSEC OPTIONS$ CALCS A' <br /> o <br /> CAB. CABINET MAX. MAXIMUM <br /> 1 Pacific Ridge Seri W s =OPT. CARPET MEOW. MECHANIC(AL) A ELEVATION <br /> CLG. CEILING ne0. MEDIUM -- 501 STRUCTURAL NOTES 'A' ELEV. B z <br /> CLG.HT. C CEILING HEIGHT MEMB. MEMBRANE _ <br /> OEM. EMENT MTL. METAL <br /> 502A FOUNDATION PLAN - o y <br /> CTR. CENTER MIR. MIRROR — 502B FOUNDATION PLAN - ' ELEV, <br /> C.T. CERAMIC TILE misc. M15CELLANEWS � =i <br /> CLR. CLEAR(AWE) MIN. MINIMUM i 3 c m a <br /> 502JA FNDN FLAN - ARA E OPT s - 'A' ELEV. <br /> FLAN N A�1 502.IB FNDN LAN - GARAGEOPT' - 13 E EV LL <br /> COL. CLOSET N.T. MOLDING 502A M FNDN LAN MIRRORED - 'A' LE . ^'COL. COLUMN N.T.S. NOT TO SCALE <br /> CONC. CONCRETE(CAST-IN-PLACE) OFF. OFFICE o - 50 B M FNDN PLAN MIRRORED - 'B' KLEV. <br /> COMB, COMBUSTION O.G. ON RENTER I I O N I I r�n S02.IA M FNDN PLAN MIRRORED - GARAGE 01 - 'A' ELEV. Q o W 3 3 '• o <br /> CON CONCRETE MASONRY UNIT O.H. OVER HEAD U Inl U FIB) 502.IB M FNDN PLAN MIRRORED - GARAGE0 's - 'B' ELEV. z <br /> CONEY. CONSTRUCTION O.H.G. OVER HEAD CABINET 503A MAIN FLOOR FRAMING - 'A' EL v <br /> LONT. CONTINUOUS OR CONTINUE O.H.D. OVER HEAD DOOR w > 3 <br /> CJT. CONTROL JOINT OPG. OPENING 503B MAIN FLOOR FRAMING - 'B' o a <br /> L.W. COLD WATER . OPTION,OPTIONAL {/.h.\), 1 I av 01 <br /> CORK CORRIDOR / 1/ ELEVATION S03A M MAIN FL. F AMIN PLAN MIRRORED - 'A' ELEV. o <br /> —= 503 M MAIN L. FRAMING PLAN MIRRORED - ELEV. <br /> CLR. CIRCLE PIC PICTURE WINDOW <br /> CLKG CAULKING PNL. PANEL _ 503A MAIN FLOOR FRAMING - 'A' ELEV. z <br /> G.J. CEILING J015T P.BD. PARTICLE BOARD 1711 - 503E MAIN FLOOR FRAMING - 'B' ELEV. <br /> CSMT CASEMENT WINDOW PL, PLATE w" 503A M MAIN FL. FRAMINGPLAN MIRRORED - 'A' ELEV. H O <br /> DET. DETAIL PLi4D. PLYWOOD -- vA I W <br /> Y �� ', t e 6 50313 M MAIN L. FRAMINGPLAN MIRRORED - B' ELEV. 1 1 <br /> DIAG. DIAGONAL PVC. POLYVINYL CHLORIDE <br /> DIM. DIMENSION P.LI �TMEUNSEGUARE INCH xf, 5O4A UPPER FLOOR FRAMING - 'A' ELEV, IJ-I 1� <br /> DIA. DIAMETER P.S.F. POUNDS PER SQUARE FOOT <br /> Nr 4)Y V'i <br /> OF. DIFFUSER . FOUNDS <br /> s `, a:^I 504E UPPER FLOOR FRAMING - 'B' ELEV. W "� <br /> I ',, 5041A UPPER FL. FRAMINGPLAN - GARAGE 0 T's - 'A' ELEV. L� <br /> DISP. DISPENSER PR, PAIR B ELEVATION . ._ - .,, >.I a'. .. �hY: 5O4.I8 UPPER FL. FRAMING PLAN - GARAGE OPT's - IS' ELEV <br /> DR, DOOR RED. RADIUS 504A M pH. DISHWASHER REP. REFERENCE UPPER FL. FRAMING PLAN MIRRORED - 'A' ELEV. �--I--I <br /> _� <br /> DOOR DRAWER REINF. REINFORCE(D)(ING) --- <br /> 504E M UPPER FL. FRAMING PLAN MIRRORED - 'B' ELEV. U z <br /> DwG. DRAWING RM. ROOM —__. 504.IA M UPPER FL. FRAMING MIRRORED - GARAGE 01 - 'A' ELEV, O <br /> ON. DIVISION R.O. ROUGH OPENING PRH INTERNAL PLAN !AMING LEGEND SQUARE FOOTAGE COUNTS PLAN DETAILS PLUMBING MECH. INFO 504.IB M UPPER FL. FRAMING MIRRORED - GARAGE OPT's - V ELEV. o <br /> ON. DOWN SOH. HEFTSCHEDULE ____ ) ( 505A ROOF FRAMIN - 'A' ELEV, <br /> D5. DOWNSPOUT SHY. SHEET <br /> ELEc. ELECTRICAL sIM. SIMILARBLDG TYPE: SINGLE FAMILY <br /> R 505B ROOF FRAMIN - '8' ELEV. v _ <br /> HEATED SPACE SF: <br /> E4. Ena S.C. SOLID CORE 505A M ROOF FRAMIN MIRRORED - 'A' ELEV. cn <br /> E0. EQUAL 5.G.(a SG)SAFETY(TEMPERED)GLASS PLAN NAME LETTERS: FINISHED BASEMENT SF: N/A MAX.EI DIMENSIONS(INC.3RD GAR GARAGE): 3V WIDE K 44.5'DEEP S058 M 00 F MIN MI R - ' <br /> CQ <br /> EQUIP. EQUIPMENT SGD SLIDING GLASS DOOR <br /> W. EXHAUST 5GL. SINGLE FINISHED FLOOR I(MAIN FLOOR)SF: 851 MAX.NUMBER OF BEDROOMS: 4 506 STRUCTURAL DETAILS <br /> EXIST. EXISTING SPEC SPECIFICATION —---- - FINISHED FLOOR 2(UPPER FLOOR)SF 507 STRUCTURAL DETAILS <br /> 1251 EXHAUST FANS: 5 508 STRUCTURAL DETAILS <br /> EXT. E%TERIOR 50. SQUARE <br /> FIN. FINISH STD. STANDARD FOUNDATION TYPE: TOTAL HEATED SF: GAS PIPING CONNECTIONS: 5 509 STRUCTURAL DETAILS <br /> RR FLOOR STL. STEEL F = FLAT (2-STORY, 3-STORY TALL CRAWL) <br /> F.D. FLOOR DRAIN STOR. STORAGE D = "DAYLIGHT" BASEMENT HEATED/UNHEATED SPACE SF: NEAT SOURCE: ELECTRIC OV U <br /> F.B. FLOOR BREAK STRUCT. STRUCTURAL NEAT TYPE: NEAT PUMP <br /> T = "TUCK-UNDER" GARAGE FINISHEDBASEMENTSF: WA DESIGNER BUILDER SY ERETT P`°"N15OWNms:PTMAc1IFIC <br /> FLUOR. FLUORESCENT Sim. SIMILAR OF EV <br /> FT. FOOT STS. SYSTEM Permit Servic g RIDGE HOMES.USE OF THIS <br /> NUMBER OF NEAT UNITS: I <br /> FTG. FOOTING SHTG. SHEATING FINISHED FLOOR I(MAIN FLOOR)SF: 861 MAN Is PROHIBITED BY LAW <br /> FIND, FOUNDATION TEL. TELEPHONE LAST NUMBER OF CODE CYCLE (EAR: ® FIREPLACE TIDE: ZERO CLEARANCE-GAS PACIFIC RIDGE HOMES LICENS FEE TO PACIFIC <br /> LICENSE FEE TO PACIFIC <br /> FURR. FURRED(ING) T.Y. TELEVISION FINISHED FLOOR 2(UPPER FLOOR)SF: 1251 RIDGE HOMES. <br /> (2018 2021r ETC.) BATHROOM SINKS. 4 ATKIN <br /> FUT. FUTURE TEMP. TEMPERED � ARCHITECTURAL PLANS t PERMIT COORDINATOR <br /> FR. FRENCH THRES, THRESHOLD GARAGE OPT.I(WITHIN BLDG FOOTPRINT): 430 ARCHITECTURAL <br /> BATHTUB OR CO'1B0's: I jwatkirl@pacificridgehomes.com D PLAN SUMMARY <br /> F.A.U. FORCED AIR UNIT TKa TONGUE AND GROOVE GARAGE OPT.2 <br /> F.O.S. FACE OF STUD T.O.S. TOP OF SLAB OCT 1 U 2023 N/A <br /> (uV six^70'GARAGE EXTENSION(BUMP-OUT): 540 CLOTHES WASHERS: I 17921 BOTNELL-EVERETT HIGHWAY SUITE 100 <br /> F.G. FINISH GRADE T.O.P. TOP OF PLATE BOTHELL WA 06012 <br /> DISHWASHER: PHONE: (425)438-8444 CITY EVEI2ET 851 <br /> F,S. FREE STANDING TYP. TYPICAL GARAGE OPT.3(w/10'x"20' I Q]7 <br /> F.J. FLOOR JOIST TEM. TOP OF BEAM () ) 650 0 Permit Services b„ <br /> I ONE GAR GARAGE BAY); __ <br /> FLOOR DRAINS: 1251 <br /> G.A. GAUGE U.N.TPL UNLTOP PLATE CODE REFERENCES COVERED BACK PATIO OR DECK SF: WA <br /> GALV. GALVANIZED U.N.O. UNLESS NOTED OTHERWISE KITCHEN SINKS: I <br /> G.C. GENERAL CONTRACTOR VEST. VESTIBULE COVERED FRONT PORCH SF: 14 2102 <br /> GL. GLASS, GLAZING VYL VINYL COMPOSITION TILE INTERNATIONAL RESIDENTIAL CODE:2016 LAUNDRY SINKS: 0 STRUCTURAL ENGINEER <br /> GL.BLK. GLASS BLOCK V.I.F. VERIFY IN FIELD TOTAL HEATED 1 UNHEATED SF: 2102!GARAGE OPT.I) SHOWER STALLS SHOWER PANS: 430 <br /> GYP.BD. GYPSUM BOARD W.C. WATER CL05ET INTERNATIONAL MECHANICAL CODE: 2018 ( ) I BTL ENGINEERING <br /> GYP, GYPSUM HP, WATER PROOFING 2212(GARAGE OPT.2) xE ECT <br /> 6.1. GALVANIZED IRON x✓ WITH TOILETS: 3 NO INVILL VILLE SNOHOMISH ROAD NE SUITE APPROVED a -ELECTRIC <br /> INTERNATIONAL FIRE CODE: 2018 <br /> 2232(GARAGE OPT.3) WOODINVILLE WA 98072 Otliceo omPLA PLANNING DEPARTMENT <br /> DevelD men <br /> GwB. GYPSUM BOARD WIN. WINDOW WATER NEATER: PLANNING DEPARTMENT <br /> HOW. HARDWARE Iwo WITHOUT UNIFORMED PLUMBING CODE: 2018 ELECTRIC (q25)814-8448 JINIA <br /> PHONE: <br /> NOR. HEADER IND. WOOD WATER SERVICE LINES: I BTL ENGINEERING <br /> N.VA.C. HEATINGNENTING/ QUID WASHER AND DRYER WASF NGTON STATE ENERGY LADE: 2018 N.m.kosLn — <br /> AIR CONDITIONING W.I. WRQUGHT IRON - REVISION REV # DATE SEE REVISION LOG <br /> HT.(HGT.) HEIGHT W.H. WATER HEATER raecu wlc v.xa. <br /> H.C. HOLLOW CORE W.R.G.B. WATER RESISTANT i,idditlomill Permits Are Required 2018 IRC$WSEC UPDATES 0.00 03/2q/2021 SCALE:Y" <br /> H.M. HOLLOW METAL HIRE SHELF <br /> BOARD <br /> For This Project TO I clude: ADDED ADDITIONAL TREAD/RISER AT UPPER FLOOR 100 0/08/2021 <br /> HORIZ. HOSE BIBAL w/s WIRE SHELF 4rinkler ADDED MINI-SPLIT LOCATIONS 2.00 10/13/2022 <br /> H.B. HOSE BIBB Special Inspections Required Plumbing C7 <br /> See Sheet SO1 Mechanical ❑Fire Alarm BATH I VANITY S SHOWER OPENINGS 3.00 01/II/2023 COVER <br /> ADDED 220v OUTLET IN MAIN FLOOR SHEET <br /> Electricai THIS SET OF' CLOSET FOR TEMP NEAT 4,00 01/31/2023 <br /> DRAWINGS SHALL SIDING RE-DESIGN: 'B' ELEV., EXTENDED FRONT <br /> THESE DOCUMENTS HAVE NOT BEEN BE ON JOB SITE PORCH OPTION ONLY 5.00 03/01/2023 <br /> APPROVED FOR THE ISSUANCE OF AT ALL TIME5. ADDED A WALL NEATER TO BATH I 5.00 04/13/2023 <br /> PUBLIC WORKS,MECHANICAL,FIRE <br /> SLUMS S'IPN ELE TRICALOR <br /> s- <br />