Laserfiche WebLink
0 <br /> WINDOW FLASHING INSTALLATION SEQUENCE WEATHER RESISTIVE BARRIER INSTALLATION m <br /> NOTES: <br /> NOTES: <br /> 1. W.R.B.INSTALLATION SHOWN IS BASED ON FORTIBER a <br /> 1. WINDOW FLASHING SEQUENCE SHOWN IS BASED ON BUILDING SYSTEM'S 2 PLY SUPER JUMBO TIX 60 MIN.SYSTEM. <br /> FOR71BER BUILDING SYSTEM'S HIGH PERFORMANCE WINDOW INSTALL ALL INDICATED PRODUCTS IN CONFORMANCE WITH <br /> FLASHING SYSTEM.INSTALL ALL INDICATED PRODUCTS IN MANUFACTURER'S RECOMMENDATIONS&REQUIREMENTS. <br /> REGISTERED CONFORMANCE WITH MANUFACTURER'S RECOMMENDATIONS <br /> A Cy IT &REQUIREMENTS. <br /> LC / 2. INSTALLATION SEQUENCE IS DESIGNED FOR INTEGRAL <br /> iha�i; c�AN'„L� FLANGED WINDOW APPLICATIONS,WHERE WINDOW IS <br /> INSTALLED BEFORE THE WEATHER RESISTIVE BARRIER IS <br /> $TAT= F WASyINGMN APPLIED <br /> WRB CONT.BEHIND m <br /> THE UNDERSIGNED HAS PROVIDED BUILDING THRU-WALL FLASHINGS w E <br /> ENCLOSURE DOCUMENTS THAT IN MY 7EXTEND 6' < <br /> PROFESSIONAL JUDGEMENT ARE APPROPRIATE MINIMUM ABOVE WRB LAPS <br /> TO SATISFY THE REQUIREMENTS OF RCW TOP OF ROUGH THRU-WALL -- <br /> 64.55.005 THROUGH 64.55.090 ALIGN FLUSH WITH O OPENING FLASHINGS <br /> ROUGH OPENING SILL, <br /> LEAVE BOTTOM EDGE <br /> FREE.EXTEND 12" EXTEND 12" (qp <br /> MINIMUM BELOW <br /> MIN.BEYOND JAMB x �' - <br /> BOTTOM OF <br /> EDGE BOTH SIDES. O r r <br /> ROUGH OPENING; w _LEAVE FLASHING <br /> FREE AT BOTTOM <br /> 1 WASHINGTON STATE PROFESSIONAL STAMP O <br /> N.T.S. `" N O o <br /> To seal the W.R.B.around all electncal, CUT HOLE FOR METAL VENT ' N <br /> HVAC,plumbing or other penetrations: PENETRATION SHROUD W MIN.' <br /> VERTI1. CAL usaM <br /> sealant. <br /> lropen gaps with low expansion foam [I(IF <br /> z 1. INSTALL 9"MOISTOP PF 2. INSTALL 9"MOISTOP PF t OVERLAP <br /> FLASHING PRESTRIP AT FLASHING PRESTRIP AT <br /> 2.After the foam sealant has hardened, BASE SILL JAMBS <br /> trim off any excess material. W.RB. APPLY 6"STRIPS <br /> PRE-STRIPPED, OFS.A.M. TRIP <br /> 3.Flash around the penetration with an SIZE TO BE 12" <br /> approved sealant,S.A.M.or preformed 0 EACH DIRECTION) 0 THE FLANGE i <br /> accessories made for this purpose. ONTO W.R.B. I <br /> A.When using tape or flashing start at the <br /> bottom of each penetration. SEALANT <br /> B After the first layer,apply sealant over <br /> the slit in the flashing W.R.B.PRE-STRIP BETNEENS.A.M. <br /> C Shingle another layer of flashing over &FIELD W.R.B. <br /> the bottom AT HEAD THRU-WALL FLASHINGS <br /> layers for proper drainage. FIELD W.R.B.AT ATFLOORLINESAND <br /> HEAD WHERE INDICATED 12"WEAVE AT OUTSIDE /Y <br /> 4.Apply the weather-resistive bamer over TAPEW.R.B. CORNERS PER MFR. L.L <br /> the Flashed penetration. I n PRE-STRIP TO "7,r INSTALL T w <br /> Products with Flanges should be integrated FIELD W.R.B.AT METAL HOOD 1 1 <br /> into the air barrier system using S.A.M. ,'r,t JAMBS AND <br /> Follow shingle lapping procedures and SILLS(TYP.) <br /> sequencing as in a window installation. FIELD W.R.B. CONS.ING AT RASE <br /> Q L.L <br /> 0 TUCKED UNDER q O FLASHING AT BASE LLI Q <br /> See detail for hood fabrication. W.R.B.PRE- Q �� m <br /> STRIP AT SILL& <br /> JAMBS <br /> CONTINUOUS <br /> 2 PENETRATION FLASHING BEAD OF SEALANT <br /> N.T.S. s <br /> O EXTEND 3"MINIMUM BEYOND EXTEND 3"MINIMUM <br /> TOP AND BOTTOM EDGES OF BEYOND EDGE OF <br /> 5 WINDOW FLANGE PRESTRIPPING <br /> FASTEN THROUGH RETURN <br /> 3. APPLY 3/8"BEAD T W <br /> PA TIGHT HEM ON BACKSIMOISTOP SEALANT 70 THE f"r <br /> PAN UPSTAND 4" BACKSIDE OF WINDOW L.L <br /> 4" MOUNTING FLANGE O J <br /> 4. INSTALL WINDOW INTO 1j'p J <br /> ROUGH OPENING PER C = <br /> ?'0 WINDOW MFR.'S L <br /> RECOMMENDATIONS <br /> 5. WIPECLEANWINDOW <br /> FLANGE AND 7, INSTALL 12"MOISTOP E-Z SEAL <br /> 3 <br /> .a 6. INSTALL 6"MOISTOP E- <br /> yr;,;;% PRESTRIPPING TO PREP Lll <br /> �I( FOR SUBSEQUENT Z SEAL OVER JAMB WINDOW HEAD,LAPPING OVER CJ <br /> JQS��OAC °pP'�� FLASHING WINDOW FLANGES AND SEALING TO TOP OF WINDOW z W V <br /> FLANGE. O > Q <br /> U <br /> M"" Z as <br /> NOTES WM <br /> 1.MATERIAL TO BE 24 GA GALV. W <br /> STEEL -COORDINATE <br /> 2.SEAMS TO BE SOLDERED DIMENSION OF <br /> LOWER FLASHING <br /> LEG V OPERATION <br /> z <br /> OF WINDOW/DOOR <br /> z METAL SILL PAN,TYP.AT EXTR.DOORS FOLDED,UNBROKEN <br /> a <br /> N.T.S. END DAM a r <br /> V2°q„ r� <br /> E d <br /> - HEAD DEPTH VARIES m <br /> 10 <br /> t LAP WEATHER pays <br /> 4„ BARRIER OVER a <br /> HEAD FLASHING <br /> 1W O <br /> JOB NO.: <br /> 22205 <br /> TO FTT ��. - <br /> l0 1/2"MIN. \ PLOT DATE <br /> �vT (2"PREF.) \ 12/5/2023 42221 PM <br /> 1/2"DRIP EDGE <br /> E 1fl! F\ WITH 318"HEM DATE: 06/08/2023 <br /> .� SCALE: As Indicated <br /> B. INSTALL PREFINISHED METAL 8. INSTALL WEATHER 10. CONTINUE INSTALLING "-DRAWN: MIS <br /> HEAD FLASHING BARRIER STARTING WEATHER BARRIER IN CHCKD: TM <br /> NOTES FROM BASE OF WEATHERBOARD FASHION,LAP <br /> 1.MATERIAL TO BE 24GA OR HEAVIER GALV.OR PRE- WALL;TUCK UNDER COURSE OVER HEAD FLASHING GENERAL SHEETS <br /> FINISHED STEEL. PRESTRIPPING AT SHEET NO.: <br /> 2.END DAMS TO BE BENT AND CRIMPED. SILL <br /> HEAD FLASHING,TYP.@ DOOR&WINDOW G WEATHER BARRIER INSTALLATION <br /> N.T.S. •! 12"=1'-0" <br />