My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W B FAST SIGNS 2025-04-22
>
Address Records
>
36TH AVE W
>
5900
>
FAST SIGNS
>
5900 36TH AVE W B FAST SIGNS 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 8:14:59 AM
Creation date
1/24/2025 1:11:43 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Unit
B
Tenant Name
FAST SIGNS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ■ ■ ■ <br /> FASTS/GNS. <br /> E V E R E T T <br /> ARJO <br /> 5723 <br /> oun W <br /> R-5 ADDRESS: 5900 36th Ave West Bldg B, Suite 100, Everett, WA 98203 <br /> 5719 <br /> 5711 PARCEL #: 28040300200100 CLIENT: <br /> ARJO <br /> ZONE: L12 <br /> SIGN CATEGORY: B FILE NAME: <br /> 5900 WALL SIGN, NOT ILLUMINATED <br /> B <br /> ® <br /> 120"W X 60"H WALL SIGN, NOT ILLUMINATED PROJECT:� SIGN PERMIT <br /> VERSION: <br /> 4 <br /> D • 08/05/2024 <br /> 5900 <br /> C <br /> PROJECT MANAGER: <br /> Krystina Weatherson <br /> SATELLITE VIEW <br /> DESIGNER: <br /> TSP <br /> SUBMITTAL REVISIONS <br /> SITE PLAN VIEW - PARCEL MAP --- <br /> BLDG. A <br /> — BY <br /> � + ' BLDG. B DATE <br /> i <br /> eti r .M AS SHOWN <br /> N �� WITH REVISIONS AS NOTED <br /> �' <t BLDG. C <br /> O <br /> O <br /> At FASTSIGNS,we take pride in precision,but the final examination for accuracy is your responsibility.Before giving approval,please examine all proofs carefully for the accuracy of information presented,as well as spelling,punctuation, <br /> numbers,graphics,colors,room numbers,install locations and general layout.In the event that we have miscommunicated regarding your original design,we will be happy to provide a second proof free of charge if needed. If further Page 2 Of S <br /> revisions are required after approval has been received,additional charges will be incurred.Our normal production cycle will begin from the date approval is received.We cannot accept changes or approvals verbally. <br />
The URL can be used to link to this page
Your browser does not support the video tag.