Laserfiche WebLink
PLACE NOTES �- <br /> (THESE NOTES ARE TYPICAL UNLESS NOTED OR DETAILED OTHERWISE ON DRAWINGS) ENGINEEi3ING <br /> ABBREVIATIONS <br /> FOUNDATION PLAN&MAIN FLOOR FRAMING PLAN NOTES: (A) ABOVE GLB GLUE-LAMINATED BEAM 250 4TH AVE. S., SUITE 200 <br /> EDMONDS, WASHINGTON 98020 <br /> 1. EXTERIOR FOOTINGS SHALL BEAR A MIN OF V-6"BELOW ADJACENT GRADE. AB ANCHOR BOLT HORIZ HORIZONTAL PHONE (425) 778-8500 <br /> KING POST FAX (425) 778-5536 KF T RN T ALTERNATE 2. FOOTINGS SHALL BEAR ON FIRM NATIVE SOIL OR COMPACTED STRUCTURAL FILL. AI- _ <br /> 3. PLACE ALL REINFORCEMENT PER THE STRUCTURAL NOTES AND FOUNDATION DETAILS.REFER TO ARCH ARCHITECT KSI KIPS PER SQUARE INCH <br /> - - - - - - - - <br /> STRUCTU RAIL NOTES FOR ADDITIONAL CONCRETE DETAILING REQUIREMENTS. (8) BELOW L ANGLE <br /> 4. REFER TO HOEDOWN SCHEDULE ON SHEET S2.1 FOR HOLDOWN TYPES AND FRAMING PLANS FOR HOLDOWN BD BAR DIAMETER MECH MECHANICAL <br /> ANCHOR BOLT LOCATIONS. BLKG BLOCKING MF MOMENT FRAME <br /> S. REFER TO FRAMING PLANS AND SHEAR WALL SCHEDULE ON SHEET S2.2 FOR LOCATION AND TYPE OF SHEAR BM BEAM MTL METAL <br /> WALL ANCHOR BOLTS.ANCHORAGE AT NON-SHEAR WALLS SHALL BE PER STRUCTURAL NOTES. BOT BOTTOM NS NEAR SIDE <br /> 6. CONTRACTOR SHALL VERIFY ALL DIMENSIONS,WALL LOCATIONS,AND CONCRETE ROUGH OPENINGS WITH BRNG BEARING OC ON CENTER <br /> ARCHITECTURAL DRAWINGS AND NOTIFY ALL PARTIES OF ANY DISCREPANCIES. BTWN BETWEEN OPP OPPOSITE <br /> 7. REFER TO DETAIL 2/S3.1 FOR PIPE PENETRATIONS THROUGH CONCRETE WALL OR FOOTINGS. CIP COMPLETE JOINT PENETRATION PL PLATE <br /> 8. FLOOR SHEATHING SHALL BE 3/4"PI 48/24 WITH lOd COMMON NAILS SPACED AT 6"OC AT ALL DIAPHRAGM CLR CLEAR PLCS PLACES G.- <br /> x4� <br /> BOUNDARIES,PANEL EDGES AND SHEAR WALLS AND 10"OC AT INTERMEDIATE FRAMING,FOR SHEATHING CMU CONCRETE MASONRY UNIT PSI POUNDS PER SQUARE INCH Q of i <br /> LAYOUT AND NAILING REFER TO DETAIL 2/S4.1. COL COLUMN PSF POUNDS PER SQUARE FOOT /Fa �o <br /> 9. ALL DIAPHRAGMS UNBLOCKED UNO. CONC CONCRETE P/T POST TENSIONED <br /> T PRESSURE TREATED 10. UNLESS NOTED OTHERWISE ALL STUDS SHALL BE HF STUD GRADE AND SPACED AT 16"OC. CONN CONNECTION P �P L <br /> SI <br /> 11. CONTRACTOR SHALL HAVE THE OPTION TO DRILL HOLE CENTERED IN THE DEPTH AND AT THE COORD COORDINATE REQ'D REQUIRED <br /> CONT CONTINUOUS REINF REINFORCING CNAL <br /> THIRD POINT OF THE SPAN FOR ALL WOOD FLUSH BEAMS SHOWN ON THE PLAN. _ 2,1 21 <br /> 12. WALLS SHOWN ON THE FRAMING PLANS ARE WALLS BELOW THE FRAMING LEVELS INDICATED. DEL DOUBLE SCHED SCHEDULE <br /> DET DETAIL SIM SIMILAR <br /> 13. SEE TYPICAL UPPER FLOOR FRAMING NOTES FOR ADDITIONAL INFORMATION NOT OTHERWISE SPECIFIED HERE. DIA DIAMETER SOG SLAB ON GRADE <br /> DIM DIMENSION STD STANDARD <br /> TYPICAL UPPER FLOOR FRAMING PLAN NOTES: <br /> DIR DIRECTION STIFF STIFFENER <br /> 1. FLOOR SHEATHING SHALL BE 3/4"PI 48/24 WITH 10d COMMON NAILS SPACED AT 6"OCAT ALL DIAPHRAGM EA EACH STL STEEL <br /> BOUNDARIES,PANEL EDGES AND SHEAR WALLS AND 10"OC AT INTERMEDIATE FRAMING.FOR SHEATHING <br /> LAYOUT AND NAILING REFER TO DETAIL 2/S4.1 ELEV ELEVATION SYMM SYMMETRICAL <br /> - <br /> AT EXTERIOR DECKS,SHEATHING SHALL BE 2x PT OR COMPOSITE DECKING LAID FLAT W/1/4"GAP BETWEEN --ES EACH SIDE SW SHEARWALL-- - - Q <br /> DECK BOARDS AND NAILED W/(2)lad NAILS EVENLY SPACED PER BOARD AT DECKING ENDS AND ALL EX_ EXISTING TOC TOP OF CONCRETE _ <br /> BOUNDARY EDGES,AND(1)lad NAILS EVENLY SPACED PER BOARD ATALL SUPPORT FRAMING. EXP EXPANSION TOS TOP OF STEEL <br /> 2. COLUMNS AND BEARING WALLS SHOWN ON PLANS SHALL BE CONTINUED DOWN TO THE FOUNDATION FLR FLOOR TOW TOP OF WALL co yOj <br /> UNLESS CARRIED BY A BEAM BELOW. LD FDN FOUNDATION TYP TYPICAL d an <br /> 3. ALL DIAPHRAGMS UNBLOCKED UNO. FTG FOOTING UNO UNLESS NOTED OTHERWISE <br /> 4. CONTRACTOR SHALL HAVE THE OPTION TO DRILL A 11/2"0 HOLE CENTERED IN THE DEPTH AND ATTHE FS FAR SIDE VERT VERTICAL V) w w <br /> THIRD POINT OF THE SPAN FOR ALL WOOD FLUSH BEAMS SHOWN ON THE PLAN. GC GENERAL CONTRACTOR WF WIDE FLANGE 0 d d <br /> S. WALLS SHOWN ON THE FRAMING PLANS ARE WALLS BELOW THE FRAMING LEVELS INDICATED. <br /> ..y N <br /> N N <br /> THE FLOOR FRAMING WALL-TO-WALL WITH MAXIMUM NAILS.REFER TO DETAIL 1/S4.2 FOR <br /> 6, STRAP STYLE HOEDOWNS SHALL BE ATTACHED AT THE UPPER FLOOR WALLS AND WILL SPAN VERTICALLY LU <br /> ACROSS C N O <br /> ADDITIONALINFORMATION. 0 <br /> O O <br /> 7. UNLESS NOTED OTHERWISE,HEADERS SHALL BE 4x6 HF#2 WHERE MAXIMUM SPAN=S'-0"AND SUPPORTED Y <br /> -< - BY A MINIMUM OF(1)CRIPPLE STUD AND(1)FULL HEIGHT STUD. <br /> a <br /> S. COLUMNS NOT OTHERWISE SHOWN OR CALLED OUT ON PLAN SHALL 8E(2)2z STUDS. � <br /> 9. UNLESS NOTED OTHERWISE,ALL STUDS SHALL BE HF STUD GRADE AND SPACED AT 16'OC. DESIGN: RMK <br /> -10. UNLESS NOTED OTHERWISE,ALL BEAM-TO-BEAM CONNECTIONS SHALL BE SIMPSON HU OR HUC SERIES DRAWN: LVW <br /> FACE MOUNT HANGERS W/MAX NAILING. CHECK: <br /> 11. UNLESS NOTED OTHERWISE,ALL JOIST-TO-BEAM CONNECTIONS SHALL BE SIMPSON HU SERIES FACE MOUNT JOB NO: 21 267.10 <br /> - HANGERS W/MAX NAILING FOR DIMENSIONAL LUMBER. - DATE: 07/21/21 <br /> [I{t 12. UNLESS NOTED OTHERWISE,ALL BEAM-TO-POST CONNECTIONS SHALL BE SIMPSON CCQOR ECCQ COLUMN <br /> CAPS, <br /> 13. SEE TYPICAL ROOF FRAMING PLAN NOTES FOR ADDITIONAL INFORMATION NOT OTHERWISE SPECIFIED <br /> HERE. <br /> TYPICAL ROOF FRAMING PLAN NOTES: <br /> 1. WALLS SHOWN ON ROOF FRAMING PLAN ARE WALLS BELOW ROOF FRAMING. <br /> 2. BEAMS SHOWN ON ROOF FRAMING PLAN SHALL BE ABOVE DOUBLE TOP PLATE UNLESS USED AS A DOOR <br /> OR WINDOW HEADER. <br /> 3. ROOF SHEATHING SHALL BE 1/2"PI 40/20 WITH Bd COMMON NAILS SPACED AT 6"OC AT ALL DIAPHRAGM <br /> BOUNDARIES,PANEL EDGES,SHEAR WALLS,COLLECTOR TRUSSES,AND BLOCKING OR TRUSS BLOCKING <br /> PANELS INDICATED ON PLANS.NAILING AT INTERMEDIATE FRAMING SHALL BE 8d COMMON NAILS @ 12" <br /> OC.REFER TO DETAIL 2/S4.1 FOR SHEATHING LAYOUT AND NAILING. - <br /> 4. UNLESS NOTED OTHERWISE,HEADERS SHALL BE 46 HF#2 WHERE MAXIMUM SPAN=5'-0"AND <br /> SUPPORTED BY A MINIMUM OF(1)CRIPPLE STUD AND(1)FULL HEIGHT STUD. J <br /> S. UNLESS NOTED OTHERWISE,ALL STUDS SHALL BE HF STUD GRADE AND SPACED AT 16"OC. L u <br /> 6. REFER TO DETAIL 3/S4.1 FOR CONSTRUCTION OF MULTIPLE STUD COLUMNS, O <br /> 7. ALL DIAPHRAGMS UNBLOCKED UNO. W <br /> 8. COLUMNS AND BEARING WALLS SHOWN ON PLAN SHALL BE CONTINUED DOWN TO THE FOUNDATION M <br /> UNLESS CARRIED BY A BEAM BELOW. - <br /> W N <br /> 9. ATTACH ALL RAFTERS AND ROOF TRUSSES TO WALLS BELOW WITH SIMPSON H2.SA HURRICANE TIES. () W 00 /^ <br /> 10, CONTRACTOR SHALL HAVE THE OPTION TO DRILL A 11/2"0 HOLE CENTERED IN THE DEPTH AND AT THE W > 01 Vw, <br /> THIRD POINT OF THE SPAN FOR ALL WOOD FLUSH BEAMS SHOWN ON THE PLAN, Q Q Q? <br /> 11, ROOF TRUSSES SHALL BE PRE-ENGINEERED BY OTHERS AND SPACED AT 24"OC,TYP. (f = > 0 <br /> f- <br /> 1� W Z <br /> J - > -J <br /> (n Ln LIJ <br /> SHEET: <br /> I <br />