Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2310-030 Description: NEW SFR-REF RB2306-005--UNIT Q <br /> Applied: 10/10/2023 Approved: 11/22/2023 Site Address: 9502 18TH AVE W UNIT Q <br /> Issued: 11/28/2023 Finaled: City,State Zip Code: EVERETT,WA 98201 <br /> Status: PERMIT ISSUED-PAPER Applicant: RHONDA CLANCY <br /> Parent Permit: RB2306-005 Owner: PACIFIC RIDGE-DRH LLC <br /> Parent Project: Contractor: PACIFIC RIDGE-DRH LLC <br /> Details: <br /> "PLANNING INSPECTION DUE BEFORE BUILDING FINAL" <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 12/14/2023 12/14/2023 BLDG 02- Matt Schreifels PARTIAL eTRAKiT Inspection Request <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> 12/13/2023 9:28 AM PACIFIC RIDGE-DRH LLC <br /> Contact Name:PACIFIC RIDGE-DRH LLC <br /> Site Address:9502 18TH AVE W UNIT Q <br /> Phone:4254382945 <br /> e-Mail:Swwiper@drhorton.com <br /> Foundation footing ok to pour.Pier pad footings to be inspected prior to pouring concrete. <br /> 12/14/2023 12/14/2023 BLDG 04-UFER Matt Schreifels APPROVAL <br /> GROUND <br /> Notes: <br /> 12/18/2023 12/18/2023 BLDG 03- Matt Schreifels PARTIAL eTRAKiT Inspection Request <br /> FOUNDATION WALL APPROVAL <br /> Notes: <br /> 12/15/2023 3:06 PM PACIFIC RIDGE-DRH LLC <br /> Contact Name:PACIFIC RIDGE-DRH LLC <br /> Site Address:9502 18TH AVE W UNIT Q <br /> Phone:4254382945 <br /> e-Mail:Swwiper@drhorton.com <br /> Pulled forward from 12/19/23 to 12/18/23 per contractor request. <br /> Foundation walls ok to pour.Need pier pad footing locations and rebar installed prior to pouring concrete for the pier pad footings. <br /> I <br /> Printed:Wednesday,01 May, 2024 1 of 4 rk <br /> SUPERION <br />