My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 75TH ST SE 2025-01-30
>
Address Records
>
75TH ST SE
>
1802
>
1802 75TH ST SE 2025-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 9:24:56 AM
Creation date
1/24/2025 1:16:11 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
1802
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m wo <br /> N CREEK <br /> \ rru <br /> ~w <br /> I <br /> wh• • • IILA <br /> 2SEAy �� ¢GENERAL NOTES o Z� <br /> MUKILTEO m �� Q U O <br /> `Q `"� 1. ALL CONSTRUCTION WORK SHALL COMPLY WITH ALL FEDERAL,STATE wAND LOCAL CODES. ORDINANCES,RULES AND REGULATIONS:WASHINGTON STATE ENERGY CODE �U> <br /> ASHRAE-AMERICAN SOCIETY OF HEATING, REFRIGERATION AND U N w <br /> AIR-CONDITIONING ENGINEERS 0 <N <br /> IBC-INTERNATIONAL BUILDING CODE AS AMENDED BY WA.STATE <br /> ❑ BOEING Q srti NEC-NATIONAL ELECTRICAL CODE <br /> ST NE NFPA-NATIONAL FIRE PROTECTION ASSOCIATION <br /> NECA-NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION <br /> o UL-UNDERWRITERS LABORATORIES,INC. <br /> 0 2. THE CONTRACTOR SHALL BE RESPONSIBLE OF ALL SUBCONTRACTORS <br /> AND MATERIAL SUPPLIERS TO EXAMINE CAREFULLY EACH PAGE OF <br /> �w N PR JECT DRAWINGS AND SPECIFICATIONS,AND REFER TO ALL NOTES AND DETAILS. <br /> SITE ANY DISCREPANCIES SHALL BE REPORTED DURING THE CONSTRUCTION <br /> PUBLIC • BIDDING PROCESS. NO CHANGE ORDERS SHALL BE ALLOWED FOR <br /> FAILURE TO DETERMINE THE SCOPE OF WORK REQUIRED.ALL <br /> CONTRACTORS AND MATERIAL SUPPLIERS WILL BE RESPONSIBLE FOR <br /> PROTECTING EXISTING AREAS AND OTHER ITEMS FROM MARS,STAINS <br /> 526 AND OTHER DAMAGE RESULTING FROM THEIR PERFORMANCE ON THIS <br /> 526 m PROJECT. <br /> 3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS <br /> PRIOR TO PERFORMING ANY WORK. ALL DISCREPANCIES SHALL BE <br /> REPORTED TO THE DISTRICT PROJECT MANAGER BEFORE OR DURING <br /> WALTER E HALL LEGAL DESCR/PT/ON CONSTRUCTION PRIOR TO COMMENCING WITH THE WORK. W <br /> RECREATION AREA 4. ALL DEMOLITION DEBRIS TO BE REMOVED FROM THE DISTRICT PROPERTY <br /> AND GOLF COURSE IN AN ACCEPTABLE MANNER AND DISPOSED OF IN A FACILITY LICENSED <br /> SNOHOMISH COUNTY PUD-OPERATIONS CENTER TO ACCEPT THE SPECIFIC DEBRIS. <br /> z <br /> a THAT PORTION OF LOTS 3-6 INCLUSIVE,25-31 INCLUSIVE,BEVERLY BERRY 5. CONTRACTOR SHALL USE CONSTRUCTION METHODS AND MATERIALS TO w <br /> TRACTS DIVISION NO.2,AS RECORDED IN VOLUME 10 OF PLATS,PAGE 20, MATCH EXISTING CONDITIONS IN SURROUNDING AREAS UNLESS <br /> RECORDS OF SNOHOMISH COUNTY,WASHINTON,LYINGEASTERLY OF 20TH OTHERWISE SPECIFIED IN DRAWINGS AND SPECIFICATIONS. IF THERE IS <br /> AVENUE WEST AND NORTHERLY OF SR 526,EXCEPT THAT PORTION THEREOF u <br /> a DEEDED AS 80TH STREET S.W.;ALSO THAT PORTION OF THE W 1/2 OF THE NO SIMILAR CONDITION IN THE AREA OF CONSTRUCTION TO USE AS AN <br /> SW 1/4 OF SECTION 11,TOWNSHIP 28 NORTH,RANGE 4 EAST,W.M.,LYING EXAMPLE OR IF THERE IS MORE THAN ONE TYPE,CONTACT THE DISTRICT O <br /> EASTERLY OF 20TH AVENUE WEST. PROJECT MANAGER FOR DIRECTION BEFORE PROCEEDING WITH THE WORK. <br /> N TAX ID#:00392200000300 6. THE CONTRACTOR SHALL PROVIDE THE DISTRICT WITH A COPY OF THEIR <br /> COMPANY SAFETY MANUAL PRIOR TO MOVING ON SITE. SAFETY AND PUBLIC <br /> NORTH p 100TH ST SW PROTECTION IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. <br /> 7. THE CONTRACTOR SHALL BECOME FAMILIAR WITH AND COMPLY WITH ALL <br /> A VICINITY MAP DISTRICT SAFETY POLICIES DURING THE PROJECT. <br /> 8. THE CONTRACTOR SHALL PERFORM ALL WORK DURING NORMAL BUSINESS <br /> HOURS UNLESS OTHERWISE SPECIFIED/APPROVED BY PROJECT MANAGER. <br /> 9. THE CONTRACTOR SHALL PROTECT ALL VEGETATION SURROUNDING THE <br /> BUILDING. <br /> N <br /> 16TH AVE.W. <br /> I <br /> FI <br /> AMMLL <br /> 1 � u U � IIIIIIII U 1 <br /> 0 0 0 HfHI�-f � e I <br /> 0 <br /> 0 0 L41 <br /> D IIIIIII p <br /> AREA OF WORK I I I I I U D y) <br /> PROJECT MANAGER: <br /> 1�w o <br /> Q I Kasey Westfa// W I�cn CO <br /> 0 U 0 / CELL: (425)758-5963 !��0�<I <br /> 0 O o 0 OFFICE: (425)783-1915 'y=U)> <br /> EMAIL: kkwesffall@snop L4 It <br /> tW <br /> �~\ 0' <br /> WAREHO G E I ' / V` I Q <br /> BUILDI / L �INIW <br /> w W��COQ> <br /> 0 W <br /> \ o <br /> a <br /> — _ _ _ _ _ — _ ©~ SHEET TITLE:VENT REROUTE <br /> Z TITLE PAGE <br /> SEAWAY BLVD.(20TH AVE.WEST) <br /> I(� _ <br /> CONTACTXASEY WESTFALL-- <br /> DRAFTER:CHRIS BALLOU -- <br /> DATE: 7/10/2024 <br /> SHEET:1 TITLE PAGE <br /> E SITE PLAN T1 .0 <br /> SHEET-1 OF $ <br />
The URL can be used to link to this page
Your browser does not support the video tag.