Laserfiche WebLink
0 <br /> wry <br /> r0 <br /> jo <br /> Nm <br /> W >Z <br /> =l <br /> —mW V tz <br /> _ug <br /> wN <br /> v_ 3 <br /> w <br /> a =w <br /> m° <br /> m <br /> N <br /> S <br /> 3, <br /> u_ <br /> ti <br /> 1 <br /> 15666 <br /> rix <br /> E,k T <br /> -- - _ <br /> ~/am <br /> M <br /> P1-6 w 0 <br /> 4 0-1 <br /> � �ooA I Q <br /> 5^ 7 C7 <br /> I G� <br /> Li O Z <br /> I i Z O <br /> ALL FRAMING OR HARDWARE ALL FRAMING OR HARDWARE i Q <br /> NOT SHOWN OR SPECIFIED NOT SHOWN OR SPECIFIED SD7 Z <br /> TO REMAIN UNCHANGED TO REMAIN UNCHANGED - I I > <br /> 4LUJ <br /> I I w J W <br /> I a � <br /> i <br /> I I II <br /> I I <br /> z W <br /> FOUNDATION PLAN NOTES: O LL- <br /> �I 1. lab on- rade shall be 4 tFi ck.Slab shall be pour etl aver F ee Graining Granu ar Fill per Geotechnical Report See Architectural z Q <br /> _ - Dw ngs for Slab Elevafon,Depre D. ssion,and Slope requ rements <br /> Z b pp x ma y q re and 400-sf or 1 t reCommentled to control cracking,When us Q Q _r— —— o Construction/Control Jomt'n Slabs are optional but king.W eq stab areas between joists shall <br /> L, o —— <br /> - -- be ro tel s ua ess <br /> -.— - iv --` P1- a U <br /> 3 The Contractor shall determine actual footing elevalons based on final grades and site conditions.Botlom of Footings shall be set z n Z <br /> P properly bearingDepth. D 0 <br /> on competent, d graded bear n 1 below Frost <br /> 4. Anchor Bolls for Exterior Stud Walls shall be in accordance with Pt-b of the Shear Wall Schedule of VS06,u.o.n. F- <br /> 5. See 10/S06 for Simpson to USP hardware conversion table. O U <br /> 3-CAR GARAGE OPTION-ELEV.'B' EXTENDED GARAGE OPTION-ELEV.'B' LL <br /> LEGEND <br /> XX � <br /> SX.X DETAIL CALL-OUT <br /> 1®- ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 1/S06 <br /> SLAB-ON-GRADE PER PLAN NOTE i Fa- <br /> LJ FOUNDATION WALL <br /> N <br /> F <br /> RAISED FOUNDATION WALL <br /> K <br /> W <br /> 0 BEARING OR SHEAR WALL ABOVE d <br /> w o <br /> N <br /> CRAWL SPACE POST BELOW <br /> X% FOOTING CALL-OUT SEE 5/S07 W o <br /> K <br /> STEP STEP TOP OF STEM WALL <br /> 0 1 2 4 8 16 S02.1 B <br />