Laserfiche WebLink
S <br /> N E ru <br /> 2 <br /> >3 u, <br /> Q < JJ <br /> a 2= <br /> — O t- <br /> _- m m— ry <br /> —__ <br /> y 1H5 awl sue°4R� r <br /> i -- ENO <br /> I I <br /> 112 <br /> I ': I 111s°T I { <br /> � LL <br /> I I I <br /> W l <br /> �Ip <br /> I I I = <br /> I I I I <br /> �I <br /> �I <br /> •- jl��o F ASNi4'. <br /> I I <br /> II <br /> I I I <br /> s o^ I I <br /> I COH <br /> Ll. <br /> --- _ <br /> 6 z'-D., W <br /> W <br /> -- ----, <br /> -------- = Q <br /> P1_6 -- <br /> I <br /> I I I 7 U <br /> I I - I L <br /> I I I I <br /> F- <br /> 1I I I Q <br /> 1 - ALL FRAMING OR HAn' IARE Q <br /> S07 NOT SHOWN OR HA IED SOT ANOT SHOLL ING OR WN OR SPECIFIEDHARDWARE <br /> LLJ <br /> W <br /> TO REMAIN UNCHAI cc° I TO REMAIN UNCHANGED <br /> I I II <br /> I I <br /> I I I I <br /> I I I I <br /> I I i I <br /> W <br /> z W <br /> — 6"x 12"THICK - 3 - O W <br /> ' FOOTING Wl N4 Q 1O'oc I I SOT 5 0"x2'-6"x12"THICK FOUNDATION PLAN NOTES' <br /> ' r , FOOTING W(#4((f?10"OC 1. la n- ra a s a be t la she]]be poured bver�ree Oran ng Granular per eotechn'cal eport. ee Ar tecturel <br /> L—— F.A.WAY,BOTTOM I L_—— — — —J Draw ngs far Slab Elevat on Depression,and Slope requirements remenls._ EA.WAY.BOTTOM---- — -- <br /> ' <br /> I 2. Construction/tely square <br /> a Joint m Slabs area onal but recommended to control craGung.When used slab areas between jo sts shall <br /> L De approximately square and 400 5f or less Q� Z. —————— ——— PProwmatel <br /> m Z <br /> �`— - 3 The Contractor shall defend ne actual loading b elevations based on foal grades and site gpndNons.Bottom of Footings shall be set ^ Z <br /> on competent,properly graded bearing$0l below Frost Depth. LL O <br /> L —J r——Pi-6 4_ Anchor Bolts for Exterior Stud Walls shall be in accordance with P1-6 of the Shear Wall Schedule of 1ISO6 .o,u .n. <br /> —J O <br /> 10 5. See 10/S06 for Simpson to USP hardware conversion table1-0" . V <br /> EXTENDED GARAGE OPTION-ELEV.'B' U <br /> 3-CAR GARAGE OPTION-ELEV.'B' <br /> LEGEND <br /> Xx <br /> DETAIL CALL-OUT <br /> P1- ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 11SO6 <br /> SLAB-N-GRADE PER PLAN NOTE i <br /> L�J FOUNDATION WALL <br /> m <br /> F <br /> RAISED FOUNDATION WALL � <br /> K <br /> BEARING OR SHEAR WAIL ABOVE ti <br /> CRAWL SPACE POST BELOW O <br /> OFOOTINGCALL-OUTSEES/SOT W o <br /> X <br /> STEP STEP TOP OF STEM WALL <br /> 0 1 2 4 8 16 SUA B(M) <br />