PLAN NOTES <br /> (THESE NOTES ARE TYPICAL UNLESS NOTED OR DETAILED OTHERWISE ON DRAWINGS) ENGINEERING <br /> FOUNDATION PLAN&MAIN FLOOR FRAMING PLAN NOTES: ABBREVIATIONS <br /> (A) FBARDIAMETER <br /> GLB GLUE-LAMINATED BEAM 250 4TH AVE. S., SUITE 200 <br /> 1. EXTERIOR FOOTINGS SHALL BEAR A MIN OF 1'-6"BELOW ADJACENT GRADE. ED11ONDS, WASHIN13TON 98020 <br /> A8 HORIZ HORIZONTAL PHONE (425) 778-8500 <br /> 2. FOOTINGS SHALL BEAR ON FIRM NATIVE SOIL OR COMPACTED STRUCTURAL FILL. ALT KP KING POST FAX (425) 778-5536 <br /> 3. PLACE ALL REINFORCEMENT PER THE STRUCTURAL NOTES AND FOUNDATION DETAILS.REFER TO ARCH KSI KIPS PER SQUARE INCH <br /> STRUCTURAL NOTES FOR ADDITIONAL CONCRETE DETAILING REQUIREMENTS. (B) L ANGLE <br /> 4. REFER TO HOEDOWN SCHEDULE ON SHEET S2.1 FOR HOLDOWN TYPES AND FRAMING PLANS FOR HOLDOWN BD MECH MECHANICAL <br /> ANCHOR BOLT LOCATIONS. BLKG BLOCKING MF MOMENT FRAME <br /> S. REFER TO FRAMING PLANS AND SHEAR WALL SCHEDULE ON SHEET S2.2 FOR LOCATION AND TYPE OF SHEAR BM BEAM MTL METAL <br /> WALL ANCHOR BOLTS.ANCHORAGE AT NON-SHEAR WALLS SHALL BE PER STRUCTURAL NOTES. BOT BOTTOM NS NEAR SIDE <br /> 6. CONTRACTOR SHALL VERIFY ALL DIMENSIONS,WALL LOCATIONS,AND CONCRETE ROUGH OPENINGS WITH BRNG BEARING OC ON CENTER <br /> ARCHITECTURAL DRAWINGS AND NOTIFY ALL PARTIES OF ANY DISCREPANCIES. BTWN BETWEEN OPP OPPOSITE <br /> 7. REFER TO DETAIL 2/S3.1 FOR PIPE PENETRATIONS THROUGH CONCRETE WALL OR FOOTINGS. Clp COMPLETE JOINT PENETRATION PL PLATE <br /> 8. FLOOR SHEATHING SHALL BE 3/4"PI 48/24 WITH 10d COMMON NAILS SPACED AT 6"OC AT ALL DIAPHRAGM CUR CLEAR PLCS PLACES ,,p$G, <br /> BOUNDARIESAND,PANEL EDGES AND SHEAR WALLS AND SO"OC AT INTERMEDIATE FRAMING.FOR SHEATHING CMU CONCRETE MASONRY UNIT P51 POUNDS PER SQUARE INCH p5�"Og xASbj G <br /> LAYOUT DIAPHRAGMS <br /> LIN BLOCK REFER D UNC.IL 2/54.1. <br /> COL COLUMN PSF POUNDS PER SQUARE FOOT R � <br /> 9. ALL DIAPHRAGMS UNBLOCKED UNO. CONC CONCRETE P/T POSTTENSIONED <br /> 10. UNLESS NOTED OTHERWISE ALL STUDS SHALL BE HF STUD GRADE AND SPACED AT 16"OC. CONN CONNECTION PT PRESSURE TREATED <br /> 11. CONTRACTOR SHALL HAVE THE OPTION TO DRILL A 11/2"0 HOLE CENTERED IN THE DEPTH AND ATTHE CONT CONTINUOUS REINF REINFORCING "ZONAL T" <br /> THIRD POINT OF THE SPAN FOR ALL WOOD FLUSH BEAMS SHOWN ON THE PLAN. COORD COORDINATE REQ'D REQUIRED <br /> 12, WALLS SHOWN ON THE FRAMING PLANS ARE WALLS BELOW THE FRAMING LEVELS INDICATED. DBL DOUBLE SCHED SCHEDULE 09/03/21 <br /> DET DETAIL SIM SIMILAR <br /> 13. SEE TYPICAL UPPER FLOOR FRAMING NOTES FOR ADDITIONAL INFORMATION NOT OTHERWISE SPECIFIED DIA DIAMETER <br /> HERE. SOG SLAB ON GRADE <br /> TYPICAL UPPER FLOOR FRAMING PLAN NOTES, <br /> DIM DIMENSION STD STANDARD <br /> DIR DIRECTION STIFF STIFFENER <br /> 1. FLOOR SHEATHING SHALL BE 3/4"PI 48/24 WITH 10d COMMON NAILS SPACED AT 6"OC AT ALL DIAPHRAGM EA EACH STL STEEL <br /> BOUNDARIES,PANEL EDGES AND SHEAR WALLS AND 10"OC AT INTERMEDIATE FRAMING.FOR SHEATHING <br /> LAYOUT AND NAILING REFER TO DETAIL 2/S4.1 ELEV ELEVATION SYMM SYMMETRICAL <br /> AT EXTERIOR DECKS,SHEATHING SHALL BE 2x PT OR COMPOSITE DECKING LAID FLAT W/1/4"GAP BETWEEN ES EACH SIDE' SW SHEARWALL Q DECK BOARDS AND NAILED W/(2)16d NAILS EVENLY SPACED PER BOARD AT DECKING ENDS AND ALL EX EXISTING TOC TOP OF CONCRETE Q <br /> BOUNDARY EDGES,AND(1)16d NAILS EVENLY SPACED PER BOARD AT ALL SUPPORT FRAMING. EXp EXPANSION <br /> TOS TOP OF STEEL _ <br /> 2. COLUMNS AND BEARING WALLS SHOWN ON PLANS SHALL BE CONTINUED DOWN TO THE FOUNDATION FUR FLOOR EVERT <br /> TOP OF WALL Z <br /> UNLESS CARRIED BY A BEAM BELOW. <br /> FDN 0 co <br /> FOUNDATION TYPICAL d N 3. ALL DIAPHRAGMS UNBLOCKED UNO. FTG FOOTING UNLESS NOTED OTHERWISE K H 1= <br /> 4. CONTRACTOR SHALL HAVE THE OPTION TO DRILL A 11/2"0 HOLE CENTERED IN THE DEPTH AND ATTHE FS FAR SIDE VERTICAL NTHIRD POINT OF THE SPAN FOR ALL WOOD FLUSH BEAMS SHOWN ON THE PLAN. GENERAL CONTRACTOR WIDE FLANGE O a a <br /> S. WALLS SHOWN ON THE FRAMING PLANS ARE WALLS BELOW THE FRAMING LEVELS INDICATED. <br /> N ti <br /> 6. STRAP STYLE HOEDOWNS SHALL BE ATTACHED ATTHE UPPER FLOOR WALLS AND WILL SPAN VERTICALLY r S-N m <br /> ACROSS THE FLOOR FRAMING WALL-TO-WALL WITH MAXIMUM NAILS.REFER TO DETAIL 1/54.2 FOR Q N O <br /> ADDITIONAL INFORMATION. <br /> 7. <br /> o^g <br /> UNLESS NOTED OTHERWISE,HEADERS SHALL BE 4x6 HFp2 WHERE MAXIMUM SPAN=5'-0"AND SUPPORTED <br /> 0 <br /> BY A MINIMUM OF(1)CRIPPLE STUD AND(1)FULL HEIGHT STUD. y <br /> 0' <br /> 8. COLUMNS NOT OTHERWISE SHOWN OR CALLED OUT ON PLAN SHALL BE(2)2x STUDS. <br /> 9. UNLESS NOTED OTHERWISE,ALL STUDS SHALL BE HF STUD GRADE AND SPACED AT I6"OC. DESIGN: RMK <br /> 10. UNLESS NOTED OTHERWISE,ALL BEAM-TO-BEAM CONNECTIONS SHALL BE SIMPSON HU OR HUC SERIES DRAWN: LVW <br /> FACE MOUNT HANGERS W/MAX NAILING. <br /> CHECK: <br /> 11. UNLESSHANGERS <br /> NOTED SW/MAX NAILING <br /> JOISTDIMENSIONAL <br /> LUMBER. JOB <br /> BE SIMPSON HU SERIES FACE MOUNT JOB NO: 21267.10 <br /> HANGERS W/MAX NAILING FOR DIMENSIONAL LUMBER. <br /> 12. UNLESS NOTED OTHERWISE,ALL BEAM-TO-POST CONNECTIONS SHALL BE SIMPSON CCQ OR ECCQ COLUMN DATE: 07/21/21 <br /> CAPS. <br /> 13. SEE TYPICAL ROOF FRAMING PLAN NOTES FOR ADDITIONAL INFORMATION NOT OTHERWISE SPECIFIED <br /> HERE. <br /> TYPICAL ROOF FRAMING PLAN NOTES: <br /> 1. WALLS SHOWN ON ROOF FRAMING PLAN ARE WALLS BELOW ROOF FRAMING. <br /> 2. BEAMS SHOWN ON ROOF FRAMING PLAN SHALL BE ABOVE DOUBLE TOP PLATE UNLESS USED AS A DOOR <br /> OR WINDOW HEADER. <br /> 3. ROOF SHEATHING SHALL BE 1/2"PI 40/20 WITH 8d COMMON NAILS SPACED AT 6"OC AT ALL DIAPHRAGM <br /> BOUNDARIES,PANEL EDGES,SHEAR WALLS,COLLECTOR TRUSSES,AND BLOCKING OR TRUSS BLOCKING <br /> PANELS INDICATED ON PLANS.NAILING AT INTERMEDIATE FRAMING SHALL BE 8d COMMON NAILS @ 12" <br /> OC.REFER TO DETAIL 2/S4.1 FOR SHEATHING LAYOUTAND NAILING. <br /> 4. UNLESS NOTED OTHERWISE,HEADERS SHALL BE 4x6 HFp2 WHERE MAXIMUM SPAN=S'-0"AND <br /> SUPPORTED BY A MINIMUM OF(1)CRIPPLE STUD AND(1)FULL HEIGHT STUD. <br /> J <br /> S. UNLESS NOTED OTHERWISE,ALL STUDS SHALL BE HF STUD GRADE AND SPACED AT 16"OC. W <br /> 6. REFER TO DETAIL 3/S4.1 FOR CONSTRUCTION OF MULTIPLE STUD COLUMNS. O <br /> 7. ALL DIAPHRAGMS UNBLOCKED UNO. <br /> 6. COLUMNS AND BEARING WALLS SHOWN ON PLAN SHALL BE CONTINUED DOWN TO THE FOUNDATION W <br /> M UN CARRIED BY A BEAM BELOW. <br /> . <br /> O <br /> 9. ATTACH ALL RAFTERS AND ROOF TRUSSES TO WALLS BELOW WITH SIMPSON H2.5A HURRICANE TIES. W <br /> U W 00 N <br /> 10. CONTRACTOR SHALL HAVE THE OPTION TO DRILL A 11/2"0 HOLE CENTERED IN THE DEPTH AND AT THE W Q w 0) <br /> THIRD POINT OF THE SPAN FOR ALL WOOD FLUSH BEAMS SHOWN ON THE PLAN. Q Q 11, ROOF TRUSSES SHALL BE PRE-ENGINEERED BY OTHERS AND SPACED AT 24"OC,TYP. N = < O <br /> N <br /> Y uiQf <br /> Z <br /> J M > Q u <br /> (n Lo W <br /> G <br /> SHEET: <br /> S1.2 <br />