Laserfiche WebLink
C CM011 <br /> ENGINEERING <br /> 250 4TH AVE. S., SUITE 200 <br /> NOTE: 2x OR 3x BLOCKING ONLY EDMONDS, WASHINGTON 98020 <br /> STAGGER SHEATHING AS IF BLOCKED DIAPHRAGM PHONE (425) 778-8500 <br /> SHOWN.(IBC TABLE i FOR 2x4 STUDS,PROVIDE SINGLE FAX (425) 778-5536 <br /> IS SPECIFIED ROW OF NAILS STAGGERED EASIDE <br /> 2306.3.1,CASE 1 OR 3) FRAMING MEMBERS W/ \i WITH 11/2"EDGE DISTANCE.FOR <br /> INTERMEDIATE SPACING PER PLAN a 2x6 STUDS,PROVIDE(2)ROWS OF <br /> FRAMING MEMBERS "'o NAILS SPACED AT 21/2"W/11/2" <br /> SHEATHING EDGE DISTANCE <br /> STAGGER NAILS ON EA SIDE PANEL,TYP <br /> OF PANELJOINT AS REQUIRED <br /> 9"OC MAX SPACING BETWEEN <br /> PER SHEAR WALL SCHED PANEL EDGE NAILING <br /> ADJACENT NAILS IN A ROW <br /> PER SHEAR WALL CONTINUOUS <br /> ___________ SCHEDULE,TYP PANELEDGES ADJACENT NAILS INA <br /> ______ _ � _ _ II ROWARETO BE <br /> I•I I•I n-------n -n- j.I PANEL EDGE NAILING INTO I DRIVEN FROM <br /> I I I I I I I•I I•I ICI HOLDOWN CHORDS,TYP r--J�_ OPPOSITE SIDES,TYP <br /> II II II II II <br /> HEADER PER PLAN I I I I I I I I I I I I I,1 NAILING @ 12INTERMEDIATE"OC I, •e <br /> •I I I I ICI I I•I I•I I•I ICI I I�, II I 0.131"0 x 3"NAILS,TYP <br /> I I I I I I I•I I I I I I I I I I I I II I m <br /> I•I I j j j j I I FRAMING AT ADJOINING I j j I'I SHEATHING PER PLAN AND I I <br /> CRIPPLE STUDS PER IIII I I I I I I I PANEL EDGES PER SHEAR I III SHEAR WALL SCHEDULE <br /> PLAN;DO NOT CUT IIII I.1 I•I , I I I I PANELEDGES _ _ _ _ _ <br /> AWAY MATERIAL FROM I I• I, I I I I I'I WALL SCHED <br /> (5)STUDS MAX TO '��y 1 <br /> I I I I I•I I I I1. i i I ,I BE USED FOR OVAL CRIPPLESTUDS I I I I I I I,I I I I I I I I•I HOLDOWN CHORD PER I BUILT-UP COLUMNS I <br /> I•II II II I 1 II II II II III SCHEDULE.REFER TO I I I I <br /> III I I I I I•1 I I I I I I I I I III TYPICAL BUILT-UP 1 /05/21 <br /> III I• I I I,I I,, I,I I,I I,I I• COLUMN DETAIL <br /> HOLDOWN CHORD I ICI I I I I I j l I I I I I I I I <br /> L-_-___H H____==H H_---- TYPICAL FLOOR/ROOF SHEATHING DETAIL SCALE: NTS TYPICAL BUILT-UP STUD COLUMN DETAIL <br /> '-0"IIII I•I I ,�I I.I I I I.I I.I <br /> I•I ADDITIONAL END STUD <br /> I•I I I I I I I I ,, I I I I IF REQUIRED TO <br /> IIII II II I•I I, II II <br /> IIII I I I I I,I I I I I I I I I PROVIDE <br /> I•I I I I I I I I I I I I COUNTERSINK FOR <br /> IIII I I I•I I I I I I I I I HOLDOWN BOLTS <br /> I•I I I I•I I• I I•I I•I ICI FTYID <br /> TOP POLATELE <br /> UI <br /> HOLDOWN ANCHORAGE -� <br /> 11 I I PER PLAN AND SCHEDULE ,� Q <br /> AB W/SIMPSON BP I I I I I I j I I I I I I (2)ROWS OF(8)0.131"0 x 3" FFQ <br /> PL WASHER,TYP , i I,I I I I,I I,I 1/2"TO SIMPSON CNW COUPLER NAILS @ 3"OC EA SIDE OF <br /> I'I 21/4"ENDII II II•III II III III II II II II SHEATHED EDGE SPLICE AND(2)@ 9"OC ZO mH co <br /> SIZE TO MATCH DISTANCE,TYPNUTW/ <br /> HOLDOWN ANCHORAGE PLATE WASHER ELSEWHERE W/11/2"EDGE SIMPSON A35(ONLY <br /> PER SHEAR DISTANCE REQUIRED AT EXTERIOR crPT SILL PL PER SHHAR nft� S3 <br /> ED WALLSCHED OC HEADERS GREATER WALL S PACING <br /> ICI I�I I�j I•I ICI I•II I I I THAN 6'SPAN) O <br /> PANELEDGE II. V) <br /> -1L__-_-_lam__-___L NAILING PER SHEAR II (6)0.131"�x3"NAILS W d a <br /> WALL SCHED I I <br /> III �� II II II II I II, •d. TOP CHORD TYPICAL STUDS <br /> CONTINUE HOLDOWN CHORD I I SPLICE AT LOCATIONS WHERE IT IS NOT POSSIBLE BOTTOM N N TO FOUNDATION TO INSTALL THE SPECIFIED 0.131"0 CHORD <br /> _ 1L_�._ I _ I, SPLICE NAILS,THE CONTRACTOR SHALL SPLICE H.-i m <br /> -1L --___1 BEAM OR HEADER PER <N O <br /> INSTALL SIMPSON C520 STRAPS EA SIDE p a) <br /> SECTION A-A I PLAN AND NOTES n T <br /> AB SIZE AND SPACING A —�L II II W WALL 2)10d SPLICE.INSTALL R STRAP O O <br /> CONCRETE FOOTING PER PLAN AND SHEAR II II ,f SCALE:11 2"=1'-0" W/(12)30d AT EA END.WHERE BOTH <br /> OR P/T SLAB WALL SCHEDULE,TYP l6 RIM BOARD L6 �� PLATES ARE CUT,INSTALL C520 STRAPS <br /> �N AT EA PLATE AND EA SIDE OFTHE WALL. NAILING PER TYP <br /> OR BLOCKING /l BUILT-UPSTUD Q <br /> NOTES: // CONCRETE STEM WALL f <br /> 1791111 TO STRUCTURAL NOTES FOR COLUMN DETAIL <br /> 6'-0"MIN BETWEEN SPLICES DESIGN: RMK <br /> . ———L <br /> ADDITIONAL INFORMATION. CONCRETE FOOTING L � RIPPLE STUDS PER PLAN <br /> 2.AREFOR SHEARWTHEFIRTABSALLS WHERE NO HLL BE SPLICES TO OCCUR AT AT HOLDOWNS:PROERHDSLL HT DRAWN: LVW <br /> ARE SPECIFIED MORE <br /> V-0"AND CENTER OF VERTICAL STUDS--� HOLDOWN CHORDS PER HD SCHED. STRUCTURAL <br /> SCHEDULE OR <br /> LOCATED NOT MORE THAN 1'-0"AND NOT — — — — — — OTHERWISE:(1)2x FULL HT STRUCTURAL NOTES CHECK: <br /> LESS THAN(7)BOLT DIAMETERS FROM END .III— =1 I=1 1= -T-1 - <br /> OF WALL. TOP CHORD SPLICE BOTTOM CHORD SPLICE JOB NO: 21267.10 <br /> �1 TYPICAL SHEAR WALL DETAIL DATE: 07/21�21 <br /> 8 SCALE: 3/4"=V-0° �1 TYPICAL TOP PLATE SPLICE DETAIL TYPICAL HEADER DETAIL <br /> SCALE: 1"=1'-0" � SCALE: 1"=1'-0" <br /> EDGE NAILING PER PLAN BEAM PER PLAN <br /> AND SHEAR WALL AND SCHEDULE <br /> SCHEDULE OR EDGE NAILING PER PLAN 2x6 STUD @ 2x4 CROSS WALL SIMPSON A35 EACH <br /> STRUCTURAL NOTES,TYP AND SHEAR WALL 2x8 STUD @ 2x6 CROSS WALL JOIST DIRECTION Ar SIDE OF BEAM <br /> SCHEDULE OR PER PLAN J <br /> 0.131"0 x 3" STRUCTURAL NOTES,TYP NOTE: <br /> NAILS @ 9"OC SUPPORTS AT SOLID G x _ <br /> POSTS SIM 0 a <br /> STUD WALL STUD 112 SPAN 2"MIN 21/2"0 MAX HOLE W Q <br /> WALL <br /> ALLOWABLE DRILL AREA O W <br /> BEAM PER PLAN 1/3 DEPTH 0 <br /> NAILS@SOF0.131"0x3" EDGE WALL PER SCHEDULE <br /> AND AND SCHEDULE _ ____ W <br /> NAILS @ 9"OC SHEAR WALL SCHEDULE OR I O I MIDDLE 1/3 <br /> STRUCTURAL NOTES,TYP � _ _ ______ M !rl <br /> SIMPSON LTP40R 4'MIN J 1/3 DEPTH W Z <br /> A35 FRAMING <br /> STUD WALL PER 0.131"0 x 3" ANCHOR EACH SIDE <br /> FRAMING PLAN NAILS @ 9"OC OF BEAM Z W � <br /> NOTES,TYP NOTE: <br /> STUD WALL PER FRAMING HOLES DRILLED THRU JOISTS SHALL BE Ld <br /> PLAN NOTES,TYP 1/3 SPAN 1/3 SPAN 1/3 SPAN LOCATED IN THE MIDDLE THIRD OF 0 Q Q Q <br /> SHEATHING(OR GWB)AND MIDDLE THE JOIST DEPTH&MIDDLE THIRD OF N = <br /> SHEATHING <br /> NAILINGNG(OR PER WB) SHEAR SHEATHING SOLIDORMULTIPLE - SOLID ORMULTIPLE THE JOIST SPAN,BUT NOT THE EXACT W L.L. <br /> WALL SCHEDULE OR NAILING PER PLAN AND SHEAR STUD COLUMN PER PLAN BEAM WIDTH, STUD COLUMN PER PLAN CENMINIMIZE <br /> AN.CONIZETRACTOR <br /> CTOR SHPOSSIBLALL <br /> Of Ill <br /> STRUCTURAL NOTES,TYP WALL SCHEDULE OR MIN LINO CONTACT ENGINEER FOR DRILLING (V ~ <br /> STRUCTURAL NOTES,TYP 0 <br /> OUTSIDE AREA SHOWN �/ W <br /> A.CORNER INTERSECTION B.'T'INTERSECTION PARALLEL TO STUD WALL PERPENDICULAR TO STUD WALL J M ; O ,. <br /> (n Lo W <br /> TYPICAL WALL INTERSECTION DETAIL TYPICAL FLUSH BEAM SUPPORT DETAILS GUIDELINES FOR HOLES DRILLED THRU JOISTS <br /> SCALE: 1"=1'-D" SHEET: <br /> S4.1 <br />