Laserfiche WebLink
Category 2:Sensitive information <br /> 51212024 2:56:41 PM (Etrakit Public Registration) <br /> * Excavation: Excavate up to the required depth (up to 7 inches). Saw Cut asphalt up to 3" and bottom <br /> subbase 2-3". Ensure the bottom is level. * Haul demo * Pay dump Fees * Formwork: Create a form using <br /> wooden or metal boards to contain the concrete. Make sure the form is properly aligned and securely <br /> braced. * Subbase: Install new 5/8 minus gravel base 2-3" thick. * Reinforcement: Place reinforcing steel <br /> (Rebar#3) within the form to enhance the strength of the concrete as boats and RV's will travel over it. * <br /> Pouring Concrete: Jireh will pour 4000 PSI concrete up to 5" into the formwork. Using a concrete truck chute <br /> concrete will be spread with applicable tools to distribute the concrete evenly. * Leveling and Screeding: If <br /> applicable, Level the concrete surface using a screed board to achieve a smooth, flat finish. * Finishing: <br /> Finish of the surface to be Broom Finish. * Slope: Slope to be adequate for proper transition between <br /> asphalt road and new proposed driveway. * Curing: Allow the concrete to cure for the recommended time. <br /> This may involve covering it with wet burlap or using curing compounds. Recommended 7-12 days of no <br /> vehicular traffic and 48-72 hours of no pedestrian traffic. * Broom Finish Driveway Slab SQFT: Approximately <br /> 800 SQFT (36' x 22') * Project timeline: 1-2 days * Parking available: Available, residential street. * Machine <br /> Access: Available, property has Great access//// * Excavation: Excavate up to the required depth (up to 8 <br /> inches). Saw Cut Concrete walkway up to 4" and bottom subbase 2-3". Ensure the bottom is level. * Haul <br /> demo * Pay dump Fees * Formwork: Create a form using wooden or metal boards to contain the concrete. <br /> Make sure the form is properly aligned and securely braced. * Subbase: Install new 5/8 minus gravel base 2- <br /> 3" thick. * Reinforcement: Place interconnecting reinforcing steel (Mesh) within the form to enhance the <br /> strength of the concrete as boats and RV's will travel over it. * Pouring Concrete: Jireh will pour 4000 PSI <br /> concrete up to 4" into the formwork. Using a concrete truck chute concrete will be spread with applicable <br /> tools to distribute the concrete evenly. * Leveling and Screeding: If applicable, Level the concrete surface <br /> using a screed board to achieve a smooth, flat finish. * Finishing: Finish of the surface to be Broom Finish. <br /> Slope: Slope to be adequate for proper transition between new proposed concrete driveway and new <br /> proposed concrete walkway & ramp. * Curing: Allow the concrete to cure for the recommended time. This <br /> may involve covering it with wet burlap or using curing compounds. Recommended 48-72 hours of no <br /> pedestrian traffic. * Medium Broom Finish Walkway SQFT: Approximately 130 SQFT(6.5' x 20') * Broom <br /> Finish Ramp SQFT: Approximately 60 SQFT (5' x 11) * Project timeline: 1-2 days * Parking available: <br /> Available, residential street. * Machine Access: Available, property has Great access///// ** EXTENSION OF <br /> DRIVEWAY *** * Excavation: Excavate up to the required depth (up to 7 inches). Ensure the bottom is level <br /> and following grade. * Haul demo * Pay dump Fees * Formwork: Create a form using wooden or metal <br /> boards to contain the concrete. Make sure the form is properly aligned and securely braced. * Subbase: <br /> Install new 5/8 minus gravel base 2-3" thick. * Reinforcement: Place reinforcing steel (Rebar#3) within the <br /> form to enhance the strength of the concrete as boats and RV's will travel over it. * Pouring Concrete: Jireh <br /> will pour 4000 PSI concrete up to 5" into the formwork. Using a concrete truck chute concrete will be spread <br /> with applicable tools to distribute the concrete evenly. * Leveling and Screeding: If applicable, Level the <br /> concrete surface using a screed board to achieve a smooth, flat finish. * Finishing: Finish of the surface to be <br /> Broom Finish. * Slope: Slope to be adequate for proper transition between asphalt road and new proposed <br /> driveway. * Curing: Allow the concrete to cure for the recommended time. This may involve covering it with <br /> wet burlap or using curing compounds. Recommended 7-12 days of no vehicular traffic and 48-72 hours of <br /> no pedestrian traffic. * Medium Broom Finish Extension of Driveway SQFT: Approximately 550 SQFT (42' x <br /> 13') * Project timeline: 1-2 days * Parking available: Available, residential street. * Machine Access: <br /> Available, property has Great access//// *** EXTENSION OF ASPHALT APRON *** * Excavation: In applicable <br /> location excavate up to the required depth (up to 7") for proper patch install. Saw cut and remove 12 feet of <br /> extruded Curb. Ensuring the bottom is level and following grade. * Haul demo * Pay dump Fees * Base <br /> Category 2: For official use only/disclosure permissible by law. <br />