Laserfiche WebLink
ENGINeeRING <br /> 250 4TH AVE. S., SUITE 200 <br /> NOTE: EDMONDS, WASHINGTON 98020 <br /> STAGGERSHEATHING AS 2x BLOCKING ONLY PHONE (425) 778-8500 <br /> SHOWN.( BLOC ) <br /> IF BLOCKED DIAPHRAGM <br /> IBC TABLE p� FOR 2x4 STUDS,PROVIDE SINGLE FAX (425 778-5536 <br /> 2306.3.1,CASE 1 OR 3) IS SPECIFIED z ROW OF NAILS STAGGERED EA SIDE <br /> FRAMING MEMBERS W/ \z WITH 11/2"EDGE DISTANCE.FOR <br /> INTERMEDIATE SPACING PER PLAN ,..r 2x6 STUDS,PROVIDE(2)ROWS OF <br /> FRAMING MEMBERS '^ NAILS SPACED AT 21/2"W/11/2" <br /> _ SHEATHING _ N p EDGE DISTANCE <br /> STAGGER NAILS ON EA SIDE PANEL,TYP -I <br /> OF PANEL JOINT AS REQUIRED - I I <br /> PER SHEAR WALL SCHED PANEL EDGE NAILING _ _ 9" MAX SPACING BETWEEN <br /> PER SHEAR WALL CONTINUOUS - - ADJACENT NAILS IN A ROW <br /> ADJACENT NAILS IN A <br /> _________ _ _ __ __ __ __ __ __ __ __ __ _____ SCHEDULE,nP PANEL EDGES ROW ARE TO BE <br /> -r' -� n______-n- -- - --rn PANEL EDGE NAILING INTO I DRIVEN FROM <br /> I•I ICI I•I LI LI LI I•I HOLDOWN CHORDS,TYP I <br /> I I I I OPPOSITE SIDES,TYP <br /> ill ii ii i . L_ IL_J <br /> � II II I 11 II II III INTERMEDIATE -_ �'- -, .- - G• G <br /> HEADER PER PLAN III NAILING @ 12"OC �G <br /> I.I I•I 0 pf FAS <br /> •I I I I I I I _ rl rl I•I 1•I I� I I <br /> I I I I I I I I I I I o.13r'p x 3"Naas,TYP o <br /> IIII I II I• 1 li Ills ii II Ii II I � A o`( <br /> I� Ili II 1 II ILI I i� <br /> I•I l FRAMING E ADJOINING 1 1 SHEATHING PER PLAN AND I m <br /> CRIPPLE STUDS PER IIII 1 PANEL EDGES PER SHEAR I' SHEAR WALL SCHEDULE _ _ <br /> PLAN;DO NOT CUT IIII I• I•I — <br /> I'I WALL SCHED — — — — — — Huss <br /> AWAY MATERIAL FROM I• LI r (5)STUDS MAX TO •A. L <br /> I•1 III I I I BE USED FOR <br /> HOEDOWN CHORD PER `SIGNAL <br /> CRIPPLE STUDS I <br /> III h I•' SCHEDULE.REFER TO I I I I BUILT-UP COLUMNS <br /> I ,il I I II II II II <br /> III •I TYPICAL BUILT-UP -. ... <br /> I•I I• <br /> IIII I• I I I I I,I I,I I I <br /> FULL-HEIGHT I I•I I I I I I I I I I I I I•I COLUMN DETAIL <br /> HOEDOWN CHORD IIII •I "II ILII II I I I I I•I1 I II •__Jfi Lr____________iI•hI_-_-_-_-_-_-iI hI•__________ <br /> � TYPICAL FLOOR/ROOF SHEATHING DETAIL TYPICAL BUILT-UP STUD COLUMN DETAIL <br /> I•I ADDITIONAL END STUD <br /> I•I IF REQUIRED TO <br /> i j l III j,•I I I PROVIDE <br /> I•I COUNTERSINK FOR <br /> 1 I I•I I•I I,•I I•I �.� I,I II,I HOLDOWN BOLTS <br /> nP DOUBLE <br /> I• III J III HOEDOWN ANCHORAGE - TOP PLATE J <br /> I, I PER PLAN AND SCHEDULE a <br /> AS W/SIMPSON BP (2)ROWS OF(8)0.131"0 z 3" <br /> PL WASHER,nP 1/2"TO NAILS @ 3"OC EA SIDE OF F- <br /> Id I, I,I I,I I,I <br /> I•I SIMPSON CNW COUPLER 2 1/4"END m <br /> NUT W/SIZETO MATCH SHEATHED EDGE DISTANCE,TYP SPLICE AND(2)@ 9"OC Z O <br /> I, HOEDOWN ANCHORAGE <br /> PLATE WASHER ELSEWHERE W/11/2"EDGE SIMPSON A35(ONLY O co ys <br /> PT SILL PL PER SHEAR PERSHEAR DISTANCE 3"OC REQUIRED AT EXTERIOR d N <br /> WALL SCHED •I A WALL SCHED HEADERS GREATER H f- <br /> I.I I, I,I I,I I,I SPACING - <br /> I•I SPAN)THAN 6' O <br /> ____.i __ _ J1__ PANELEDGE IIr. N <br /> _L L__•___•_t L______l LJ W W <br /> • NAILING PER SHEAR II <br /> II _n_r-____F•-I--T--T- WALLSCHED II TOP CHORD (6)0.131"Orz3"NAILS O d d <br /> z <br /> II II CONTINUE HOLDOWN CHORD SPLICE J AT LOCATIONS WHERE IT IS NOT POSSIBLE BOTTOM TYPICAL STUDS <br /> I j TO FOUNDATION TO INSTALLTHE SPECIFIED 0.131"0 CHORD N N <br /> SPLICE NAILS,THE CONTRACTOR SHALL SPLICE m <br /> 1L_...4a_ _1L�_____10 BEAM OR HEADER PER Q N O <br /> _ INSTALL SIMPSON C520 STRAPS EA SIDE <br /> .II I-1 I L SECTION A-A PLAN AND NOTES O^m <br /> AS SIZE AND SPACING A —III. II II OF WALL AT SPLICE.INSTALL EA STRAP <br /> CONCRETE FOOTING PER PLAN AND SHEAR II II II SCALE:11/2"=1'-0" W/(12)lOd AT EA END.WHERE BOTH <br /> ORP/T SLAB WALL SCHEDULE,TYP RIM BOARD ��� PLATES ARE CUT,INSTALL CS20 STRAPS NAILING PER TYP <br /> AT EA PLATE AND EA SIDE OF THE WALL. BUILT-UP STUD <br /> OR BLOCKING /1 Q <br /> NOTES: �� CONCRETE STEM WALL COLUMN DETAIL <br /> 1.REFER TO STRUCTURAL NOTES FOR 6'-0"MIN BETWEEN SPLICES m-L-L <br /> ADDITIONAL INFORMATION, CONCRETE FOOTING 'IL I DESIGN: RMK <br /> 2.FOR SHEAR WALLS WHERE NO HOEDOWNS SPLICES TO OCCUR AT I RIPPLE STUDS PER PLAN <br /> ARE SPECIFIED THE FIRST AS SHALL BE Q AT HOEDOWNS:PROVI DE FULL HT DRAWN: LVW <br /> LOCATED NOT MORE THAN 1'RS AND NOT — — — _ _ CENTER OF VERTICAL STUD AND COLUMN SCHEDULE OR <br /> — — HOLDOWN CHORDS PER HD SCHED. STRUCTURAL NOTES CHECK: <br /> LESS THAN(7).BOLT DIAMETER$FROM END - — .III— .III— L OTHERWISE:Ill 2x FULL HT <br /> OF WALL. TOP CHORD SPLICE BOTTOM CHORD SPLICE JOB NO: 21257.10 <br /> DATE: 07/21/21 <br /> TYPICAL SHEAR WALL DETAIL TYPICAL TOP PLATE SPLICE DETAIL TYPICAL HEADER DETAIL <br /> 1"=1'-0" <br /> {r� <br /> I <br /> - I! <br /> I <br /> EDGE NAILING PER PLAN BEAM PER PLAN <br /> 1 AND SHEAR WALL AND SCHEDULE <br /> i SCHEDULE OR EDGE NAILING PER PLAN 2x6 STUD @ 2x4 CROSS WALL SIMPSON A35 EACH <br /> STRUCTURAL NOTES,TYP AND SHEAR WALL 2x8 STUD @ 2x6 CROSS WALL JOIST DIRECTION SIDE OF BEAM <br /> SCHEDULE OR „�• PER PLAN <br /> 0.131"0 x 3" STRUCTURAL NOTES,nP NOTE: - J <br /> NAILS @ 9"OC � SUPPORTS AT SOLID �F _ <br /> POSTS SIM o a 'MN J Q <br /> - STUD WALL - p p STUD 21/2"0 MAX HOLE <br /> WALL 1/25PAN Q <br /> // ALLOWABLE DRILL AREA O L i <br /> BEAM PER PLAN J 1/3 DEPTH <br /> (2)ROWS OF 0.131"0 x 3" EDGE NAILING PER PLAN AND AND SCHEDULE <br /> �_______ _ ____� �yf <br /> L SCHEDULE OR Q MIDDLE 1/3 '^ <br /> NAILS @ 9"OC SHEAR WALL ` _ V <br /> STRUCTURAL NOTES,TYP J N <br /> SIMPSONLTP4OR A354'MIN 1/3 DEPTH <br /> W Z <br /> A35 FRAMING <br /> STUD WALL PER 0.131"0 x 3" ANCHOR EACH SIDE <br /> FRAMING PLAN NAILS @ 9"OC OF BEAM Z j Q1 <br /> N07ES,TYP NOTE: <br /> STUD WALL PER FRAMING HOLES DRILLED THRU JOISTS SHALL BE <br /> PLAN NOTES,TYP 1/3 SPAN _ <br /> I LOCATED IN THE MIDDLE THIRD OF Q � Q NN <br /> 1 3 SPAN 1/3 SPAN THE JOIST DEPTH&MIDDLE THIRD OF L.L <br /> SHEATHING(OR GWB)AND j MIDDLE THE JOISTSPAN,BUT NOTTHE EXACT <br /> NAILING PER PLAN AND SHEAR SHEATHING OR GWB)AND SOLID OR MULTIPLE SOLID OR MULTI-LE SPAN, W -�• <br /> WALL SCHEDULE OR NAILING PER PLANAND SHEAR CENTER-AN.CONTRACTOR SHALL <br /> STUD COLUMN PER PLAN STUD COLUMN PER PLAN <br /> STRUCTURAL NOTES,TYP WALL SCHEDULE OR BEAM WIDTH, MINIMIZE HOLE SIZE F POSSIBLE. <br /> STRUCTURAL NOTES,T'fP MIN UNO CONTACT ENGINEER FOR DRILLING Y CV L~ 0 <br /> OUTSIDE AREA SHOWN <br /> A.CORNER INTERSECTION B.'T'INTERSECTION PARALLEL TO STUD WALL PERPENDICULAR TO STUD WALL < I o ; O <br /> a TYPICAL WALL INTERSECTION DETAIL ,� TYPICAL FLUSH BEAM SUPPORT DETAILS GUIDELINES FOR HOLES DRILLED THRU JOISTS N �I <br /> SCALE: 1"=1'•0" <br /> Q SCALE: 1"=1'-0" SHEET: <br /> S 1 r1 <br />