Laserfiche WebLink
AIR BARRIER REQUIREMENT <br /> • !'�1 -s'; PER 2018 WASHINGTON STATE ENERGY CODE R402.4 A CONTINUOUS AIR BARRIER <br /> SHALL BE INSTALLED IN THE BUILDING ENVELOPE.EXTERIOR THERMAL ENVELOPE <br /> CONTAINS A CONTINUOUS AIR BARRIER.BREAKS OR JOINTS IN THE AIR BARRIER SHALL <br /> BE SEALED.AIR PERMEABLE INSULATION SHALL NOT BE USED AS AS A SEALING <br /> MATERIAL. ¢`; <br /> PROVIDE BUILDING AIR LEAKAGE TESTING WITH APPROVED BLOWER DOOR PER <br /> CEILING G.W.B.TAPED TO WALL INFORMATION BELOW.SUBMIT TESTING RESULTS TO JURISDICTION FOR APPROVAL. — <br /> G.W.B. � ^_ <br /> Q <br /> OFDOOR&WINDIOW ER BLOWER DOOR TEST �' s <br /> OPENINGS m <br /> II 2018 Washington State Energy Cade(WSEC)section R402.4.1.2 requires air leakage testing for <br /> SEAL G.W.B.TO TOP I I SEAL G.W.B.PERIMETER all new houses and additions.The requirement is met if the structure has a leakage rate of 5 air <br /> PLATE AT ALL EXTERIOR OF DOOR&WINDOW changes per hour when depressurized with a blower door to 50 Pascals or leas(5ACH50).A <br /> WALLS I I OPENINGS Pascal is a measurement of pressure.249 Pascals are equal to 1"of water column.The test must <br /> G.W.B.CAULKED TO TOP PLATE I I be performed using a Blower Door device which consists of a large fan,a frame and panel.A u,m <br /> Imanometer(pressure gauge)is used to read house and fan pressures. <br /> SHADED / I (I I WSEC states that the test may be performed at any time after rough in.Al penetrations in the <br /> COMPONENTS building envelope must be sealed including those for utilities,plumbing,electrical,ventilation and <br /> INDICATE ELEMENTS I I combustion appliances.The code also states that when required by the building official,the[es[ <br /> COMPRISING THE I I I I shall be conducted by an approved third party. a -= <br /> CONTINUOUS AIR To conduct the test: a� <br /> BARRIER ENCLOSURE / 1.Close all rsdows doors and fireplace and stove doom. <br /> I i I I 2.Clos Windows <br /> flue dampers <br /> e all dampe includ ng exhaust intake make-up air,back raft and <br /> If I i I Since you will be depressunzmg the house dampers n bath <br /> G.W.B.CAULKED TO BOTTOM FUATE <br /> Ifans,etc will be sucked closed during the test and will therefore not <br /> negatively affect the results. <br /> BOTTOM PLATE CAULKED OR GASKETED I I I I 3.Make sure plumbing traps are filled with water. <br /> TO SUBFLOOR/CONCRETE SLAB AT 4.Leave doors between heated areas open. <br /> SLAB ON GRADE CONDITIONS I I I 5.Open access I hatches to conditioned attics and/or conditioned crawl spaces.Leave hatches closed if these are unconditioned areas. <br /> 6.Seal exterior openings for continuously operating ventilation systems and <br /> RIM JOIST CAULKED,GLUED OR / I heat recovery ventilators. <br /> GASKETED TO SUBFLOOR / I 7.Tum off heating and cooling systems but do not seal supply or return <br /> registers. <br /> / I 8.Adjust all combustion appliances so that they do not turn on during the <br /> test. <br /> / I I Best. <br /> the blower door in an exterior door opening and connect hoses from <br /> RIM JOIST CAULKED,GLUED OR the <br /> GASKETED 70 TOP PLATE m manometer to the blower door fan and the exterior pressure tap.See <br /> me <br /> instructions for correct set-up. <br /> / I SEAL G.W.B.TO FIRST 10.Depressurize the house to-50 Pascals. <br /> SEAL G.W.B.TO TOP STUD AT INTERIOR 11.Record the flow rate(with simple manometers,the fan pressure(Pa)is <br /> G.W.B.CAULKED TO TOP PLATE / PLATE WHEN ADJACENT I PARTIITIONS converted to.CFMso using a flow table.Many digital manometers sold with <br /> TO UNCONDITIONED I blower doors can automatically perform this conversion,and display rY <br /> / ATTIC CFMso directly.)Consult your blower floor and manometer manuals. L.L <br /> // I You now must convert the flow rate(CFMa,)to ACHso. w <br /> / I Use the following formula: <br /> ACH5o=(CFMsoX60)/Volume Q <br /> SEAL G.W.B.TO SILL Where m <br /> PLATE AT ALL EXTERIOR ACH so=Air Changes per Hour at-50 Pascals <br /> G.W.B.CAULKED TO BOTTOM PLATE WALLS SEAL ALONG INSIDE OF CFMw X60=Converts Cubic Feet per Minute to Cubic Feet per <br /> BOTTOM OF FIRST STUD Hour <br /> AT INTERIOR WALL OR Volume=Conditioned floor area of the housing unit multiplied by <br /> BOTTOM PLATE CAULKED OR GASKETED HOLD BACK FIRST SND the ceiling height <br /> TO SUBFLOOR/CONCRETE SLAB AT AND RUN G.W.B. <br /> SLAB ON GRADE CONDITIONS CONTINUOUS Example:A blower door test has been done on a 2,000 square foot house <br /> and the fan flow(CFM50)rate is 1100 CFM. <br /> ACHso=(CFM50 X 60)/Volume <br /> SUBFLOOR CAULKED,GLUED OR ALL ELECTRICAL PENETRATIONS AT EXTERIOR AC <br /> =(11 00 X 60111. <br /> /(2000 X 8) <br /> GASKETED TO RIM JOIST WALLS TO USE AIR-SEALED BOXES.ALL WIRE ACHso=66,000/16,000 <br /> OPENINGS&PENETRATIONS SEALED WITH ACHso=4.1 <br /> RIM JOIST CAULKED OR GASKETED CAULK,PUTTY OR INTEGRAL SEAL. Since the code requires the ACHso to be less than 4,this house complies with an <br /> TO SILL PLATE SEAL G.W.B.TO BOX FLANGE WITH ACHso of 4.1.Record the ACHso on the energy certificate on or near the eleclncel <br /> CONTINUOUS BEAD OF CAULK OR ADHESIVE. panel. <br /> P.T.SILL PLATE INSTALLED <br /> OVER CONTINUOUS SILL GASKET <br /> W <br /> Q J <br /> L = <br /> VJ <br /> Z <br /> N ccG.W.B AIR BARRIER-CONCEPTUAL EXTERIOR MALL SECTION G.W.B AIR BARRIER-CONCEPTUAL ISOMETRIC O W <br /> p LL <br /> Z a <br /> w U a <br /> m <br /> 'z <br /> N CONCEPTUAL INTERIOR AIR BARRIER SYSTEM-GYPSUM WALL BOARD(G.W.B.)METHOD <br /> a N.T.S. - <br /> ^IZ <br /> G.W.B.ADHESIVE ON SEALANT OR ADHESIVE <br /> I CONTINUOUS BEAD w <br /> BOTH SIDES OF FIRST O a <br /> INTERIOR STUD <br /> E \ SUBFLOOR ADHESIVE <br /> JOB NO.: <br /> \ 22205 <br /> \\ I PLOT DATE <br /> SEALANT OR ADHESNE G.W.B.ADHESIVE 12/5/20234:22:21 PM <br /> AT BOTTOM AND <br /> CONTINUOUS SEALANTAT TOP OF STUD - <br /> ? FIXTURE PERIMETER TO \\ DATE: 06/08/2023 <br /> G.W.B. \ a,SCALE: 1"=1'-0" <br /> I.C.RATED RECESSED \ i DRAWN: MB <br /> G.W.B.ADHESIVE <br /> LIGHT FIXTURE ------ AT BOTTOM AND \\ CHCKD: TM <br /> o TOP OF PLATE <br /> GENERAL SHEETS <br /> "-SHEET NO.: <br /> SEALING AT RECESSED FIXTURES A SEALING AT INTERSECTING WALLS SEALING AT RIM JOIST A19 <br /> --- 3 N.T.S. — `f N.T.S. 5 N.T.S. <br />