Laserfiche WebLink
sg <br /> W ' <br /> � Szp <br /> O 8 xu <br /> z <br /> w- <br /> )0 a� <br /> 30'-0" 1Z i > <br /> w� <br /> a, wW <br /> xx <br /> o� <br /> sLAB-oN-GRADE m m <br /> STOOP <br /> 6 <br /> P1-4 ; <br /> -------- O <br /> ----- STUB OUT I iz-1 <br /> REBAR 1W E• e <br /> (3 PLACES) ji <br /> W <br /> I I I so7 Z � <br /> TYP W <br /> - I ti I I <br /> ly T. <br /> -0" ib 4'-3Y"�`-4'J' S'-4Yz 6'1„ e•-0,• 2-�' OF,.�H-� <br /> TY �; g of. <br /> 4 <br /> S07 0� <br /> r r 1 <br /> ® I =1 1 I N i== I I I ® II <br /> I IL_J L...fJ L `S � L J L-J L—JI I <br /> w I I f I I H <br /> 00 <br /> v <br /> L J I i � Ll' <br /> -- _ -- --- J 7 LU <br /> Pta- �;. I� Q <br /> I I I I \ ry Af <br /> HD Z <br /> 0 <br /> I I I I I I Z Q <br /> I I I I <br /> S07Uj <br /> LLI <br /> PER PLAN NOTE 1 - m <br /> ELEV VARIES) <br /> ALL FRAMING OR HARDWARE <br /> NOT SHOWN OR SPECIFIED _ <br /> TO REMAIN UNCHANGED I 1'-0Y," j - - F- <br /> LU <br /> STUB OUT I ! I STUB OUT I <br /> STEP STEPLLJ <br /> REBAR 18` { I REBAR 18 ` - > <br /> (3 PLACES) -___ I I (3 PLACES) -- W <br /> - al I <br /> I - FOUNDATION PLAN NOTES. O U- <br /> STEP I I I Q P I i I. ,_ 3 1- S ab on Grade shall be 4 lhlcx.Slab shall be poured over Free Draining Granular Fill per Geottachm i Report See Architectural O <br /> L—IL J L J I I I v' ATTACH 2x PORCH WALLS s07 Draw ngs for Slab Elevation Depression,and Slope requirements <br /> z <br /> DIRECTLY TO PORCH SLAB <br /> r <br /> I I I - <br /> - .. STEP I _ �— "-'' STEP :pER 1T/SO] 2. Cc Joint n Scans are optional but recommended ro control cracking.When used,stab areas between joists shall Q <br /> __ _—__ __ _ _ b I oat U <br /> I I t ,_I S eapproxmatevaquareand4 s or ass, ^ <br /> •.a O 1 ,IL — p� O 0 ————————— ———— ————— — 3 The Contractor shall detemi ne acNal looting elevations based on final grades and ate conditions.Bottom of Foot ngs shall be set LL Z <br /> - F �Q�yp^ i^ %.I � T - m on rnmpelenl properly graded bearing soli below Frost Depth. O <br /> ^' 4. Anchor Bolts for Extenor Slub Walls shall bs in accordance with P1-6 of the Shear Wall Schedule of IIS06,u.o.n. O <br /> HD <br /> I D I I S�pORCH�DE 5. See 1aS06 for Simpson W USP hardware conversion table. <br /> 2'-gi1 <br /> SLAB-ON-GRADE PORCH <br /> _ ATTACH 2x PORCH WALLS LEGEND <br /> --- ------_- DIRECTLY TO PORCH SLAB 4,-„ S07 ,_REFER TO ARCH'L SECTION <br /> 1'-10Yp" PER 121S07 <br /> D3814 FOR FRONT PORCH <br /> SI �- REFER TO ARCH'L SECTION FOUNDATION CONSTRUCTION DETAIL CALDOUT <br /> �2-1'.Yj' D38/4 FOR FRONT PORCH 8'-1" 3'-9' 15'-3" 1'-SYs" SX.X <br /> FOUNDATION CONSTRUCTION <br /> ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 1/S06 <br /> EXTENDED FRONT PORCH OPTION-ELEV.'A' .-BAN-GRADE PER PLAN NOTE 1 G <br /> m <br /> L J FOUNDATION WALL y <br /> _ _ H <br /> RAISED FOUNDATION WALL <br /> W <br /> BEARING OR SHEAR WALL ABOVE a <br /> S FW N CRAWL SPACE POST BELOW <br /> 0 <br /> O FOOTING CALL-OUT SEE 5/S07 > <br /> K <br /> STEP STEP TOP OF STEM WALL <br /> 1/4v1'-0" 0 1 2 4 8 16 S 0 2 A <br />