My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2810 COLBY AVE 2025-01-30
>
Address Records
>
COLBY AVE
>
2810
>
2810 COLBY AVE 2025-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 9:15:47 AM
Creation date
1/24/2025 1:09:54 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2810
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE ICE CREAM BAR - WALL SIGN FACADE AREA <br /> FASTS/GNS� <br /> E V E R E T T <br /> PHOTO MOCK- UP ( NOT TO SCALE) <br /> PROPOSED WALL SIGN LINEAR FOOTAGE <br /> CLIENT: <br /> -- �._ ,�I ' THE ICE CREAM BAR <br /> -- - - - _ - - - - TV <br /> t _ _ <br /> ' FILE NAME: <br /> • i DIMENSIONAL LETTERING <br /> WALL SIGN <br /> PROJECT: <br /> v <br /> 1 SIGN PERMIT <br /> i Q VERSION: <br /> 80 4 <br /> .� N1HE <br /> V V DATE 08/14/2024 <br /> C6 <br /> PROJECT MANAGER: <br /> $''2' �u �- Michael Granese <br /> DESIGNER: <br /> TSP <br /> t a N <br /> rl' oil . 01 <br /> ry J !� i <br /> �Yi 'Rrl� rY r111[ REVISIONSSUBMITTAL <br /> P�a�0i 0 <br /> .�`•r •.�.... , <br /> NORTH SIDE 1 APPROX. TOTAL SO. FT. • <br /> 24' 2" (W) X APPROX 81' 2" (H) = 1,954.76 FT BY <br /> DATE <br /> PROPOSED WALL SIGN AS SHOWN <br /> 150.47" (W) X 38.1" (H) X 2" = 39.8 SQ. FT. WITH REVISIONS AS NOTED <br /> At FASTSIGNS,we take pride in precision,but the final examination for accuracy is your responsibility.Before giving approval,please examine all proofs carefully for the accuracy of information presented,as well as spelling, punctuation, <br /> numbers,graphics,colors, room numbers,install locations and general layout.In the event that we have miscommunicated regarding your original design,we will be happy to provide a second proof free of charge if needed.If further Page 3 Of 5 <br /> revisions are required after approval has been received,additional charges will be incurred.Our normal production cycle will begin from the date approval is received.We cannot accept changes or approvals verbally. <br />
The URL can be used to link to this page
Your browser does not support the video tag.