Laserfiche WebLink
RIDGE <br /> RIDGE <br /> 12 <br /> 9 <br /> E35 41TYP <br /> 2C � Q <br /> - UPPER PLATE TYP UPPER PLATE - <br /> WOW NDR5 11CH HDR5 Lu <br /> IIInnIIiI � - <br /> m m l L <br /> - DRYER VENT <br /> (O <br /> �1 UPPER FLOOR FDrc F UPPER FLOOR 12 <br /> MAIN PLATE -.. ❑ <br /> _ MAIN PLATE - ❑ - `....'-'__ __ ---. . _.. KITCHEN Q <br /> WDW NDR5 �_.- WDW HDR5 -.-_ HOOD <br /> L U <br /> m <br /> :a <br /> yN5 UTILITY <br /> - AIO LAYOUT <br /> MAIN FLOOR <br /> WAIN FLOUR - -- . <br /> FRONT REAR <br /> SIDE ELEVATION IAIco <br /> �R = <br /> SCALE: I/4"=I'-0' <br /> z � <br /> z <br /> z ' <br /> UPPER PLATE <br /> WOW HORS <br /> COPIRIGHT NOTICE.T415 <br /> PLAN 15 OWNED BY PACIFIC <br /> RIDGE 4CHE5,USE OF T415 <br /> PLPN 15 PIMIBTFED BY LPN <br /> BEDROOM 4 MASTER WITHOUT PAYMW OF <br /> BEDROOM LC a FEE To PACIFtC <br /> RIDGE Woms <br /> ELEVATION NOTE5: PLAN SUMMARY <br /> L CONTRACTOR SHALL VERIFY ALL NOTES,MATERIALS t CONDITIONS PRIOR TO UPPER FLOOR WA <br /> CONSTRICTION. 15 MAIN PLATE <br /> 2. CAULK ALL EXTERIOR JOINTS t PENETRATIONS. <br /> 3. PROVIDE GALVANIZED OR ANODIZED SHEET METAL FLASHING t COUNTER �:� -------- WDW HDR5 <br /> - 806 <br /> FLASHING @ ALL ROOF PENETRATIONS,CHIMNEYS t SKYLIGHTS. -La wrn uva w.rt <br /> 4. PROVIDE CONTINUOUS GUTTERS It DOWNSPOUTS @ ALL EAVES,TYP. I �)a; 1075 <br /> 5. PROVIDE HEADER FLASHING @ ALL DOORS,WINDOWS t SHUTTERS PER DETAIL 99= mu.xumer.. <br /> b. ALL PAPER AND TAPE TO LAP FROM TOP DOWN FO E a` GREAT ROOM TI881 <br /> 7. HOLD ALL SIDING MATERIAL V,'OFF ROOF — 1,2,3,ETC= wPa PwPnrt. <br /> 8. HOLD ALL SIDING MATERIAL b°OFF FINISHED GRADE _' RISER COUNT - 424 <br /> 9. SOFFIT ALL FLAT AREAS w/1°OVERHANG @ HORIZ.EWES _= ISR.I47 Iri,T— <br /> I0. METAL FLASHING @ ALL HORIZ.TRIM t SIDING BREAKS 3 r ELECTRIC <br /> It. RUN 2ND LAYER OF TAR PAPER VERT.@ INTERIOR t EXTERIOR CORNERS <br /> UNLESS TAR PAPER 15 CONTINUOUS MAIN FLOOR � ''� <br /> 12. FOUNDATION VENTS TO BE SPACED PER PLAN - - - JWA <br /> 13. ALL FOUNDATION VENTS ON STREET SIDE OF HOUSE I.E.FRONT VOR SIDE t <br /> GABLE END t GARAGE FRESH AIR VENTS TO BE LOUVERED CRAWL 5PACE BTL ENGINEERING <br /> 14. EXTERIOR LIGHT BLOCKS AT ALL FRONT ENTRY'S SHALL BE INSTALLED AT <br /> T-0 A,F.F. SEE PEV15ION LOG <br /> 15. THE TOP OF THE EXTERIOR LIGHT BLOCKS AT GARAGE SHALL ALIGN WITH SECTION V A—A SCA1v1•UN <br /> TOP OF THE GARAGE DOOR TRIM LE:Y° <br /> 16. ALL LIGHT BLOCKS ON STONE FACADE TO BE FURRED OUT AN ADDITIONAL 1F' SCALE. I/4° <br /> 21. GUTTERS TO LAP UNDER DRIP EWE @ EAVES.HOLD Vs°DRIP EWE OUT Y° <br /> AWAY FROM FASCIA TO ACCEPT GUTTERS TO LAP UNDERNEATH REAR 6 SIDE <br /> 22. ALL TRIM WORK TO BE APPLIED PRIOR TO SIDING MATERIALS(SIDING TO <br /> BUTT UP TO TRIM WORK) ELEVATION5 <br /> 23. CEILING OF EXTERIOR BACK DECK TO BE FLAT. 'C'ELEVATION <br />