Laserfiche WebLink
0 <br /> LU <br /> "0 <br /> 0=N'-,-D E 0 <br /> ————————— — ————— <br /> -————————---- U <br /> STUB OUT 4 <br /> REBAR 18" <br /> 13 PLACES) <br /> in. <br /> TYP <br /> 2'- T. <br /> '2'0­,— -6-0' -4y, 4`-3X,' <br /> s <br /> c� <br /> %! T <br /> —7­1 rnj U_ <br /> ig LU <br /> LL _j <br /> ———————----- <br /> N, <br /> CD <br /> 2 <br /> W <br /> 0 <br /> SLAB-ON _OWGRADE w CE2 <br /> PER PLAN NOTE I <br /> (ELEV VARIES) <br /> ALL FRAMING OR HARDWARE <br /> NOT S WNORSPECIFIED <br /> M V-04" TO REMAIN UNCHANGED <br /> W <br /> JB OUT STUB OUT <br /> bTEv STEP 3AR 18" REBAR 18" Z W <br /> LACES) (3 LACES) > <br /> 1 0 W <br /> FOUNDATION PLAN NOTES, U_ <br /> STEP i 9 STEP 1. lab—Grade that be 4"An $as AcIriftectiaral z 0 <br /> ATTACH 1,PORCH WALLS L I Drawings for Slab Elehmtj n Depression.and Slope requirement,. <br /> E—L I < <br /> DIRECTLY TO PORCH SLAB ST <br /> PER 12JS07 2 C..tructi.,VC-thol Joint in Slabs am optional but recommended to control cracking.When used slab areas between pate shall <br /> I 1 b..pp..i..t�ly�qu.,..�d40G.�f.,L�.. 0 _5 <br /> 7———T- <br /> ----------- A -----------j _j <br /> - _ I - Z <nT o _————————— - � SAS- ST 3. The ConVactor shall Oetern na actual fpotin level ohs basetl on foal d.s antl slte conditions 8otton of Footin <br /> on competent,properly graded been soil below Frost Dept <br /> lid 4. Anchor Bolts to,Extend,Stud Walls 1.11 be accordance with P1�,f the Shear Well Schedule of VS06,u.o.n, <br /> 5. Sea 10S06 for Simpson to USP hardware conversion table 0 <br /> SLAB-ON-GRACE 2'-9"—, <br /> PORCH 1, <br /> — / C Sol -1 - ATTACH 2x PORCH WALLS LL <br /> ❑ <br /> REFER TOARCHL SECTION— "r?-XF DIRECTLY TO PORCH LAB LEGEND <br /> 2———— 121 1`10y <br /> PER 'S., <br /> 038/4 FOR FRONT PORCH 12 <br /> 1`5y2" FOUNDATION CONSTRUCTION REFER TO ARCH'L SECTION IDITAIL CAU­.UT <br /> FOUNDATION CONSTRUCTION <br /> 038/4 FOR FRONT PORCH <br /> OY2. <br /> FP_1__x I ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF VS06 <br /> EXTENDED FRONT PORCH OPTION-ELEV.'A' SLAB-ON-GRADE PER P-11 NOTE 1 <br /> FOUNDATION WALL <br /> RAISED FOUNDATION WALL <br /> BEARING OR SHEAR WALL ABOVE <br /> C.SPACE POST BELOW <br /> O <br /> XX FOOTING CALL-OUT SEE!iS.1 <br /> STEP STEP TOP OF STEM WALL <br /> 0 1 2 4 3 16 S02A(M) <br />