Laserfiche WebLink
G <br /> r•v <br /> 0 <br /> 74 <br /> W <br /> Z <br /> LD d =G <br /> �Z <br /> w= <br /> a <br /> Uo = w n <br /> LL } w <br /> U <br /> a ww <br /> SLAB-ON-GRADE m m <br /> STOOP <br /> r — ——— --- ---- — -------� <br /> STUB OUT <br /> IS PLACBAR ES) <br /> PLACES) <br /> I I <br /> 1 �je <br /> I I iso7 z a <br /> TYR W <br /> I <br /> . O" 4'-3Y" T. <br /> TYP 4'-3" 5'4Yd" 8'-," fi'-0" 2-�•. <br /> of ^aer <br /> a <br /> S07 Gj on, f <br /> s a za za s <br /> r � r <br /> I I I ® II I <br /> L—J L-tJ L—J - J L—J L—J <br /> _ W — <br /> ® I I ® I I ® I LL � <br /> W <br /> --- --- -- --- <br /> 4 J Q <br /> r- T <br /> --7 g �10'-4y2 <br /> s-1Yz" FIR O <br /> I I I <br /> I I I <br /> I f ----1 <br /> LL <br /> ® ® I I ® I I ® II i I I <br /> ISLAB-ON-GRADEI L _J I PER PLAN NOTE 1ALL FRAMING Ok HAkDWHkE -0S-% 4'-1%j' 2'-0 (ELEV VARIES) i -- <br /> NOT SNOWN OR SPECIFIED N •I I <br /> TO REMAIN UNCHANGED 4 1-041, - <br /> m H eo <br /> J W <br /> STUB OUT <br /> 'rEP I STUB OUT <br /> REBAR — T SEP <br /> _ —� ` REBAR 18" <br /> (3 PLACES) --- _�- (3 PLACES) ——— O W <br /> r FOUNDATION PLAN NOTES LL <br /> STEP q EP I I W 3 i .bran rode shall e 4 th ck Slab shall be poured over Free brain ng Granular Fill per Geotechn cal�ea Arcintectural <br /> L——— ——J I I a ATTACH 2x PORCH WALLS S07 Drawings for Slab Elevation Depression and Slope regdrements Z } <br /> --.---t —_- - —— IL.- L STEP I L P PORCH SLAB—— —— J 2 e ipt onal but recommended to control cracking.vVhen used sWo areas between joists shell <br /> wwwl DIRECTLY TO <br /> ,•i — ______ ER -------- ----- — be appmx�mately equacre and a100 e(or Is... U <br /> J <br /> ?p ———— 3 The Cunt actor shall determ ne actual fooling elevations based on final grades and site cendlllans.Bohm of Footings shall be set z /'� Z <br /> 0 Ll.on competent properly graded bearing soil below Frost Depth. O <br /> a. Anchor Bolts for Exter or Stud Walls shall ben accordance with P1-6 of the Shear Wall Schedule of US06,u.o.n. F- <br /> _ CL SLAB-ON-GRADE — O <br /> 2 9 p J PORCH 2 9 <br /> SLAB-ON-GRADE 5. Sae 10/S06 for Simpson to USP hardware conversion table. U <br /> ATTACH 2.PORCH WALLS HD i PORCH <br /> ——— ————— DIRECTLY TO PORCH SLAB <br /> 4'4Y" S07 REFER TO ARCH'L SECTION LEGEND <br /> 7'-10Y2 PER 121S07 03814 FOR FRONT PORCH <br /> _— <br /> 1 5'-7Y" 6'-8" <br /> --REFER 1"0 ARCH'L SECTION FOUNDATION CONSTRUCTION <br /> D38/4 FOR FRONT PORCH 15'-3" 1'-SYi' SX C DETAIL CALL-OUT <br /> 2-1 OYz - B'-5' FOUNDATION CONSTRUGTIGiv <br /> 1'5y' <br /> ANCHOR BOLTS FOR SFIEAR WALL ABOVE PER SCHEDULE OF 1/SO6 <br /> k <br /> EXTENDEDNT PORCH OPTION-ELEV.'A' <br /> SLAB-ON-GRADE PER PLAN NOTE, <br /> r---, m <br /> --- ---- � FOUNDATION WALL � <br /> 0 RAISED FOUNDATION WALL 'M <br /> lr <br /> W <br /> I BEARING OR SHEAR WALL ABOVE a <br /> aC <br /> CRAWL SPACE POST BELOW � <br /> O FOOTING CALL-OUT SEE 5/S07 J o <br /> K <br /> STEP STEP TOP OF STEM WALL <br /> 0 1 2 a 8 16 S02A <br /> va"=r-a• <br />