Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT OFFICE USE ONLY <br /> WASHINGTON Permit Services Transmittal b %0 <br /> VVE [ <br /> PERMIT/PROJECT#: B2310-047 OCT 2 3 2023 <br /> SITE ADDRESS: 9502 18TH Ave W Unit H CITY OF EVERETT <br /> PROJECT NAME: Harrison Pointe Permit Services <br /> FROM: Rhonda Clancy COMPANY:Pacific Ridqe Homes-DRH ❑Chronology—Permit Counter Transmittal <br /> PHONE#: 425.939.1164 EMAIL: RLClancy(@drhorton.com ❑Plan Review Routing <br /> Location: ❑File []Reviewer Office <br /> Date Logged: By: <br /> J <br /> te to: (Check all that apply) Name of Reviewer Type of Review <br /> Planning Reviewer Name:Dennis Osborn ❑ Re-Review <br /> Public Works Reviewer Name: Revisions After Approval <br /> Building Reviewer Name: ❑ Revisions After Issuance <br /> ❑ Fire Reviewer Name: ❑ Other <br /> ❑ Other Reviewer Name: I ❑ Other <br /> Provide quantities for all items submitted <br /> PLANS REPORTS/CALCULATIONS OTHER DOCUMENTS <br /> Qty Qty Qty <br /> Architectural/Building Plans _ Geotechnical Report 2 Correction Letter Responses <br /> Structural Plans — Drainage Report Draft Easement <br /> Civil Plans _ SWPPP Report _ Recorded Easement <br /> Site Plan _ Wetland Report _ Height Survey <br /> Landscape Plan _ Critical Area Report _ Base Elevation Survey <br /> Survey _ Traffic Study/TDM Report Critical Area Covenant <br /> Elevations _ Structural Calculations _ Stormwater Covenant <br /> Floor Plans Height Calculations Covenant-Other <br /> Special Inspection Report _ Plumbing Calculations Performance Guarantee <br /> As-Builts _ Other Warranty Bond <br /> Plat Maps _ Other Other <br /> Original City Redlines Returned _ Other Other <br /> Other Other <br /> Other <br /> Other Other <br /> Other <br /> Items submitted are: <br /> ❑Complete Plan Set Replacement ✓❑Additional Documents <br /> (Slip-sheeting not permitted) (To be added to file) <br /> Comments to Reviewer: FOR CHANGES IN SCOPE: <br /> Updated addresses, added elevations, Revised Description of Work: <br /> updated max allowed elevation, added <br /> hightest point of sidewalk,added <br /> FFE+SG+0.5'+FFE Elev, added actual elev <br /> each unit, added, struc. height each unit Revised Valuation: <br /> Signed: �� Date: 10.20.2023 <br />