My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3010 51ST PL SW 2025-01-30
>
Address Records
>
51ST PL SW
>
3010
>
3010 51ST PL SW 2025-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 8:44:30 AM
Creation date
1/24/2025 12:03:52 PM
Metadata
Fields
Template:
Address Document
Street Name
51ST PL SW
Street Number
3010
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Details: <br /> * Excavation: Excavate up to the required depth(up to 7 inches).Saw Cut asphalt up to 3" and bottom subbase 2-3". Ensure the <br /> bottom is level. * Haul demo * Pay dump Fees * Formwork:Create a form using wooden or metal boards to contain the concrete. <br /> Make sure the form is properly aligned and securely braced. *Subbase: Install new 5/8 minus gravel base 2-3"thick. * <br /> Reinforcement: Place reinforcing steel(Rebar#3)within the form to enhance the strength of the concrete as boats and RV's will travel <br /> over it. * Pouring Concrete:Jireh will pour 4000 PSI concrete up to 5" into the formwork. Using a concrete truck chute concrete will <br /> be spread with applicable tools to distribute the concrete evenly. * Leveling and Screeding: If applicable, Level the concrete surface <br /> using a screed board to achieve a smooth,flat finish. * Finishing: Finish of the surface to be Broom Finish. *Slope:Slope to be <br /> adequate for proper transition between asphalt road and new proposed driveway. *Curing:Allow the concrete to cure for the <br /> recommended time.This may involve covering it with wet burlap or using curing compounds. Recommended 7-12 days of no <br /> vehicular traffic and 48-72 hours of no pedestrian traffic. * Broom Finish Driveway Slab SQFT:Approximately 800 SQFT(36'x 22') <br /> Project timeline: 1-2 days * Parking available:Available, residential street. * Machine Access:Available,property has Great access <br /> //// * Excavation: Excavate up to the required depth (up to 8 inches).Saw Cut Concrete walkway up to 4" and bottom subbase 2-3". <br /> Ensure the bottom is level. * Haul demo * Pay dump Fees * Formwork:Create a form using wooden or metal boards to contain the <br /> concrete. Make sure the form is properly aligned and securely braced. *Subbase: Install new 5/8 minus gravel base 2-3"thick. * <br /> Reinforcement: Place interconnecting reinforcing steel (Mesh)within the form to enhance the strength of the concrete as boats and <br /> RV's will travel over it. * Pouring Concrete:Jireh will pour 4000 PSI concrete up to 4" into the formwork. Using a concrete truck chute <br /> concrete will be spread with applicable tools to distribute the concrete evenly. * Leveling and Screeding: If applicable, Level the <br /> concrete surface using a screed board to achieve a smooth,flat finish. * Finishing: Finish of the surface to be Broom Finish. *Slope: <br /> Slope to be adequate for proper transition between new proposed concrete driveway and new proposed concrete walkway&ramp. <br /> * Curing:Allow the concrete to cure for the recommended time.This may involve covering it with wet burlap or using curing <br /> compounds. Recommended 48-72 hours of no pedestrian traffic. * Medium Broom Finish Walkway SQFT:Approximately 130 SQFT <br /> (6.5'x 20') * Broom Finish Ramp SQFT:Approximately 60 SQFT(5'x 11) * Project timeline: 1-2 days * Parking available:Available, <br /> residential street. * Machine Access:Available, property has Great access///// ** EXTENSION OF DRIVEWAY*** * Excavation: <br /> Excavate up to the required depth(up to 7 inches). Ensure the bottom is level and following grade. * Haul demo * Pay dump Fees <br /> Formwork:Create a form using wooden or metal boards to contain the concrete. Make sure the form is properly aligned and securely <br /> braced. *Subbase: Install new 5/8 minus gravel base 2-3"thick. * Reinforcement: Place reinforcing steel(Rebar#3)within the form <br /> to enhance the strength of the concrete as boats and RV's will travel over it. * Pouring Concrete:Jireh will pour 4000 PSI concrete up <br /> to 5" into the formwork. Using a concrete truck chute concrete will be spread with applicable tools to distribute the concrete evenly. <br /> * Leveling and Screeding: If applicable, Level the concrete surface using a screed board to achieve a smooth,flat finish. * Finishing: <br /> Finish of the surface to be Broom Finish. *Slope:Slope to be adequate for proper transition between asphalt road and new proposed <br /> driveway. *Curing:Allow the concrete to cure for the recommended time.This may involve covering it with wet burlap or using <br /> curing compounds. Recommended 7-12 days of no vehicular traffic and 48-72 hours of no pedestrian traffic. * Medium Broom Finish <br /> Extension of Driveway SQFT:Approximately 550 SQFT(42'x 13') * Project timeline: 1-2 days * Parking available:Available, <br /> residential street. * Machine Access:Available, property has Great access//// *** EXTENSION OF ASPHALT APRON *** * <br /> Excavation: In applicable location excavate up to the required depth(up to 7")for proper patch install.Saw cut and remove 12 feet of <br /> extruded Curb. Ensuring the bottom is level and following grade. * Haul demo * Pay dump Fees * Base Preparation: Lay a base <br /> material made of 5/8 minus gravel or applicable,compacting it well. * Gravel Application:Spread the 5/8 minus gravel evenly,aiming <br /> for a thickness of 2-3" * Compaction:Compact the gravel using a vibrating plate compactor for stability. * Non-Permeable Asphalt <br /> Installation:At various locations supply and apply up 4" asphalt mix(Class B)Compact it thoroughly,ensuring proper thickness and <br /> smoothness. * Edges: Utilizing the appropriate material to seal all edges(per code) * Maintenance: Patch work requires sealcoat <br /> every 6-12 months giving it longevity. * Patch work Approximate Square Footage:40 SQFT(3'x 13') * Project timeline:TBD * Parking <br /> available:Yes * Machine access:Available <br /> SCHEDULED DATE I COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> T <br /> Printed: Monday,09 December, 2024 2 of 3 F <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.